The invention discloses a water-light-storage long-term and short-term collaborative scheduling optimization method, which belongs to the technical field of
hydropower and photovoltaic complementary operation, and comprises the following steps: simulating a short-term typical annual runoff process and a photovoltaic process based on multiple scenes; in real-time economic operation, according to a water-light
complementation relation, a priority
internet access sequence is made, and a water-light-storage
complementation strategy is determined; on the basis of the above steps, a target function with the maximum
generating capacity as a target is constructed based on the obtained long-term photovoltaic power abandoning curve and the obtained long-term pumping storage utilization photovoltaic curve, then a water-light-storage complementary
system model is constructed by combining constraint conditions, the water-light-storage complementary
system model is solved by adopting a discrete differential
dynamic programming algorithm, and a medium-and-long-term
optimal scheduling sample is obtained; the available energy is adopted as an input variable, so that a complementary
scheduling function is fitted; and
water resources can be more effectively utilized through the complementary
scheduling function, so that the hydroelectric
generating capacity is improved. And meanwhile, the scheduling flexibility of the
hydropower station can be better matched with the
instability of
photovoltaic power generation, so that the
utilization rate of
photovoltaic power generation is improved.