Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

46results about How to "Solve hanging problems" patented technology

Complete system of recycling treatment of city household garbage and a method thereof

The invention relates to a complete system of recycling treatment of city household garbage and a method thereof. The invention is characterized in that an electronic screen control system controls mechanical transmission and treatment condition of a garbage mechanical classification system, a fertilizer-making system, a plastic classification system, a pulping system and a sewage treatment system by a contact screen and a circuit, the recycling treatment of day treatment for day garbage, closed operation, automatic sorting, no secondary pollution and fully treatment of resources is realized finally, the city household garbage is divided into 48 types, which are combined into 15 types and seven sorts, the classification rate reaches 100 percent, the recycling rate reaches over 99 percent and the whole-range treatment needs 60 to 80 minutes.
Owner:邵道德

Method for releasing voice group call uplink

The invention relates to a method for releasing voice multicast ascending, wherein said method presets the priority of release voice multicast ascending of distributor; in the voice multicast, and when forces to release the voice multicast ascending occupied by present user, the distributor with relative priority sends release command to MSC, MSC based on said command, release the voice multicast ascending, to set the voice multicast ascending state as free. With said invention, distributor can flexibly control the voice multicast ascending, when the user terminal occupying present ascending is accident, etc.
Owner:XFUSION DIGITAL TECH CO LTD

Method for 1/4 land territory preassembling and overwater dispersion of large cylinder main grids of cellular steel sheet piles

The invention discloses a method for 1 / 4 land territory preassembling and overwater dispersion of large cylinder main grids of cellular steel sheet piles. According to the method, for the large cylinder main grids of the cellular steel sheet piles with the diameters of 31.194m, a special crane ship is anchored on the inner side of an island wall, four 1 / 4 circular steel sheet pile assembling sheets are hoisted on the single side, a rotating mechanism is arranged on a supporting tool, the steel sheet pile assembling sheets on the outer side of the island wall respectively rotate to be in place, and thus integral-type assembling of the steel sheet piles of a grid body is completed. After the assembling of the steel sheet piles of the grid body is completed, vibration sink is carried out gradually in a layering mode by adopting a vibration hammer to the design elevation. The technology can complete the construction of causeways of grid steel sheet piles in the land territory formation process quickly with lower construction cost under the conditions of site operation that all directions are restricted.
Owner:CCCC THIRD HARBOR ENG +2

Test piece-hanging frame for testing high-pressure kettle

The invention discloses a test piece-hanging frame for testing a high-pressure kettle, which comprises an alumina ceramic column and two alumina ceramic round struts. The top of the ceramic column (6) is provided with a groove (1) to be hung on a top cover of a high-pressure kettle, the middle round strut (2) penetrates through and is fixed in a round hole (4) in the middle of the ceramic column (6), the bottom round strut (5) penetrates through and is fixed in a round hole (3) at the bottom of the ceramic column (6), the two round struts are respectively used for hanging test pieces of a corrosion test, two test pieces can be hung on either round strut for parallel test research, and the round struts are designed in positions of different heights so that the test pieces are arranged in different medium areas during the test. The invention provides the test piece-hanging frame which is convenient to test the high-pressure kettle under test conditions of 350 DEG C and approximate 19.0 MPa and must use an alumina ceramic material to resist high temperature and high pressure. The test piece-hanging frame has the advantages of convenient use, simple structure and reliable performance.
Owner:CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY

Distributed system timing method, apparatus and system

A distributed system timing method, device and system. The method includes: setting the user state timer based on the received business request; detecting whether a certain user state timer reaches the time point when receiving the timer information transmitted by the core timer which is set according to the business character; if it does, sending the timing event message; if it does not, hanging the sending of the timing event message. The embodiment of the invention realizes the high efficient timing mechanism of the distributed system, thoroughly solves the problems that due to the failure response of the remote terminal service, the customer terminal hangs over in the current distributed system.
Owner:苏师大半导体材料与设备研究院(邳州)有限公司

Folding electric iron

PendingCN107476031ASolve the lack of steamSolving the problem of water coming out of the soleplate of the ironIroning boardsHand ironEngineeringMechanical engineering
The invention discloses a folding electric iron. The electric iron comprises an iron body, an ironing plate and a support, the bottom of the ironing plate is supported by the support, a storage box is arranged on the side portion of the ironing plate, a steam stove is arranged on the support, and the iron body is communicated with the steam stove through a steam hose; a holding part of the iron body is provided with a fan switch, a temperature knob is arranged on the surface of the iron body, and a shift button is arranged on the inner side portion of the iron body; a first V-shaped groove is formed in an iron body bottom plate of the iron body, a 3D bottom plate is installed on the iron body bottom plate, a second V-shaped groove corresponding to the iron body bottom plate is formed in the 3D bottom plate, and a plurality of even holes are formed in the 3D bottom plate. According to the folding electric iron, the iron body and the ironing plate are arranged together, so that use is convenient, and the support below the ironing plate can be folded, so that space is saved after use; the 3D bottom plate is additionally arranged for the first time, double heating is conducted through the iron body bottom plate, the steam amount is increased, no water drop is formed, the problems of insufficient steam and water leakage of the iron body bottom plate do not occur, ironing of clothes is faster, and the effect is higher.
Owner:王录强

