Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

77results about How to "Avoid falling objects" patented technology

Externally-mounted work platform for fabricated building and method for operating externally-mounted work platform for fabricated building

The invention provides an externally-mounted work platform for a fabricated building. The externally-mounted work platform for the fabricated building comprises one or two or more work platform units which are horizontally arranged on the outer side of a prefabricated side fascia, multiple fastening devices which are pre-buried in the prefabricated side fascia, and multiple hook bases which are fixedly connected with the corresponding fastening devices through fastening pieces, wherein each work platform unit comprises a one-layer or two-layer or three-layer or multi-layer framework which is formed by hollow profiles through welding, protective screen or guardrails arranged on the outer sides of all layers of the framework and protective screens or pedals which are arranged on the bottoms of all layers of the framework, and the work platform units are hooked into the hook bases through the hollow profiles transversely arranged on the inner side of the framework to be fixedly arranged on the outer side of the prefabricated side fascia. According to the externally-mounted work platform for the fabricated building, safe and reliable work space is provided for workers for outer wall construction, construction is facilitated, the construction efficiency is improved, construction cost is reduced, objects falling from high altitudes and casualties are prevented, the structure is simple, the weight is low, and multiple functions are achieved. The invention further provides a method for operating the externally-mounted work platform.
Owner:HUNAN YUANDA CONSTR ENG CO LTD

Fireproof paint, preparation method of fireproof paint and flame screen containing fireproof paint

The invention discloses a fireproof paint, a flame screen containing the fireproof paint and a preparation method of the fireproof paint. The fireproof paint is prepared from the following raw materials in parts by weight: 30 to 40 parts of dehydration catalyst, 15 to 25 parts of carbonization agent, 30 to 35 parts of foaming agent and 60 to 70 parts of binding agent. According to the flame screen, a porous metal plate or a metal wire mesh structure is utilized as a base layer, the areal density is 1 to 6.0kg / m<2>, the diameter of each mesh is 6.0 to 150.0mm, and the surface of the base layer of the flame screen is coated by the fireproof paint. In a normal use state of the flame screen, air can freely circulate among meshes of the flame screen; when fire happens, a fireproof coating on the flame screen is heated to expand to form thermal-insulation fireproof paint to plug the meshes of the flame screen, heat and smoke are prevented from freely circulating in a breathing cavity of a curtain wall, and the fire is prevented from expanding horizontally or vertically. The flame screen can be widely applied to the places needing fire protection and requiring ventilation of electric power, metallurgy, petrifaction, chemical engineering, buildings and the like.
Owner:应急管理部四川消防研究所

Portable electric power and power grid overhead line construction and maintenance protection device

The invention discloses a portable electric power and power grid overhead line construction and maintenance protection device. The portable electric power and power grid overhead line construction and maintenance protection device comprises a conductor grip upper frame (1), a first conductor grip lower frame (2), a second conductor grip lower frame (3), a first connecting rope (4), a connecting device (5), a third connecting rope (6), a belt device (7), a fourth connecting rope (8) and a protection plate device (9). The portable electric power and power grid overhead line construction and maintenance protection device is good in protection effect, a protection device at the lower end can be folded, the device is convenient for electric power maintenance workers to carry about during line maintenance, and the maintenance workers conveniently climb pylons up and down, so that the operation difficulty is reduced, and the overall work efficiency is improved; the operation is more convenient; the stability and adaptability are high, and different construction environments can be met; the operation process is simple, meanwhile the overall protection range is wide, and the safety factor is high; and the device can be stably fixed on a line, and also has a good wind prevention effect.
Owner:WENCHENG POWER SUPPLY CO OF STATE GRID ZHEJIANG ELECTRIC POWER CO +3

Mounting and demounting method of demountable and mountable overall hoisting protective frames

