Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

32results about How to "Flexible resources" patented technology

Multi-service isolation method for power wireless private network system

ActiveCN109618413ARealize full isolationMeet the needs of air interface isolationTransmission monitoringWireless communicationResource poolFrequency spectrum
The invention relates to a multi-service isolation method for a power wireless private network system. The method comprises the following steps: scanning frequency resources and counting interferences, configuring control and data channel resource pools, broadcasting the service list and channel resources, knowing randomly accessed resource pools, establishing a connection and reporting the service ID, and configuring base station control and data channel resources. The method adopts the spectrum sensing technology to obtain the frequency use and interference situation in the spectrum range of230 MHz to effectively evaluate interference levels of each frequency sub-band, requires timely avoiding when the frequency point is used and the interference is large, dynamically selects non-interference or less-interference sub-bands. updates the allocatable frequency resources, allocates dedicated resources for high-priority services, configures multiple transmission resource pools that are physically isolated from each other for use of different types of services, and supports flexible configuration of multiple transmission resource pools to adapt to regional differences in spectrum resources and terminal distribution differences to improve resource utilization efficiency.
Owner:SHANGHAI INST OF MICROSYSTEM & INFORMATION TECH CHINESE ACAD OF SCI

SDN network bandwidth control method and SDN network bandwidth control system

The invention provides an SDN network bandwidth control method and an SDN network bandwidth control system. The SDN network bandwidth control method comprises the following steps: setting one or more time slots, wherein each time slot is formed from beginning time to ending time; setting one or more node ranges, wherein each node range is formed from one beginning network node address to one ending node network address; setting a restricted bandwidth value corresponding to each of the time slots and / or the node ranges; obtaining current time, and determining whether the current time is located in the set time slots; obtaining current node, and determining whether the current node is located in the set node ranges; distributing bandwidth according to the restricted bandwidth value distributed in the current time where the time slot is located and the current node where the node range is located. Through software implementation and low cost, time-division and node-division bandwidth distribution is carried out according to the difference of different applications in corresponding positions of preset time slots and node ranges, so that the resources are flexibly distributed, network congestion and network redundancy are prevented, and the bandwidth availability ratio is effectively improved.
Owner:PHICOMM (SHANGHAI) CO LTD

Optimal scheduling method for providing standby auxiliary service by controllable load cluster

The invention discloses an optimal scheduling method for providing standby auxiliary service by a controllable load cluster. The method comprises the following steps: 1, collecting operation parameters of each controllable load in the load cluster; 2, determining the flexible characteristics of each controllable load according to the operation parameters obtained in the step 1, and constructing anoperation constraint and adjustment capacity model of each controllable load; 3, obtaining electricity price data of each time period of the day-ahead whole day; 4, with the models and the data obtained in the step 2 and the step 3 and with the minimum total cost of the controllable load cluster as the target, establishing an optimization model of controllable load cluster operation and providingstandby capacity; 5, enabling a controllable load aggregator to provide a standby for the power grid and participates in the centralized market according to the result of the step 4, and after marketclearing is completed, acquiring a clearing result which comprises the electricity price, the standby capacity price and the standby capacity needing to be provided in each time period; and distributing the standby capacity to each controllable load.
Owner:STATE GRID HENAN ELECTRIC POWER ELECTRIC POWER SCI RES INST +2

Rapid treatment method for controlling ground surface settlement caused by stratum funnel of large-diameter shield construction

The invention discloses a rapid treatment method for controlling ground surface settlement caused by sudden stratum funnel of large-diameter shield construction. The method comprises the following steps of Exploring the range of the stratum funnel, investigating interval buildings, performing ground monitoring, reinforcing soil below the ground buildings through layer-by-layer deep hole grouting,performing pre-grouting reinforcement on a tunnel and the stratum funnel above the tunnel, and detecting the reinforcement effect. According to the steps, disturbed soil under the building is vertically drilled from the ground for layered grouting reinforcement, a water outlet channel at the bottom of the stratum funnel is sealed and blocked from bottom to top by adopting a grouting process, and besides, the reinforcement effect is inspected by combining multiple modes, so that the continuous safety and stability of the ground building and the tunnel are ensured. The method can solve the problem of ground surface settlement caused by the sudden stratum funnel of large-diameter shield construction, and overcomes the engineering difficulties of large constraint of early-stage exploration means and settlement damage of dense and old buildings on the ground caused by sudden unfavorable geology shield water inflow.
Owner:CHINA RAILWAY 18TH BUREAU GRP CO LTD +1