One-quarter cylinder on-site splicing method for lattice type steel sheet pile large cylinder main lattice sheet piles

ActiveCN104047276AFix stability issuesSolve the problem of lifting and loweringArtificial islandsUnderwater structuresLifting capacityWorkload
The invention discloses a one-quarter cylinder on-site splicing method for lattice type steel sheet pile large cylinder main lattice sheet piles. According to the overall method, a full circle main lattice is divided into four one-quarter circular steel sheet pile assembly pieces which are respectively lifted, and therefore the requirements for the lifting distance and the lifting capacity of a crane ship are lowered; meanwhile, the on-site workload is greatly reduced; only the four one-quarter circular steel sheet pile assembly pieces need to be hung, and then four folding piles are spliced. By the utilization of the scheme, under the on-site conditions (namely high construction region limit, shallow water, poor geological conditions and high marine environmental requirements) that all is limited and under the execution conditions including construction period requirements, a lattice type steel sheet pile large cylinder can be accurately and stably lifted and sunken.
Owner:CCCC THIRD HARBOR ENG

Rollback processing method and apparatus

The invention provides a rollback processing method and apparatus. The method is suitable for distributed transaction, and the distributed transaction relates to a transaction initiator, a transaction participant and a transaction coordinator. The method comprises the steps that a rollback request initiator receives a rollback processing request, wherein the rollback request initiator is the transaction participant or the transaction coordinator; the rollback request initiator obtains first time according to starting time of the distributed transaction and a specified time interval; and the rollback request initiator performs rollback processing when the first time is earlier than current time. According to the rollback processing method and apparatus, the problem of rollback suspension in the distributed transaction can be solved.
Owner:ADVANCED NEW TECH CO LTD

Outer wall punching device

The invention discloses an outer wall punching device, and belongs to the technical field of electromechanical equipment. The outer wall punching device particularly belongs to an outer wall drillingdevice. The outer wall punching device is composed of a fixing base, a supporting arm and a hanging body and is characterized in that the fixing base is clamped on a wall body of a windowsill, the supporting arm is assembled on the outer side of the fixing base, the hanging body is assembled on the supporting arm, and an impact drill is fixedly assembled below the hanging body; the fixing base ismade of metal profiles, a platform is arranged on the upper portion of the fixing base, fixing screw holes are reserved above the platform, a front clamping arm is arranged on the lower part of the front of the platform, and a rear clamping arm is arranged on the lower part of the rear of the platform. According to the outer wall punching device, the windowsill can be used as a support, the impactdrill is hung outside a wall for reverse drilling, and the hanging problem of a wall-mounted solar heat collection panel is solved.
Owner:BINZHOU ARMOR FORCE SOLAR TECH

Hand-cranking type anti-falling safety device

The invention discloses a hand-cranking type anti-falling safety device, including a hand-cranking control device installed on an inner wall face of a wall of one side of a transformer and a fixed device installed on an inner wall face of a wall of the other side of the transformer. The hand-cranking control device and the fixed device are oppositely arranged; the hand-cranking control device includes a roller, a control box, a deflection gear, a hand rocker, a lock control handle, a first cable and a buckle with a female spring; the first cable is wound on the roller, one end of the first cable is connected with the deflection gear, and the other end is connected with the buckle with the female spring; the fixed device includes a fixed hook and a second cable; and one end of the second cable is fixed on the fixed hook, and the other end is connected with the buckle with the female spring. The hand-operated type anti-falling safety device is installed on the inner wall faces of the walls of both sides of the transformer, and can be used for hanging a safety belt, thereby protecting safety of transformer maintenance personnel.
Owner:SHANGHAI MUNICIPAL ELECTRIC POWER CO