The invention discloses a construction method of demountable and mountable overall hoisting protective frames. The construction method comprises the following steps that a plurality of protective frame units are prepared, and each protective frame unit comprises a prefabricated wallboard and the corresponding protective frame connected with the prefabricated wallboard; the protective frame units on the first layer are hoisted, and the protective frames at the first layer are reinforced; the second step is repeated, the prefabricated wallboards on the second layer and the third layer are hoisted sequentially and fixed to the edges of a prefabricated floor slab on the second layer and the edges of a prefabricated floor slab on the third layer correspondingly; the protective frames are demounted; the protective frames conveyed to the ground are connected with the prefabricated wallboards according to the method in the first step, then the second step is repeated to hoist the prefabricatedwallboards of the mounted protective frame units to the edges of a prefabricated floor slab on the fourth layer, and the prefabricated wallboards and the prefabricated floor slab on the fourth layerare mounted and fixed; and when the hoisting conditions of the prefabricated wallboards on the previous layer are achieved, the protective frames located on the lowermost layer are demounted accordingto the fourth step and hoisted to the ground. By adopting the construction method of the demountable and mountable overall hoisting protective frames, the stability of joists on the outer side is improved, and operation is quite easy and fast.
Owner:天津住宅集团建设工程总承包有限公司

Special external hanging operation platform for prefabricated buildings and its operation method

The invention provides an externally-mounted work platform for a fabricated building. The externally-mounted work platform for the fabricated building comprises one or two or more work platform units which are horizontally arranged on the outer side of a prefabricated side fascia, multiple fastening devices which are pre-buried in the prefabricated side fascia, and multiple hook bases which are fixedly connected with the corresponding fastening devices through fastening pieces, wherein each work platform unit comprises a one-layer or two-layer or three-layer or multi-layer framework which is formed by hollow profiles through welding, protective screen or guardrails arranged on the outer sides of all layers of the framework and protective screens or pedals which are arranged on the bottoms of all layers of the framework, and the work platform units are hooked into the hook bases through the hollow profiles transversely arranged on the inner side of the framework to be fixedly arranged on the outer side of the prefabricated side fascia. According to the externally-mounted work platform for the fabricated building, safe and reliable work space is provided for workers for outer wall construction, construction is facilitated, the construction efficiency is improved, construction cost is reduced, objects falling from high altitudes and casualties are prevented, the structure is simple, the weight is low, and multiple functions are achieved. The invention further provides a method for operating the externally-mounted work platform.
Owner:HUNAN YUANDA CONSTR ENG CO LTD

Parallel steel wire stay cable manned maintenance trolley

The invention discloses a parallel steel wire stay cable manned maintenance trolley which comprises a manned maintenance vehicle and a lifting system connected with the manned maintenance vehicle, themanned maintenance vehicle comprises an outer protection unit and an inner platform unit; the outer protection unit and the inner platform unit can only be connected in a matched mode in the axial direction of a cable body in a relative sliding mode; the outer protection unit and the inner platform unit are each provided with a fixing unit capable of tightly holding the cable body; a climbing system used for driving the outer protection unit and the inner platform unit to relatively slide in the axial direction of the cable body is arranged between the outer protection unit and the inner platform unit, and a rotating body system used for driving the outer protection unit and the inner platform unit to rotate in the circumferential direction of the cable body is arranged between the outerprotection unit or the inner platform unit and the fixing unit. According to the parallel steel wire stay cable manned maintenance trolley, the parallel steel wire stay cable manned maintenance trolley can climb along the lifted direction through main traction, and can lift and rotate along the cable body through a self power system, so that the parallel steel wire stay cable manned maintenance trolley can pass through a narrow space between the adjacent cable bodies.
Owner:CCCC SECOND HARBOR ENG +1

Ultrahigh floor wall pouring method

The invention belongs to the technical field of building construction processes, and particularly relates to an ultrahigh floor wall pouring method. The method comprises the steps that a plurality of aluminum alloy formworks are spliced and fixed into a wall formwork according to a preset size; then surveying and setting out are carried out, and reserved pre-embedding is carried out; wall column steel bars are bound; a wall formwork root construction joint is arranged, and the wall formwork formed by splicing and fixing is installed on the wall formwork root construction joint; a beam formwork is installed; beam plate steel bars are bound; a floor formwork is installed and leveled; overall correction, reinforcement inspection and wall formwork bottom ash filling are carried out; and finally, concrete pouring is carried out. The spliced and fixed spliced formwork is transferred to a high-rise construction position through a crane to be directly used, and transportation and transfer are facilitated; the formworks, back edges and the like do not need to be placed separately, and the occupied space is small; and stacked bulk materials do not need to be spliced again on a high rise, objects are prevented from falling from high altitudes, the spliced and fixed spliced formwork is directly used, repeated formwork splicing of workers is reduced, the construction difficulty is reduced, and the machining efficiency is improved.
Owner:深圳市建工集团股份有限公司

