The invention discloses a construction method for a deeper
elevator well or a water collecting well. The construction method comprises the following steps that 1, after the foundation pit earthwork of the
elevator well or the water collecting well is completed, the plain refilling, plain concrete reinforcing pad layer construction, bottom waterproof coil material layer construction and fine stone concrete
protection layer construction are sequentially completed; 2, a side wall plain concrete blank is manufactured, the plain refilling is carried out outside the plain concrete blank in a laminated ramming way, a side wall waterproof coil material layer and a protection
brick wall are sequentially arranged at the inner wall of the plain concrete blank, in addition, a
water stop screw bolt is embedded in the protection
brick wall, and a space surrounded by the protection
brick wall and the fine stone concrete
protection layer is a water collecting well pit; 3, in the water collecting well pit, the
water stop screw bolt is used for binding steel bars for manufacturing a wall
toe hanging mold template and an integral vertical mold template, the concrete is cast for completing the construction of the whole
elevator well or the water collecting well. The construction method has the advantages that the waterproof layer damage due to submersible water seeping through the blank can be prevented, the waterproof capability is improved, in addition, the upward floating of the template can be prevented, and the construction quality of the concrete is improved.