Method and device for releasing temporary destination node of H.248 protocol

The invention discloses a method for releasing a temporary destination node of an H.248 protocol. The method comprises the following steps: setting a protective timer for the temporary destination node; confirming whether release abnormality exists in the temporary destination node when the protective timer is overdue; releasing the temporary destination node if the release abnormality exists in the temporary destination node; and returning from the execution of setting the protective timer for the temporary destination node if the release abnormality does not exist in the temporary destination node. The invention also discloses a device for releasing the temporary destination node of the H.248 protocol, comprising a timer setting module, a first confirming module and a destination node releasing module, wherein the timer setting module sets the protective timer for the temporary destination node, the first confirming module confirms whether the release abnormality exists in the temporary destination node or not when the protective timer is overdue, and the destination node releasing module releases the temporary destination node when the release abnormality exists in the temporary destination node. The method and the device can successfully release the temporary destination node no longer used by an MG.
Owner:ZTE CORP

Fire extinguisher for security and protection

The invention discloses a fire extinguisher for security and protection. The fire extinguisher comprises a fire extinguisher barrel body, wherein a fire extinguisher pressing handle is arranged on one end of the fire extinguisher barrel body, a tray is arranged at the bottom of one side of the fire extinguisher barrel body, a fixed buckle is arranged above the tray, a nozzle is arranged in the fixed buckle, a pressure gage is arranged on one side, which is close to the nozzle, below the fire extinguisher pressing handle, a spray head is arranged on one side of the pressure gage, a fixed retaining ring is arranged on one end, which is far from one end of the pressure gage, of the nozzle, and a fixed groove is formed in one side, which is far from the nozzle, of the fire extinguisher barrel body. The detachable nozzle is designed, so that fires can be conveniently extinguished according to the sizes and distances of the fires, and the problem of property loss or casualties caused by fires because a traditional fire extinguisher cannot be preferably switched between the fires of different sizes and distances is solved; the fixed groove is designed, so that the fire extinguisher can be conveniently fixed or hung, and the problem that the traditional fire extinguisher cannot be independently fixed or hung is solved.
Owner:安徽初慕科技有限公司

Household portable medical equipment

The invention discloses household portable medical equipment which comprises a bottom plate. A suspension device is arranged on one side of the top of the bottom plate, a medical cabinet is arranged on the other side of the top of the bottom plate, a first barrier is arranged on an inner side of the medical cabinet, an oxygen tank is arranged at the bottom of a side of the first barrier, a dampingcushion is arranged at the bottom of the oxygen tank and is fixed onto the top surface of the bottom plate, an oxygen tube is arranged on a side of the oxygen tank, a side of the oxygen tube penetrates the first barrier and the top of the medical cabinet and extends to a position above the top of the medical cabinet, an oxygen mask is arranged on the top of the oxygen tube, protective sleeves arearranged on the oxygen mask, a second barrier is arranged above the oxygen tank, and a first medical drawer is arranged on the top of the second barrier. The household portable medical equipment hasthe advantages that the household portable medical equipment is reasonable in structural design and convenient to shift and use and has diversified functions, and medical living requirements of peopleat present can be effectively met by the household portable medical equipment.
Owner:王龙

Sinking type comprehensive pipe gallery

PendingCN112031022ASolve the problem that the rigidity cannot span a large distance across the support set on the structural beamSolve hanging problemsArtificial islandsRoadwaysNatural ventilationStructural engineering
The invention provides a sinking type comprehensive pipe gallery. The sinking type comprehensive pipe gallery comprises a wall body, a structural column and a structural beam which is arranged in themiddle of the structural column to divide the pipe gallery into double layers of spaces, wherein a lighting roof is arranged at the top of the structural beam and used for rain prevention and lightingof the double layers of spaces; the double layers of spaces comprise the upper layer space and the lower layer space; a ventilation pipeline and a smoke pipe are arranged in the upper layer space; anopening is formed in one side of the upper layer space to serve as a natural ventilation opening; a road and a drainage pipeline are arranged in the lower layer space; the drainage pipeline comprisesa small drainage pipeline body and a large drainage pipeline body; the large drainage pipeline body is hung on the structural beam; and the small drainage pipeline body is fixed to one side wall of the wall body. Accordingly, the problem that the small drainage pipeline body cannot stride over a support of the structural beam by a large distance due to poor rigidity is solved.
Owner:CHINA ENFI ENGINEERING CORPORATION