Reserved hole forming composite pattern plate of shear wall used for outrigger, shear wall, reserved hole plugging block and method thereof

The invention relates to a reserved hole forming composite pattern plate of a shear wall used for an outrigger, a shear wall, a reserved hole plugging block and a method thereof. An existing reservedhole plugging technology for the shear wall used for the outrigger easily results in falling of an object from high altitude. The reserved hole forming composite pattern plate of the shear wall used for the outrigger comprises an inner pattern plate, an outer pattern plate, two vertical side plates, a top plate and a supporting plate, opposite square gaps are formed in the inner pattern plate andthe outer pattern plate, horizontal width of the square gap of the inner pattern plate is larger than that of the square gap of the outer pattern plate, each vertical side plate is composed of a frontplate, an intermediate plate and a rear plate, each front plate and the corresponding rear plate are parallel to each other, the outer side of each middle plate is vertically intersected with the front edge of the corresponding rear plate, the inner side of each middle plate is vertically intersected with the rear edge of the front plate, and projection of the top plate on the horizontal plane isshaped like a Chinese character 'TU'. The invention also relates to a corresponding shear wall, a reserved hole plugging block and a method thereof. The reserved hole forming composite pattern plateprovided by the invention has the advantages of being easy to use and completely eradicating falling of the object from high altitude and is applicable to being used by cantilevered scaffolds of various buildings.
Owner:DONGHUA CONSTR COMPANY LTD OF YANKUANG GRP

Variable bent joint

The invention relates to a variable bent joint, and belongs to the technical field of an auxiliary fishing tool for a petroleum and natural gas well. The variable bent joint comprises an outer tube, a directional joint, a piston, an upper joint and a lower joint, wherein one end of the outer tube is provided with the upper joint through screw threads; the piston is arranged in the outer tube positioned at one side of the upper joint through a piston ring; the other end of the outer tube is provided with an upper ball seat through screw threads; and a cam is arranged in the outer tube positioned between the upper ball seat and the piston through a cam seat and a cam pin. In the use process of the variable bent joint, the bent corner action can be done, so that the problems that the existing tool can only be used for fishing fallen objects in a straight well or in the axial line direction of a well body and has a small use range and the problems of low repeated use rate and high cost of the existing fishing tool are solved. The variable bent joint has the advantages that the strength is high; greater pulling force, pressure and twisting force can be borne; the application range is wide; the variable bent joint can be matched with a drilling jar to be used; meanwhile, the back-off operation can be realized; and positive popularization significance is realized.
Owner:YANGTZE UNIVERSITY

Scattered object fracturing bomb device

ActiveCN103015936ANot brokenNot seriously deformedBorehole/well accessoriesBomb deviceEngineering
The invention discloses a scattered object fracturing bomb device which comprises an ignition assembly, a fracturing bomb assembly and a bomb tail, wherein the ignition assembly, the fracturing bomb assembly and the bomb tail are connected in sequence; and the fracturing bomb assembly comprises a central tube, an externally installed grain, an internally installed grain and a detonating cord, wherein the externally installed grain is arranged on the periphery of the central tube, the internally installed grain is arranged in the central tube, the detonating cord axially penetrates through and is arranged in the internally installed grain, a plurality of through holes are formed in the tube wall of the central tube, and a pressure relief opening is formed in an area of the central tube, wherein gun powder is not applied to the area. During operation, the internally installed grain is ignited first by the detonating cord; then the externally installed grain is ignited by gunpowder through the through holes; finally, the whole gunpowder rapidly burns, high-pressure gas pulse is generated in a preset position, and a plurality of cracks are formed around a well by the high-pressure gas pulse; then the wreckage of the device is lifted out of the mouth of the well through a cable, and scattered objects cannot be left in the well; and additionally, the pressure relief opening can be used for balancing the inner and outer static pressure of the central tube, so that the device is suitable for being operated in a deeper well. In addition, the pressure relief opening can be used for relieving the pressure generated in the central tube during operation, so that the central tube can be preferably enabled not to be fractured or severely deformed during explosion of the device.
Owner:NORTH SCHLUMBERGER OILFIELD TECH XIAN

