Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

53 results about "Hydrograph" patented technology

A hydrograph is a graph showing the rate of flow (discharge) versus time past a specific point in a river, channel, or conduit carrying flow. The rate of flow is typically expressed in cubic meters or cubic feet per second (cms or cfs). It can also refer to a graph showing the volume of water reaching a particular outfall, or location in a sewerage network. Graphs are commonly used in the design of sewerage, more specifically, the design of surface water sewerage systems and combined sewers.

Water level monitoring system based on image processing and method

The invention discloses a water level monitoring system based on image processing and a method, which mainly solve the problem that water level cannot be monitored automatically in the prior art. The water level monitoring system comprises a water level gauge, a water level image processing module, a wireless communication module and a central management server module. Working principle of the system is that: firstly the water level gauge is used for marking the water level, water level images marked by the water level gauge can be collected by a camera, the water level image processing module further performs automatic positioning, skew correcting and recognizing on the water level gauge in the water level images to obtain water level data and transmits the water level data to the wireless communication module through a wireless communication network, then the wireless communication module transmits the received water level data to the central management server module which stores the received water level data into a computer data base so as to draw current hydrograph in real time, when the current water level is higher than a preset water level, alarm information can be given out, and accordingly automatic monitoring of the water level can be achieved.
Owner:XIDIAN UNIV

Method for forecasting water burst flood peak and peak time for karst tunnel underground river

The invention discloses a method for forecasting water burst flood peak and peak time for a karst tunnel underground river. The method comprises the following steps: (1) computing point rainfall; (2) determining areal rainfall according to the point rainfall; (3) computing effective precipitation according to the areal rainfall; (4) computing time interval unit hydrograph; (5) computing effective precipitation unit hydrograph according to the time interval unit hydrograph; (6) computing surface runoff according to the effective precipitation and the effective precipitation unit hydrograph; (7) computing subsurface runoff; (8) adding the surface runoff at each time interval and the subsurface runoff at the corresponding time intervals to obtain flood discharge; (9) performing fitting on value of the flood discharge to obtain a flood hygrograph; and (10) obtaining the flood peak and the corresponding peak time on the flood hygrograph and determining construction time for a karst tunnel according to the flood peak and the corresponding peak time. According to the method provided by the invention, the water burst flood peak in the tunnel and the arrival time of the flood peak can be accurately forecasted, so that the construction time for the tunnel can be reasonably arranged, and the lives of people and the safety of mechanical equipment can be ensured.
Owner:CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP

Method for regulating and controlling limited downslope tillage of corroded slope farmland

The invention discloses a method for regulating and controlling limited downslope tillage of a corroded slope farmland, which comprises the following steps of: firstly dividing each land block on the slope farmland into a plurality of small farming units along the contour direction; and then carrying out downslope tillage on each farming unit. The land blocks are respectively divided into a plurality of small farming units through horizontal ditches or ridges. In the invention, flow lines of sheet flows are cut by dividing the length of the slope; a runoff quantity hydrograph is smoother than that of the original slope surface; the water flow speed of the slope surface is reduced; the resistance time of the sheet flows on the slope surface is prolonged; infiltration is increased; the surface runoff is reduced; the sediment transport capacity of the flow is obviously reduced; soil losses are greatly reduced; and the water and soil conservation capacity of the slop farmland can be effectively improved. The method is simple, convenient and labor-saving to operate, can achieve the effect on soil and fertility conservation by adopting simple measures, has small investment and a low cost and has the characteristics of high efficiency, practicality, convenience for farmers to receive and the like.
Owner:CHONGQING NORMAL UNIVERSITY

Linear reservoir retention confluence and nested watershed (multiple sub watersheds) confluence method

ActiveCN104281780AAvoid parameter problemsSimulation results are objectively scientificSpecial data processing applicationsHydrometryEvaporation
The invention discloses a linear reservoir retention confluence and nested watershed (multiple sub watersheds) confluence method. The method includes collecting long series data of rainfall capacity, evaporation capacity and runoff volume of a researched watershed; calculating a runoff generation process according to the rainfall capacity, the evaporation capacity and the runoff volume by a hydrological model; taking a confluence path in the watershed as N linear reservoirs in series connection by the Nash linear reservoir method to acquire a Nash instant unit hydrograph, wherein the previous water reservoir becomes an inflow of the next water reservoir; introducing a retention factor alpha to describe the water-holding capacity of the linear water reservoirs; simulating the Nash instant unit hydrograph by a binomial to improve a confluence method of the hydrological model. The advantage that the instant unit hydrograph describes the watershed confluence process in terms of time and space is kept, and the complex parameter problems in application are avoided, so that the method is applicable to hydrological simulation of large watersheds, and particularly, has significant practical value in research on water circulation of the watersheds under climate change. The method is simple and convenient to apply, and simulation results given by the method are objective, scientific and high in accuracy.
Owner:NANJING HYDRAULIC RES INST