Highway-railway combined transport box van

The invention discloses a highway-railway combined transport box van. The highway-railway combined transport box van comprises multiple vehicle bodies and further comprises an end bogie, middle bogiesand anti-off coupling mechanisms, wherein the end bogie is mounted at the front end of the vehicle body at the most front end; the middle bogies are mounted at the rear ends of the vehicle bodies; and the anti-off coupling mechanisms are arranged between the two adjacent vehicle bodies; each vehicle body comprises an underframe, a compartment body, an air suspension and pneumatic connecting mechanisms, wherein the compartment body is mounted at the upper end of the underframe, and the pneumatic connecting mechanisms are mounted on the two sides of the rear part of the underframe; the end bogie comprises an end platform; a coupler and draft gear is arranged at the front end of the end platform; a draft sill is arranged under the rear end of the end platform; a first steering part is arranged under the draft sill; a counterweight is arranged at the lower end of the rear part of the draft sill; a sleeper beam is mounted at the upper end of the middle part of the draft sill; a brake system is arranged on the draft sill between the sleeper beam and the end platform; the middle bogies comprise second steering parts, bearing seats and integrated brake systems, wherein the bearing seats are mounted on the second steering parts; and the anti-off coupling mechanisms comprise sub couplers, main couplers and central lifting units. According to the highway-railway combined transport box van, highway and railway switching is simple, convenient and fast, and multimodal transport demands are met.
Owner:XI AN RAILWAY TRANSPORTATION EQUIP

Deeper water jacket super slender ratio drill conductor marine installation technology

ActiveCN109899008AEasy to installOvercome the length limit of turning overDrilling rodsDrilling casingsEngineeringWater jacket
The invention discloses a deeper water jacket super slender ratio drill conductor marine installation technology.The deeper water jacket super slender ratio drill conductor marine installation technology comprises the following installation steps that step 1,a second hoisting sling is mounted on the superslender ratio drill conductor; step 2,a first hoisting sling is assembled and connected on thesuper slender ratio drill conductor; step 3,a floating hoist is used for straightening the superslender ratiodrill conductor; step 4,a floating crane is used forsuspending the super slender ratiodrill conductor at a wellhead of the water jacket;step 5, the first hoisting sling hoisting mode is converted into an overall hoisting mode composed of the first hoisting sling and the second hoisting sling, and the superslender ratio mounted until free mud entering is realized; safe, stable, and reliable righting and installation of the superslender ratio drill conductor are realized, the length limit of the superslender ratio drill conductor is broken through, the section amount of the deeper water jacket drill conductoris decreased, the mud entering of a first section of the deeper water jacketdrill conductoris realized, and the suspension problem in the wellhead area is solved; and the operation is convenient, the engineering construction efficiency is improved, and the cost is lowered.
Owner:OFFSHORE OIL ENG

End bogie for highway-railway combined transport box van

PendingCN109398002ALight weightIncrease single shipment volumeRail and road vehiclesBogieEngineering
The invention discloses an end bogie for a highway-railway combined transport box van. The end bogie for the highway-railway combined transport box van comprises an end platform; a coupler and draft gear is arranged at the front end of the end platform; a draft sill is arranged under the rear end of the end platform; a first steering part is arranged under the draft sill; a counterweight is arranged at the lower end of the rear part of the draft sill; a sleeper beam is mounted at the upper end of the middle part of the draft sill; and a brake system is arranged on the draft sill between the sleeper beam and the end platform. According to the end bogie for the highway-railway combined transport box van, as the brake system is integrated on the bogie, the deadweight of a van body is effectively reduced, and highway-railway transportation of the van body is realized. The highway-railway combined transport box van using the end bogie for the highway-railway combined transport box van is integrated with advantages of two transporting modes; during long-distance transportation, the head end and the tail end adopt the flexible highway transport mode so that goods can be directly transported to destinations required by owners of goods; the long-distance transportation in the midway adopts railway transportation so that energy consumption can be reduced, and the single transporting quantity of the goods can be increased; and therefore, transportation of the goods between cities and cities is finished.
Owner:XI AN RAILWAY TRANSPORTATION EQUIP

Movable insulated baffle-type rack

ActiveCN105914653ASolve the hanging problemSimple structureApparatus for overhead lines/cablesEngineering
The invention discloses a movable insulated baffle-type rack, which comprises two supporting rods arranged horizontally. Upper end parts of the two supporting rods are connected with a horizontal supporting connection plate to form a dual-rod support; a square insulated baffle is transversely arranged on the supporting connection plate; two vertical transversely-placed suspension rods are also fixed between the two supporting rods; the upper end part of each supporting rod is provided with a beam clamping mechanism with an opening at the same side; the middle position on the supporting connection plate is provided with an inner groove-type sliding guide rail vertical to the supporting connection plate, the inner groove-type sliding guide rail is internally provided with a movable sliding block embedded in the sliding guide rail, and a rectangular insulated baffle is connected onto the sliding block; the supporting rod is formed by a hollow circular tube, the upper end part of the circular tube is connected with a square groove block with the notch facing the inner side for clamping the beam, and the supporting connection plate is fixed on the two square groove blocks; and the circular tube is internally provided with an operation core rod whose upper end extends in the notch of the square groove block and presses upwardly via an end compression spring, and the lower part of the circular tube is provided with an operation handle connected with the operation core rod and enabling the operation core rod to press and move downwardly.
Owner:STATE GRID CORP OF CHINA +1