Safety protection net for building construction

The invention discloses a safety protection net for building construction. The safety protection net is characterized by comprising a frame, the frame is connected through four folding bearings in a sliding mode, the outer wall of the frame is fixedly connected with four annular buckles, a detachable protection net is arranged in the frame, the four corners of the protection net are provided withfour fixing rings, each annular buckle comprises an annular support, a first guide groove is formed in one end of the annular support, a guide column is arranged in the first guide groove, and a spring is wound around the periphery of the guide column, the outer wall of each annular buckle is connected with a bearing in a welded mode. The protection net provided by the invention has the beneficialeffects that the protection net composed of a plurality of layers of protection layers is utilized, the high-altitude falling object can be effectively prevented, the simple and convenient annular buckles are utilized, and the installation process of the safety protection net can be simplified, the construction efficiency is greatly improved, the folding of the outer frame can be realized by utilizing the folding bearing, and transportation and storage are facilitated.
Owner:四川东方绿建科技有限公司

Tool type anti-falling devices and construction anti-falling operation platform

The invention provides tool type anti-falling devices and a construction anti-falling operation platform and belongs to anti-falling devices during construction. The technical problems that in the prior art, safety is low, tool performance is not achieved, and recycling is not achieved are solved. According to the adopted technical scheme, the construction anti-falling operation platform comprises an operation platform body, the tool type anti-falling devices and through-wall screws; the multiple tool type anti-falling devices are supported on a quadrangular frame of the operation platform body; and the lower portion of each tool type anti-falling device is matched with the corresponding through-wall screw, wherein one end of the through-wall screw is inserted into a hole in a wall, and the other end of the through-wall screw is inserted into the position between two fixing inserting pieces in the tool type anti-falling device. According to the structure of each tool type anti-falling device, a mobile block is sleeved with a mobile block; the portions, close to the two ends, of the mobile box are provided with bolt through holes; the upper end of a guide plate located in a through hole in a base plate of the mobile box is connected with the mobile block, and the lower end of the guide plate located in the through hole in the base plate of the mobile box is connected with a rotary shaft box; and one end of a connecting rod is hinged to a first rotary shaft in the rotary shaft box, and the other end of the connecting rod is hinged to a second rotary shaft. The tool type anti-falling devices and the construction anti-falling operation platform are used for construction anti-falling.
Owner:SHANXI INSTALLATION GRP CO LTD

Building outer wall aging repairing device and repairing method

The invention belongs to the technical field of building outer wall repairing, and particularly relates to a building outer wall aging repairing device and repairing method. The building outer wall aging repairing device comprises a machine box, a display mechanism and a hoisting mechanism, wherein the display mechanism and the hoisting mechanism are arranged on the two sides of the top end of themachine box correspondingly; the display mechanism comprises a supporting rod, a rotating shaft and a display screen; the supporting rod is located at the top end of the machine box and is in screw joint and fixed to the machine box; the display screen is located at the top end of the supporting rod; a bearing mechanism is additionally arranged at the bottom end of a spraying device; the bearingmechanism drives a bearing box to move left and right through a moving air cylinder to be attached to the wall face and used for bearing broken wall skin scraped off during wall face spraying repairing and spraying scattered spraying materials, the situation of object falling from high altitudes is avoided, and the stability and safety of high-rise building outer wall face repairing are enhanced;and a servo motor used for driving a stirring shaft to rotate is arranged, materials in a coating containing cavity can be stirred and mixed, the situation that coating is solidified due to long-timestanding is avoided, and the uniformity of the spraying materials is enhanced.
Owner:嘉兴博睿创业服务有限公司

