Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

1044results about How to "Avoid Overloading" patented technology

Dynamic bandwidth management responsive to access link state in redundant network topologies

Methods, apparatuses and systems allowing for dynamic bandwidth management schemes responsive to the state of a plurality of access links in redundant network topologies. In one embodiment, the present invention provides a bandwidth management device that periodically queries routing systems associated with access links, conceptually grouped into a virtual access link, to monitor that load of the access links and, depending on the detected load, adjust the configuration of the bandwidth management device to avoid overloading one or more of the access links. Embodiments of the present invention increases network efficiency and help network traffic to flow more smoothly with higher throughput. In one embodiment, the dynamic link control functionality is invoked when any given access link reaches a threshold capacity level. Assuming that network traffic will scale in the same ratio as presently observed, the present invention calculates the maximum traffic that can be let through so that no network interface or access link is overloaded.
Owner:CA TECH INC

Managing timeline modification and synchronization of multiple media streams in networked client/server systems

In a client / server network system, multimedia content is streamed from one or more servers to the client. The multimedia content includes multiple media streams that can be streamed to the client from the same server or from different servers. The user is able to modify the playback speed of the multimedia content, allowing the playback to be either speeded up or slowed down.
Owner:MICROSOFT TECH LICENSING LLC

System of generating motion picture responsive to music

In a system for animating an object along a music, a sequencer module sequentially provides music control information and a synchronization signal in correspondence with the music to be played. A parameter setting module is operable to set motion parameters effective to determine movements of movable parts of the object. An audio module is responsive to the synchronization signal for generating a sound in accordance with the music control information to thereby play the music. A video module is responsive to the synchronization signal for generating a motion image of the object in matching with progression of the music. The video module utilizes the motion parameters to basically control the motion image, and utilizes the music control information to further control the motion image in association with the played music.
Owner:YAMAHA CORP

Smart charge system for electric vehicles integrated with alternative energy sources and energy storage

A charging system for electrical vehicle batteries has a smart charge power meter with a computer control system to measure and integrate the delivered electrical power, enable / disable the charging stations and make all of the other necessary purchasing transaction steps equivalent to a gas station operation. The system may collect electricity by using whatever alternative energy system is available or can be incorporated into the charging system when it is constructed. The system may store the collected electricity in a high capacity energy storage system. The charging takes place at a charging lot which is within a secure perimeter to assure safety and prevent vandalism. The siting of charging lots is chosen to coincide with locations where vehicles are usually parked for extended times (e.g., parking lots, businesses, etc.).
Owner:GU GONG EN +2

Multipurpose storage device and method

A convertible device that converts between an activity mat and a storage container to capture and store numerous articles. Upon reclosing the activity mat, the articles are recaptured into the storage container. The device includes walls and a base, webbing connected between each adjacent wall pair, and a joint connected between the base and walls so that they are foldable into a third configuration wherein the footprint of the folded device is roughly the size of the base. In the third configuration, the walls are stacked relative to the base. The convertible device may further include two zippers for releasably holding the walls in a rigid and upright position in the first configuration. The webbing can be inwardly biased such that when the walls are urged from the second to the first configuration, the webbing folds toward the interior of the convertible device.
Owner:MIEH INC

Pipe joint

PCT No. PCT / DE95 / 01059 Sec. 371 Date Apr. 2, 1997 Sec. 102(e) Date Apr. 2, 1997 PCT Filed Aug. 1, 1995 PCT Pub. No. WO96 / 07044 PCT Pub. Date Mar. 7, 1996A pipe joint with a sleeve element and with a spigot element configured to be threadedly connected together to collectively absorb the load experienced by the joint over the threaded sections of the sleeve and spigot. By suitably selecting the leads and tooth gaps in the sleeve or spigot, it is possible for the guide flank at one thread end to be braced against the load flank at the other thread end thereby effecting maximum bracing at the edges of the thread and decreasing toward the thread center.
Owner:MANNESMANN AG

