The invention discloses a user
demand side power distribution network
planning method based on multi-load optimal configuration, and the method comprises the steps: obtaining the historical capacity
record of each enterprise user in each manufacturing type industry in an industrial
production area, and obtaining the average daily capacity
power consumption of each enterprise user in each manufacturing type industry; the estimated daily average calling electric quantity of the industrial
production area power distribution network is analyzed, and the corresponding estimated electric quantity calling is performed, so that the power supply efficiency of the power distribution network in the
smart power grid is improved, and the safe and reliable operation of the power distribution network in the
smart power grid is ensured; meanwhile, corresponding planning and
processing measures are taken according to the
electric energy quality of each enterprise user power distribution
branch in each manufacturing type industry in the industrial
production area, so that the production continuity and efficiency of the enterprise users are improved, and the production cost of the enterprise users is reduced; and the actual
power consumption of each enterprise user for producing a
single product in each manufacturing type industry is obtained, so that the
power management accuracy of the
smart power grid is improved.