Wireless resource scheduling method

ActiveCN104822181AImprove collaborationSolve data transmission delayWireless communicationAccess networkControl layer
The application discloses a wireless resource scheduling method. The method is characterized in that the method comprises: a wireless access network is divided into three layers including a physical facility layer, a multi-level control layer, and a center management layer. The physical facility layer includes wireless access points (AP). The multi-level control layer contains at least two levels of control modules; each control module manages a corresponding AP management set; each control module in an activation mode carries out physical resource and wireless resource scheduling on users in a user centralization unit according to a corresponding strategy; and according to the set levels, the control module with the higher level distributes the resources to the control module with the lower level when a set condition is met. The center management layer is formed by a global management entity that is used for deciding state operations and distribution operations of all control modules in the multi-level control layer. On the basis of the technical scheme disclosed by the application, problems of data transmission delay and transmission bottleneck and the like in the large-scale collaborative network can be solved, thereby enhancing the collaborative performance of the network and realizing flexible resource division and management.
Owner:BEIJING UNIV OF POSTS & TELECOMM

Lagerstroemia indica seedling cold storage and high temperature season planting method

The invention provides a lagerstroemia indica seedling cold storage and high temperature season planting method. The method comprises the steps of conducting cuttage breeding production on lagerstroemia indica seedlings in the lagerstroemia indica seedling growth period; digging out the lagerstroemia indica seedlings and binding the lagerstroemia indica seedlings according to bundles in the lagerstroemia indica seedling dormant period; after the lagerstroemia indica seedlings are subjected to sterilization, preservation, water retention and simulation temporary planting, covering the lagerstroemia indica seedlings with plastic film and then putting the lagerstroemia indica seedlings in cold storage. By means of the lagerstroemia indica seedling cold storage and high temperature season planting method, by conducting cuttage breeding production on the lagerstroemia indica seedlings in the growth period, covering the lagerstroemia indica seedlings with the plastic film and putting the lagerstroemia indica seedlings in cold storage after conducting the sterilization, the preservation, the water retention and simulation temporary planting on the lagerstroemia indica seedlings in the dormant period, the lagerstroemia indica seedlings can be transplanted in the high temperature season, soil ball transplanting is not needed, the transplanting survival rate is increased, the transplanting cost is lowered, cross-region pollution of diseases and insects can be prevented, soil resources are protected, so that when lagerstroemia indica is transplanted, requirements on time, climate andtransportation conditions are flexible, and the transplanting cost is saved.
Owner:黄财权

Automatic driving vehicle-mounted multi-target coupling identification and tracking method under heterogeneous traffic flow

InactiveCN112215071AEnsure correctness and validityReduce memory usage and switch energy consumptionCharacter and pattern recognitionNeural architecturesIn vehicleResource assignment
The invention relates to an automatic driving vehicle-mounted multi-target coupling identification and tracking method under heterogeneous traffic flow, and the method comprises a step of establishinga vehicle-mounted embedded application program resource scheduler, and comprises the steps: carrying out the model pruning and restoration of a driving scene identification model; establishing a resource allocation framework for supporting the dynamic state of the deep learning model application program; and establishing a deep learning model to run a resource allocation scheduler, flexibly allocating resources to the deep learning model running concurrently through the resource scheduler, and outputting an optimized scheduling scheme. Memory occupation and switching energy consumption of thedeep learning model on the mobile vision device can be reduced, flexible resource allocation and accuracy balance are provided, processing delay is reduced, multi-target recognition efficiency of anautomatic driving automobile is improved, automobile-road cooperation processing is more timely and accurate during automatic driving of the automobile, and the safety of the automatic driving automobile and the application prospect in the traffic field are further improved.
Owner:HUALAN DESIGN GRP CO LTD +1

A kind of crape myrtle seedling cold storage and high temperature season planting method