Method for constructing geomorphologic unit hydrograph distinguishing confluence speed differences of slope surface and channel

The invention provides a method for constructing a geomorphologic unit hydrograph distinguishing confluence speed differences of a slope surface and a channel. The method comprises the steps of calculating flow directions of grids by adopting a D8 algorithm firstly based on digital elevation model (DEM) grid data, extracting a watershed system, and distinguishing the grids into slope surface grids and channel grids; calculating confluence speeds of raindrops during motion on the slope surface and in the channel; calculating the time for reaching a watershed outlet by the raindrops according to specific confluence paths of the raindrops, performing statistics on the number of the raindrops reaching the watershed outlet in each time segment delta t, and calculating percentages of the number of the raindrops in all time segments in a total grid number, namely, coordinate values of an S curve at the moments delta t, 2 delta t, 3 delta t, ......, and n delta t; and calculating a non-dimensional t-hour unit hydrograph and a unit hydrograph of the watershed according to the obtained S curve conveniently. According to the method, the t-hour unit hydrograph of any time segment of the small watershed in the mountainous and hilly area can be conveniently obtained, and flood analysis calculation can be performed in areas without or lack of hydrological data.
Owner:CHINA INST OF WATER RESOURCES & HYDROPOWER RES

An intelligent drainage pump station based on SWMM model for pump group optimal dispatching and early warning disposal

The invention relates to an intelligent drainage pump station for pump group optimal dispatching and early warning disposal based on a SWMM model, using the rainfall data forecasted by weather forecast as input condition, By calculating and simulating the runoff amount generated by each sub-watershed at any time with different time steps, as well as the discharge and depth of water in each pipeline and river, the invention combines the calculated flood peak hydrograph with the optimization algorithm to seek the best combination of drainage pumps, and provides an intelligent decision-making anddispatching scheme. The invention calculates the quantified pump station discharge based on the mature weather forecast data and the SWMM hydraulic model. According to the rainfall curve and flood peak hydrograph combined with optimization algorithm to achieve the scientific operation of the pump station, for the formulation of economic and reasonable disposal program to provide decision-making support. Under the condition of heavy rainfall and extreme rainstorm, the forecast data are put in front of the event disposal, so as to achieve the purpose of early waterlogging judgment and early warning, and reduce the risk of waterlogging occurrence.
Owner:SHANGHAI KAIQUAN PUMP IND GROUP

Calculation method of lake ecological water level

ActiveCN105868579AMake up for not paying attention to biologyMake up for the shortcomings of the ecosystemSpecial data processing applicationsInformaticsVegetationDiffusion
The invention discloses a calculation method of a lake ecological water level. The calculation method comprises the following steps: 1, calculating the water level value of a germination stage: A, finding or establishing a lake water level-area; B, calculating the area of a germination region of hygrophytes and emergent aquatic plants under a given water level; C, calculating the germination area of submerged plants; D, calculating the area of a germination region of aquatic plants; E, calculating the coverage degree of the hygrophytes and emergent aquatic plants and the submerged plants under the given water level; F, calculating the total area of the germination regions of the aquatic plants under different water levels according to step sizes; G, using a water level-vegetation coverage degree relation; 2, calculating the ecological water level value of a seedling growth period; 3, calculating the ecological water level values of growth and diffusion periods; 4, calculating the ecological water level value of a mature period; 5, calculating the ecological water level value of a seed dispersal period; 6, calculating the water level value of a dormancy period; 7, calculating a lake ecological water level hydrograph. The calculation method is simple in calculation process and parameters, and can be widely used in evaluation of ecological water levels of shallow lakes in subtropical areas.
Owner:INST OF AQUATIC LIFE ACAD SINICA