Workload scheduler with resource optimization factoring

A workload scheduler supporting an efficient distribution and balancing of the workload is proposed. The scheduler maintains (383-386) a profile for each job; the profile (build using statistics of previous executions of the job) defines an estimated usage of different resources of the system by the job. The scheduler tends to select (318-342) the jobs with complementary resource requirements (according to a combination of their attributes); this process can be carried out using either a heuristic approach (318-334) or an optimization approach (335-342). As a result, the jobs that will be submitted are very likely to consume different resources of the system; in this way, any contention for the different resources is strongly reduced.
Owner:TREND MICRO INC

A method and system for realizing ETL scheduling

The application discloses a method for realizing ETL scheduling, which includes: determining at least one task required to perform based on the preset task configuration file including various tasks required to perform by completing the ETL scheduling and the dependency relationship between these tasks; acquiring the resource information of each application server, and comparing it with the restriction condition corresponding to the at least one task, and screening these application servers based on the comparative result, and selecting an application server to perform the at least one task; allocating the at least one task to the selected application server and indicating the application server to implement the at least one task based on the set program code. So that the centralization management of the application server resources is realized, to reasonable allocate the application server resources in the system, accordingly realizing the system load balancing. The application also discloses a management system.
Owner:ADVANCED NEW TECH CO LTD

Method and apparatus for scheduling transmissions in wireless data networks

A method and apparatus for scheduling data transmissions is disclosed that reduces the delay variability in transmissions of data. A scheduling metric is calculated as a function of a TCP throughput rate for each mobile terminal in the system. The relative value of this metric for a user is used to schedule data transmissions from that user. As a result, TCP time-outs are reduced or avoided and the throughput and the predictability of system performance are increased.
Owner:LUCENT TECH INC

Multipurpose storage device and method

A convertible device that converts between an activity mat and a storage container to capture and store numerous articles. Upon reclosing the activity mat, the articles are recaptured into the storage container. The device includes walls and a base, webbing connected between each adjacent wall pair, and a joint connected between the base and walls so that they are foldable into a third configuration wherein the footprint of the folded device is roughly the size of the base. In the third configuration, the walls are stacked relative to the base. The convertible device may further include attachment means for releasably holding the walls in a rigid and upright position in the first configuration. The webbing can be inwardly biased such that when the walls are urged from the second to the first configuration, the webbing folds toward the interior of the convertible device.
Owner:MIEH INC

Method and device for monitoring the load on hydraulic powered shield supports for underground mining

According to the invention, monitoring the load on hydraulic powered shield supports in underground use is performed by using the controller (13) serving for extraction control, which is equipped with microelectronics for load monitoring and load control, the components of the powered shield support being assigned sensors (14 to 18) whose electric measured values are used by the controller (13) for evaluating the measured signals and for driving the hydraulic rams (6, 7) and / or the angle cylinder (11) assigned to the powered shield support. The load control is preferably designed here in such a way that the critical load situations "one-sided loading" and / or "tip-toeing" are detected as early as during the setting operation, with the aid of appropriate sensors, and are rendered non-damaging in their effect by appropriately driving the hydraulic rams and / or the angle cylinder.
Owner:CATERPILLER GLOBAL MINING EURO GMBH

Memory requirements for mobile terminals

A method of storing electronic data in a system having a mobile terminal (8) and a remote system (1), the mobile terminal (8) and the remote system (1) interacting with each other to exchange electronic data. In order to prevent data loss at the mobile terminal (8), data storage capacity and storage requirements are monitored at the mobile terminal (8). If a risk exists that the data storage capacity of the mobile terminal (8) is likely to be exceeded, electronic data from the mobile terminal (8) is uploaded to the remote system (1), and stored there. The previously uploaded data is subsequently downloaded from the remote system (1) to the mobile terminal (8) in the event that that data is required by the mobile terminal (8) or a determination is made that the risk of exceeding the data storage capacity of the mobile terminal (8) no longer exists.
Owner:TELEFON AB LM ERICSSON (PUBL)