The invention provides a lagerstroemia indica seedling cold storage and high temperature season planting method. The method comprises the steps of conducting cuttage breeding production on lagerstroemia indica seedlings in the lagerstroemia indica seedling growth period; digging out the lagerstroemia indica seedlings and binding the lagerstroemia indica seedlings according to bundles in the lagerstroemia indica seedling dormant period; after the lagerstroemia indica seedlings are subjected to sterilization, preservation, water retention and simulation temporary planting, covering the lagerstroemia indica seedlings with plastic film and then putting the lagerstroemia indica seedlings in cold storage. By means of the lagerstroemia indica seedling cold storage and high temperature season planting method, by conducting cuttage breeding production on the lagerstroemia indica seedlings in the growth period, covering the lagerstroemia indica seedlings with the plastic film and putting the lagerstroemia indica seedlings in cold storage after conducting the sterilization, the preservation, the water retention and simulation temporary planting on the lagerstroemia indica seedlings in the dormant period, the lagerstroemia indica seedlings can be transplanted in the high temperature season, soil ball transplanting is not needed, the transplanting survival rate is increased, the transplanting cost is lowered, cross-region pollution of diseases and insects can be prevented, soil resources are protected, so that when lagerstroemia indica is transplanted, requirements on time, climate andtransportation conditions are flexible, and the transplanting cost is saved.
Owner:黄财权

A multi-service isolation method for electric power wireless private network system

ActiveCN109618413BRealize full isolationMeet the needs of air interface isolationTransmission monitoringWireless communicationResource poolFrequency spectrum
The invention relates to a method for isolating multiple services in a power wireless private network system, which includes: frequency resource scanning and interference statistics, configuration control and data channel resource pools, broadcast service lists and channel resources, obtaining random access resource pools, establishing connections and Report service ID and base station configuration control and data channel resources. The present invention uses spectrum sensing technology to obtain the frequency usage and interference in the 230MHz spectrum range, thereby effectively evaluating the interference level of each frequency sub-band, and when it is found that the frequency point has been used and the interference is large, it needs to be avoided in time, and dynamically select no interference or For sub-bands with less interference, update frequency resources that can be allocated, allocate dedicated resources for high-priority services, configure multiple transmission resource pools that are physically isolated from each other, for different types of services, and support the flexibility of multiple transmission resource pools Configuration to adapt to regional spectrum resource differences and terminal distribution differences to improve resource usage efficiency.
Owner:SHANGHAI INST OF MICROSYSTEM & INFORMATION TECH CHINESE ACAD OF SCI

A wireless resource scheduling method

The application discloses a wireless resource scheduling method. The method is characterized in that the method comprises: a wireless access network is divided into three layers including a physical facility layer, a multi-level control layer, and a center management layer. The physical facility layer includes wireless access points (AP). The multi-level control layer contains at least two levels of control modules; each control module manages a corresponding AP management set; each control module in an activation mode carries out physical resource and wireless resource scheduling on users in a user centralization unit according to a corresponding strategy; and according to the set levels, the control module with the higher level distributes the resources to the control module with the lower level when a set condition is met. The center management layer is formed by a global management entity that is used for deciding state operations and distribution operations of all control modules in the multi-level control layer. On the basis of the technical scheme disclosed by the application, problems of data transmission delay and transmission bottleneck and the like in the large-scale collaborative network can be solved, thereby enhancing the collaborative performance of the network and realizing flexible resource division and management.
Owner:BEIJING UNIV OF POSTS & TELECOMM

Ultra-short-term operation scheduling method and device for electric power system

PendingCN112232693AEnsure that the water level does not exceed the limitReduce the phenomenon of discarded waterForecastingResourcesOperation schedulingElectric power system
The invention discloses an ultra-short-term operation scheduling method of an electric power system. The method comprises the steps of constructing a first hydropower optimization scheduling constraint condition; determining the type and the quantity of flexible resources which are put into ultra-short-term operation simulation; performing ultra-short-term operation simulation containing the firsthydropower optimization scheduling constraint condition on the electric power system according to an original starting mode of a conventional unit of the electric power system and the type and the number of the flexible resources so as to calculate a scheduling result of the electric power system; judging whether the climbing capacity vacancy and the peak shaving capacity vacancy of the power system are 0 or not according to the dispatching result of the electric power system; if yes, outputting the starting mode of the electric power system; and if not, outputting the climbing and peak shaving capacity vacancies of the electric power system. The invention further discloses a corresponding scheduling device. By implementing the method, the water and electricity dispatching operation requirements of the power system can be effectively considered, so that the flexibility of the electric power system is effectively improved on the basis of maintaining the optimal economy and the optimalutilization of water resources.
Owner:ELECTRIC POWER RESEARCH INSTITUTE, CHINA SOUTHERN POWER GRID CO LTD +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products