Novel sun-prevention commuting case

The invention discloses a novel sun-prevention commuting case and relates to a cable cross-connection cabinet. The commuting case comprises a case body, wherein a hollow cylinder is arranged on the case body, a lifting cylinder is arranged in the hollow cylinder, a supporting column is arranged on the top of the lifting cylinder, ribs are arranged on the supporting column and comprise lower nests, stop blocks are arranged on the supporting column, an annular iron ring is arranged on the top of the supporting column, first electromagnets are arranged on the lower nests, an annular supporting plate is further arranged on the lifting cylinder, a motor is arranged on the annular supporting plate, a crank device is arranged on the motor and makes contact with the lower nests, an electronic thermometer and a hydrograph are further arranged on the case body, and water leakage holes are formed in the bottom of the hollow cylinder. Compared with the prior art, strong sunlight can be prevented from directly irradiating to the commuting case, and meanwhile, rainwater can also be blocked on rainy days and prevented from entering the case body. Not only is the problem that because sunlight in summer is strong in the past, the temperature of an outdoor commuting case is too high, and operation of internal electronic components are influenced solved, but also the problem that rainwater leaks into the commuting case on rainy days is solved.
Owner:NINGBO TIANYUN TELECOMM EQUIP

Urban river network waterlogging prevention optimal scheduling method

InactiveCN112112240AReduce waterloggingGive full play to the role of regulation and storageForecastingDesign optimisation/simulationRiver networkRainfall runoff
The invention relates to an urban river network waterlogging prevention optimal scheduling method. The method comprises the steps that basic data of all rainwater sub-catchment-areas on the upstream of an urban river network are acquired, SWMM models are constructed correspondingly, rainfall runoff simulation is conducted by inputting rainfall hydrographs, and discharge curves of rainwater pipe network drainage ports of all the sub-catchment-areas are acquired; basic data of an urban river network system is acquired, a river network SWMM model is constructed, the discharge curves, of the drainage ports, acquired in S1 are taken as inflow of the river network model, and the model is used for calculating a system overflow amount and a river and lake water level hydrograph under a specific scheduling strategy; a river network system waterlogging prevention optimal scheduling model is constructed, which comprises an optimized objective function and a decision variable, and optimization isconducted on the decision variable on the basis of a differential evolution algorithm; and coupling of the optimal scheduling model based on the differential evolution algorithm and the SWMM model isrealized in a Python environment, and an optimal waterlogging prevention scheduling strategy of a river network system is iteratively calculated. The method is good in robustness and high in reliability, and the obtained scheduling strategy is beneficial to exerting the regulation and storage capacity of the urban river network system in urban inland inundation.
Owner:TONGJI UNIV

Method for determining scouring efficiency of water-impermeable surface runoff pollutants on basis of isochrone method

The invention discloses a method for determining scouring efficiency of water-impermeable surface runoff pollutants on basis of an isochrone method and belongs to the cross field of municipal engineering and environment monitoring. A study area is generalized on the basis of monitoring of the surface runoff pollutants, and runoff speed determination, isochrone division and isochrones area determination are performed with the unit time as the dividing point; next, a water outlet flow hydrograph is drown according to isochrones, the pollutant load capacity Mt in the time period is obtained after the difference between the surface runoff pollutant concentration Ct monitored in each time period and the natural rainfall concentration C0 is multiplied by the corresponding flow Qt; then, the total load capacity sigma M is obtained by accumulating runoff pollutant loads in all time periods, and the delta value is obtained by comparing the sigma M with the pollutant load capacity M of surface swept matter before rainfall; finally, the value range of delta is obtained according to multiple rainfalls, and the magnitude range of the surface runoff pollutant load sigma M formed by certain rainfall in the future is estimated through reverse calculation of delta. The method is simple and easy to understand and is applied and verified.
Owner:BEIJING UNIV OF TECH

Prediction method of flood peak value and peak time of storm water inrush from underground river in karst tunnel

The invention discloses a method for forecasting water burst flood peak and peak time for a karst tunnel underground river. The method comprises the following steps: (1) computing point rainfall; (2) determining areal rainfall according to the point rainfall; (3) computing effective precipitation according to the areal rainfall; (4) computing time interval unit hydrograph; (5) computing effective precipitation unit hydrograph according to the time interval unit hydrograph; (6) computing surface runoff according to the effective precipitation and the effective precipitation unit hydrograph; (7) computing subsurface runoff; (8) adding the surface runoff at each time interval and the subsurface runoff at the corresponding time intervals to obtain flood discharge; (9) performing fitting on value of the flood discharge to obtain a flood hygrograph; and (10) obtaining the flood peak and the corresponding peak time on the flood hygrograph and determining construction time for a karst tunnel according to the flood peak and the corresponding peak time. According to the method provided by the invention, the water burst flood peak in the tunnel and the arrival time of the flood peak can be accurately forecasted, so that the construction time for the tunnel can be reasonably arranged, and the lives of people and the safety of mechanical equipment can be ensured.
Owner:CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP

Water landscape design method enabling flow characteristics of tidal floods rarely happening to reappear scientifically

The invention provides a water landscape design method enabling flow characteristics of tidal floods rarely happening to reappear scientifically. Actual measurement terrain, geological data and hydrologic data of a natural river course are collected; the range of model, the number of section boards and adopted materials are determined according to a similarity criterion; a lofting section is selected from an actual measurement topographic map, and a model section board the same as a natural riverbed in form is manufactured; a control wire of the model is determined, a model side wall line is designated, a horizontal control network and a vertical control network are made, a bench mark is set, and the model is installed according to a river course topographic map; actual measurement runoff flow hydrographs and river mouth actual measurement tide tide-level hydrographs of dry season typical days and flood typical days of a natural river hydrometric station are verified; flow rates of corresponding sections of a natural riverbed are verified; erosion and deposition verification is carried out on the actual measurement topographic map of the natural river course and the model before and after channel forming discharge occurs; a water circulation system is established, so that water landscapes designed according to the method have extremely high academic value and added economic value.
Owner:FUJIAN PROVINCIAL INVESTIGATION DESIGN & RES INST OF WATER CONSERVANCY & HYDROPOWER

Water level monitoring system based on image processing and method

The invention discloses a water level monitoring system based on image processing and a method, which mainly solve the problem that water level cannot be monitored automatically in the prior art. The water level monitoring system comprises a water level gauge, a water level image processing module, a wireless communication module and a central management server module. Working principle of the system is that: firstly the water level gauge is used for marking the water level, water level images marked by the water level gauge can be collected by a camera, the water level image processing module further performs automatic positioning, skew correcting and recognizing on the water level gauge in the water level images to obtain water level data and transmits the water level data to the wireless communication module through a wireless communication network, then the wireless communication module transmits the received water level data to the central management server module which stores the received water level data into a computer data base so as to draw current hydrograph in real time, when the current water level is higher than a preset water level, alarm information can be given out, and accordingly automatic monitoring of the water level can be achieved.
Owner:XIDIAN UNIV

Method for determining waterway dredging mud dumping time period on basis of sediment loss rate minimum criterion

The invention discloses a method for determining a waterway dredging mud dumping time period on the basis of a sediment loss rate minimum criterion, and relates to a general operation method of an excavator or a dredger, in particular to a method for controlling the mud dumping operation time of a waterway dredging ship by selecting the mud dumping time period according to hydrodynamic data of dredged soil and sediment. The method comprises the following steps that 1, water-sediment movement observation is conducted on the periphery of a mud dumping pit, and on-site test data and tidal data are acquired; 2, the critical starting shear stress and the critical starting flow velocity of the dredged soil and sediment are determined; 3, the hydrodynamic force at the position of the mud dumping pit is calculated, and a flow velocity hydrograph is drawn; 4, the mud dumping time period of the corresponding mud dumping pit is determined on the basis of the sediment loss rate minimum criterion. According to the method, the mud dumping operation time of the waterway dredging ship is controlled by selecting the mud dumping time period in a targeted mode, therefore, the sediment loss rate in the mud dumping process can be decreased by about 30%, the utilization rate of the dredged soil can be increased, and great economic benefits are brought.
Owner:SHANGHAI ESTUARINE & COASTAL SCI RES CENT

Small watershed short-term flood forecasting method based on typical design flood hydrograph

The invention discloses a small watershed short-term flood forecasting method based on a typical design flood hydrograph. The small watershed short-term flood forecasting method comprises the following steps: S1, obtaining design flood peak flow and the typical design flood hydrograph of a small watershed river channel in different years; s2, judging whether the riverway starts to perform short-term flood forecasting or not according to the actual measurement flow; s3, determining the forecasting time of short-term flood forecasting according to the actually measured flood flow of the riverway; s4, determining a slope Kn according to the typical design flood hydrograph of the corresponding age limit; s5, determining the predicted flood flow q'n + 1 at the moment tn + 1 according to the actually measured flood flow qn and the slope Kn at the moment tn; s6, judging whether short-term flood forecasting can be ended or not according to the actually measured flood flow at the moment tn + 1;s7, correcting the age limit Tn of the design flood hydrograph for calculating the slope Kn according to the actually measured flood flow qn + 1 at the moment tn + 1 and the predicted flood flow q'n+ 1 at the moment tn + 1; and S8, ending the short-term flood forecasting. Compared with an existing flow algorithm and a corresponding water level method, the method has the advantages of being simple, rapid and the like.
Owner:SICHUAN UNIV