Wind energy installation with negative sequence system regulation and operating method

A wind energy installation can include a generator which is driven by a rotor and generates electrical power in a multiphase manner for feeding into a network, a converter which is connected to the generator and to the network, and a control system which interacts with the converter and includes a negative sequence system regulation mechanism. The negative sequence system regulation mechanism can include a phase control module configured to determine an electrical variable of the negative sequence system according to the phase. Accordingly, an available current can be provided according to the operating situation for active power or idle power in the negative sequence system regulation mechanism. The negative sequence system regulation mechanism can thus help stabilize the network in the event of asymmetrical network conditions. Also, this relates to a correspondingly equipped wind park and an operating method.
Owner:SENVION DEUT GMBH

System for reclaiming water softener brine waste

InactiveUS20050000902A1Reduce volume of liquidHigh wasteIon-exchanger regenerationSedimentation separationIonSaline water
A method of reclaiming brine waste in a water softener having an inlet, a service water outlet, a wastewater outlet, and having a brine / rinse cycle in which brine solution is directed through a resin bed and to a drain, includes measuring a TDS or specific ion level of the solution exiting the wastewater outlet during the brine / rinse cycle, comparing the measured TDS or specific ion level with a preset value, and diverting the flow of water out the outlet to a reclamation location once the measured TDS exceeds the preset value. A waste reclamation unit includes a housing in fluid communication with the water softener and at least one waste reservoir, a compressor, a compressor coil, a control unit configured for sensing the introduction of liquid into the reservoir and for triggering the compressor; and a collection pan configured for collecting water condensing on the coil and preventing the entry of water into the waste reservoir.
Owner:BANK OF AMERICA N A

Deactivation of micro cells in cellular wireless networks

A cell ranking algorithm for power saving in a cellular wireless network having a heterogeneous network structure of macro and micro cells. The algorithm determines when and which micro cells in the network can be deactivated, by which the power consumption of the network can be reduced. A micro cell (Micro d) having a traffic load below a threshold value is deactivated and its load is assigned to adjacent macro cells (Macro a, Macro b) acting as compensation cells. The proposed algorithm is based on the comprehensive consideration of factors that have influence on the power saving of the network and the balance between the traffic load (or quality of service) and the energy saving.
Owner:FUJITSU LTD

Load monitoring system

A load monitoring system (5) is used to monitor the loading of a vehicle (1) by a load handling system (2) which is movable through a loading cycle to load a payload module (3) onto the vehicle (1) from the ground (4). The load monitoring system (5) comprises sensors (53) for sensing positional information and loading force information of the load handling system (2) at multiple positions during the loading cycle. A data processor (54) uses this information to calculate the mass of the payload module (3) and the position of the centre of gravity (31) of the payload module (3).
Owner:HAKKINEN SEPPO

Method and network nodes for reporting at least one dropped-out connection path withing a communication network

InactiveUS20070110079A1Fast transferRouting loops will be avoidedData switching by path configurationRouting tableComputer network
A network node in the communication network is a target network node, connected by a first communication path with at least one first and one second network node, connected to each other by means of a further communication path. A routing table is held in each network node. The direct communication path from the first network node to the target network node is entered in the routing table of the first network node as the primary routing path and the path leading from the first network node to the second network node and then to the target network node is entered as the reserve routing path. An analogous entry is made in the routing table of the second network node. The relevant reserve routing path is only used on disruption of the primary routing path. A disruption in the primary communication path, provided between the first network node and the target network node is reported by the first network node, by means of a message sent to the second network node. This controls the second network node such that, on a drop-out of the primary connection path thereof to the target network node, a transmission of data packets to the target network node by means of the reverse routing path, leading from the second network node to the target network node via the first network node, is prevented.
Owner:NOKIA SIEMENS NETWORKS GMBH & CO KG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products