According to the drainage construction structure at the joint of the eave gutter and the
parapet wall, the eave gutter is located on the outer side of the
parapet wall, and the bottom wall of the eave gutter comprises a light aggregate concrete sloping layer, a
cement mortar leveling layer, hydrophobic expanded bead
thermal insulation mortar and
cement-based waterproof paint which are sequentially arranged from bottom to top; gutter inlets are formed in the internal corner part between the
parapet wall and the inner side roof structure and the inner side roof structure, a drainage
pipe is arranged in the parapet wall, a water inlet of the drainage
pipe is connected with the slope bottom of the bottom wall, a water outlet of the drainage
pipe is communicated with the drainage pipe, and the drainage pipe comprises a vertical wall attaching section and a horizontal wall penetrating section. The vertical wall-attached section is connected with the wall body through the horizontal connecting
assembly, meanwhile, heat from the pipeline can be effectively blocked through the arranged heat insulation
cushion block, the waterproof and breathable
adhesive tape and the waterproof and vapor-proof film are arranged at the two ends of the horizontal wall-penetrating section correspondingly to enhance the waterproof and vapor-proof performance of the pipeline, and the waterproof and vapor-proof pipeline has the advantages of being safe, applicable and the like, has good popularization and practical value and is worthy of popularization and application. And good
economic benefits can be generated after wide popularization and application.