Method for extracting temperature time hydrograph in concrete temperature-control optical fiber temperature measuring host

The invention discloses a method for extracting a temperature time hydrograph in a concrete temperature-control optical fiber temperature measuring host. The file format of original temperature data results of temperature monitoring records in the optical fiber temperature measuring host is researched; a corresponding relationship between a rear-time monitoring curve measuring point and an optical fiber practical position in the optical fiber temperature measuring host is built; then a communication relation between a VB module and a temperature data storage file in the host is developed in the optical fiber temperature measuring host; the VB module is developed, a data post-processing module is added into real-time monitoring software of the optical fiber temperature measuring host, and then a processed database file is called; set corresponding controls are triggered, corresponding post-processing database result data is called, and the temperature time hydrograph of any point that technicians want to pay attention to is screened out. The method for extracting the temperature time hydrograph of a target point from the host by means of the VB language is efficient and precise, data is directly screened through a second processing module in the host, and technicians can conveniently check the temperature time hydrograph of any point at any time.
Owner:CHINA POWER CONSRTUCTION GRP GUIYANG SURVEY & DESIGN INST CO LTD

River ecological runoff assessment method based on flow hydrograph

The invention discloses a river ecological runoff assessment method based on a flow hydrograph, and belongs to the field of ecological hydrology, and the IPC classification number of the river ecological runoff assessment method is E02B1 / 00. The evaluation method comprises the steps of obtaining a lower quartile flow hydrograph and an upper quartile flow hydrograph according to a hydrometric station year-by-year flow hydrograph, and defining monthly runoff calculated by the two flow hydrographs as monthly minimum ecological water demand and monthly maximum ecological water demand respectively, wherein the ratio of the runoff volume lower than the lower quartile flow hydrograph in each month to the minimum ecological water demand of the month is a monthly ecological deficit, and the ratio of the runoff volume higher than the upper quartile flow hydrograph in each month to the maximum ecological water demand of the month is a monthly ecological surplus; and the annual ecological surplus or the annual ecological deficit is the sum of all monthly ecological surplus or ecological deficit in the whole year. According to the method, the defects of an existing flow duration curve method are overcome, and the health condition of a river ecosystem can be better reflected.
Owner:HENAN UNIVERSITY

A rainfall process design method for regional rainfall artificial simulation system

The invention discloses a rainfall process design method for a regional rainfall artificial simulation system. The method comprises the steps of acquiring spatial geographic information of a researchbasin and introducing a model basin obtained by zooming out the spatial geographic information according to a set proportion into an indoor rainfall region; on the basis of a spatial division structure of the regional rainfall artificial simulation system, dividing the indoor rainfall region into several blocks and marking the blocks where the model basin is located as basin sub-blocks; adopting the daily rainfall measured by a rainfall station in the research basin and the weight of the rainfall station and basin sub-blocks for calculating the daily rainfall of the basin sub-blocks; calculating the outdoor hourly rainfall of the model basin by using the daily rainfall of the basin sub-blocks, a rainfall and rain force relationship model, the rainfall duration and the proportion of the model basin in each basin sub-block; calculating the outdoor net rainfall of the model basin; calculating an outdoor instantaneous unit line of the model basin; constructing a T-hour unit hydrograph of outdoor net rain according to the instantaneous unit line; calculating the indoor net rainfall of the model basin according to the T-hour unit hydrograph.
Owner:CHINA INST OF WATER RESOURCES & HYDROPOWER RES

A Design Flood Calculation Method for Small Watershed

The invention discloses a design flood calculation method for a small watershed. Determine the hydrological station downstream of the small watershed, and obtain information such as the DEM map of the watershed above the hydrological station. Load the obtained information into the GIS software, extract the drainage system of the basin, cut it, divide it into multiple natural sub-basins, assign hydrological identification numbers, add hydrological units, and generalize the basin map. Obtain the rainfall runoff process of the annual maximum flood at the outlet section of the watershed above the hydrological station, and establish the hydrological model of the watershed above the hydrological station, so as to obtain the small watershed hydrological model parameters that can reflect the rainfall runoff process information of the small watershed to be calculated and designed. The method of calculating the hydrological frequency calculates the design rainstorm of the small watershed, and brings the design rainstorm into the well-defined small watershed hydrological model to derive the design flood process line of the small watershed. The invention realizes the design flood with higher precision that can reflect the information of the rainfall and runoff process in the small watershed through simple operations.
Owner:CHINA THREE GORGES UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products