The invention relates to the technical field of tunnel engineering, and discloses a rapid construction smooth blasting method for a half-section micro-step. The rapid construction smooth blasting method comprises the following steps that a constructor formulates an excavation scheme according to surrounding rock conditions, and peripheral holes and auxiliary holes are formed by using an excavationdrilling trolley according to the excavation scheme. According to the rapid construction smooth blasting method for the half-section micro-step, multiple groups of slotting holes are formed, wedge-shaped slotting, multiple wedge-shaped slotting or straight hole layered slotting or spiral slotting is adopted for the slotting holes, and under the condition that the number of detonator sections is enough, part of rock mass at the slotting part should be blasted, so that slotting is easy to take out, the slotting effect can be guaranteed, the single-section dosage of slotting can be reduced, andthe vibration reduction effect can also be guaranteed; and by the adoption of the non-electric millisecond-level or semi-non-electric millimeter-level delay detonators and the detonating cords, the time difference requirement, namely the shock absorption requirement, can be met, meanwhile, operation is convenient, and stability is high.