The invention discloses a construction site multi-dimensional
collaborative management method and
system driven by an
intelligent database, and relates to the technical field of
engineering project collaborative control, and the method comprises the steps: building an object, relation and evidence ledger in the
intelligent database, automatically expanding an affected range after items are put in storage, and solidifying the affected range into a unified basis; carrying out on-site disposal, classification and judgment according to quality, safety and resources around an affected range, and generating a gap
list and evidence requirements; distributing a disposal action, returning and warehousing, and updating a gap closed-loop state to form a
precondition; forming an effective judgment according to the plan, the cost and the change, and presetting a re-checking requirement for the judgment of the field condition; if the judgment meets the threshold, the trace takes effect, and the ledger is synchronously updated. According to the method, the affected range is automatically expanded and solidified through the
database, and multi-dimensional decision marks are supported to take effect through a gap
closed loop and evidence gating and can be played back for reconciliation, so that the coincident range of construction site
collaborative management, the checkable decision, the traceable process and the quick reconciliation of disputes are realized.