Multifunctional composite scaffold system

The invention discloses a multifunctional composite scaffold system, and belongs to the technical field of building construction. The multifunctional composite scaffold system comprises a plurality of anti-cantilever frames and a climbing frame which are fixed to a plurality of floors, wherein the climbing frame is fixedly installed on the floor located at the uppermost end, the plurality of anti-cantilever frames are installed on the other floors in a one-to-one correspondence mode, two guide rail sliding grooves are symmetrically formed in the outer end of each anti-cantilever frame, and the guide rail sliding grooves in the multiple anti-cantilever frames are aligned in the vertical direction. By arranging the anti-cantilever frames and climbing guide rails, the climbing guide rails can move along the anti-cantilever frames under traction of a climbing winch and climb layer by layer along with engineering structure construction, a construction scaffold can move up and down between the climbing guide rails under cooperation of a moving sliding base and the climbing guide rails, thus the construction scaffold can move up and down in a construction area, the requirements for the scaffold in building construction are met, the construction scaffold can further serve as a transportation tool during construction to transfer materials between construction layers, and construction is facilitated.
Owner:安徽长青建筑制品有限公司

Burglary-resisting window with steel yarn protective meshes

The invention relates to a burglary-resisting window with steel yarn protective meshes, and belongs to the technical field of comprehensive reconstruction of old residential buildings. The invention is mainly to solve the safety problem that children climb a window of existing burglary-resisting windows, the prevention of burglary problem, the environment problems which affect the entire buildingthat fire disaster cannot be saved and the external wall is not beautiful. The invention provides a construction and application of the burglary-resisting window with the steel yarn protective meshes,and the burglary-resisting window with the steel yarn protective meshes is blended into the entire building. The burglary-resisting window with the steel yarn protective meshes comprises an outer frame of the burglary-resisting window with the steel yarn protective meshes, steel yarn protective meshes, steel pressing strips and the like. The burglary-resisting window with the steel yarn protective meshes has the most remarkable advantages that the newly added burglary-resisting window with the steel yarn protective meshes is simple in assembling, can replace traditional burglary-resisting windows of the old residential buildings and enable the building fa ade cleaner and more uniform, and the method is safe and reliable.
Owner:BEIJING ZHUFU ARCHITECTURE AFFAIRS CO LTD

Lifting platform for glass curtain wall maintenance

The invention discloses a lifting platform for glass curtain wall maintenance. The lifting platform comprises a box body and hanging rings. The four hanging rings are fixedly connected to the four corners of the inner wall of the top of the box body. A second sliding hole is formed in the middle position of the bottom of the box body, and a case body is in bolted connection to the middle positionof the outer wall of the bottom of the box body. A first sliding hole is formed in the middle position of the top of the case body and is matched with the second sliding hole. An electric sliding railis fixedly connected to the inner wall of the bottom of the case body. According to the lifting platform, in the use process, when workers need to stand at one end of the box body for a long time, the workers can tread a pedal switch at the end, the electric sliding rail is controlled to slide a balancing weight to the end opposite to the end where the users stand, the gravity of the box body isadjusted, the box body is not prone to deviating in air, and safety of construction personnel is guaranteed; and after adjusting of the balancing weight is completed, a threaded sleeve is rotated through a rotating handle, a pressing disc presses the inner wall of the box body downwards, and the balancing weight is located.
Owner:烟台腾达制动器制造有限公司

Protective device with anti-theft function

The invention provides a protective device with an anti-thief function, and relates to the technical field of alarm devices, the protective device comprises a base, a sponge windowsill is hinged to the front end of the base, the middle upper end of the sponge windowsill is of a sponge structure, the lower end of the sponge windowsill is of a solid structure, and guide columns are fixedly connected to the left side face and the right side face of the sponge windowsill; the sponge windowsill is slidably connected to the inner side of the base through the guide columns, and side plates are further fixedly connected to the left side face and the right side face of the base. The problems that when an existing alarm device carries out warning, sound and light are mostly adopted for reminding indoor personnel, mutual reminding of surrounding neighbors is lacked, and thieves cannot be effectively prevented from entering a room are solved, a support is synchronously unfolded through a steel cable installed on one side of a hook B, so that the safety of the thieves is improved, and the safety of the thieves is improved. After the support is separated from the pressing block arranged on one side of the stand column, thieves can be repelled through continuous flickering of the flashing lamp arranged on one side of the support and continuous buzzing alarming of the buzzing baffle arranged on the outer side of the support.
Owner:山东国正工作犬技术有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products