The invention discloses a method for paving a prefabricated concrete
bridge deck. The paving device includes a support column, the upper surface of the support column is fixedly connected with the bottom layer of the
bridge deck, and the upper surface of the bottom layer of the
bridge deck is provided with an
insertion groove. The inner wall of the plug-in slot is slidably connected with a plug-in board, the lower surface of the plug-in board is fixedly connected with a slide bar, the upper surface of the plug-in board is fixedly connected with a pavement board, and the side of the pavement board is fixed A first clamping board is connected, a second clamping board is fixedly connected to the front of the paving board, and an
asphalt layer is fixedly connected to the upper surface of the paving board. The prefabricated concrete bridge
deck pavement device of the prefabricated short T girder is provided with support columns, the bottom layer of the bridge
deck, a plug slot, a plug board, a sliding strip, a pavement board, a first clamping board, a second clamping board,
asphalt Layer, drainage groove, connection layer,
surface layer and gravel layer, so as to make the prefabricated concrete bridge
deck of the prefabricated short T-beam easy to repair and replace in the later stage.