Emergency monitoring, diagnosis and treatment device for cardiology department

The invention discloses an emergency monitoring, diagnosis and treatment device for cardiology department, which comprises an instrument storage box, a lifting device and moving devices, a workbench is arranged at the top of the instrument storage box, a display screen is arranged at the upper end of the workbench, and a control panel is arranged on one side of the display screen on the workbench; the lifting device is arranged at the bottom of the instrument storage box, a base is arranged at the lower end of the lifting device, and the moving devices are arranged on the two sides of the base. According to the invention, a box body, a reversible motor, a bidirectional bolt bar, a mounting groove, a thread bush, a first connecting block, a second connecting block, a sliding frame, a moving plate, a supporting piece and a supporting rod of the instrument storage box are arranged between the instrument storage box and the base, when the height of the instrument storage box needs to be adjusted, the reversible motor switch is turned on to drive the bidirectional bolt bar to rotate, the instrument storage box can be lifted, and workers can operate the device conveniently, simply and quickly.
Owner:许长红

Service retention method and device when attribute being switched

The method sets up two soft exchange devices for managing different network ranges as soft exchange devices with dual homes. Then, the method builds master-slave attribution relation between soft exchange devices with dual homes and media gateway. The method includes following steps: (1) when two soft exchange devices are needed to carry out exchange, slave home soft exchange device takes over all media gateway of master home soft exchange device; (2) slave home soft exchange device controls media gateway of master home soft exchange device to reset physical end points, which are in idle condition. Realizing dual homes, the method increases smoothing rearrangement of service in switching system so as to solve resources hung up.
Owner:HUAWEI TECH CO LTD

A clamp mechanism for hanging objects with closed rope chains

The invention discloses a clamp mechanism for hanging an object with a closed rope chain, relates to the technical field of object suspension and placement, and comprises a telescopic rod mechanism, a U-shaped plate fixedly connected to the end of the telescopic rod mechanism, and hinged on one side of the U-shaped plate The clamping mechanism at the end and the U-shaped bar fixedly connected to the other end of the U-shaped plate; the two ends of the U-shaped bar are fixedly connected with U-shaped clamps with an upward opening, and the hinge between the U-shaped plate and the clamping mechanism is set There is a torsion spring III, and a torsion spring II is set at the hinge of the main tong and the auxiliary tong; it also includes a brake wire, an automatic retractable brake wire mechanism connected with the main tong and auxiliary tong through the brake wire, and an automatic retractable brake wire mechanism. The sequence action mechanism that cooperates with the brake line mechanism to reset the automatic retractable brake line mechanism. The invention has the advantages of simple structure, convenient operation and convenient manufacture, simplifies the operation process of integrally suspending objects with closed rope chains, improves the working efficiency of suspending objects with closed rope chains, and greatly improves the safety of suspension operation.
Owner:YANSHAN UNIV

Method for releasing voice group call uplink

The invention relates to a method for releasing voice multicast ascending, wherein said method presets the priority of release voice multicast ascending of distributor; in the voice multicast, and when forces to release the voice multicast ascending occupied by present user, the distributor with relative priority sends release command to MSC, MSC based on said command, release the voice multicast ascending, to set the voice multicast ascending state as free. With said invention, distributor can flexibly control the voice multicast ascending, when the user terminal occupying present ascending is accident, etc.
Owner:XFUSION DIGITAL TECH CO LTD

Cable

The invention discloses a cable, comprising an outer covering layer, a core wire accommodating cavity is arranged in the middle of the outer covering layer, a core wire is arranged in the core wire accommodating cavity, more than one connecting shaft sleeve is respectively arranged on four faces of the core wire in the shape of a line, a discharge pipe is inserted into each connecting shaft sleeve, and a drain channel is arranged in the middle of the drain pipe; a locating sleeve is arrange on the outer coat layer of each connecting sleeve, the other end of the discharge pipe passes through the outer coating layer and protrudes out of the outer coating layer, the two sides of the inner side of the discharge pipe are respectively provided with a pipe interface, an input pipe is arranged between the front and rear discharge pipes, and the two ends of the input pipe are respectively inserted into the pipe interface. The invention has a simple structure, is mainly used for underground operation, solves the layout problem of drainage pipes in the mine, solves the problem of fixing of a cable, provides spraying, reduces the temperature inside the mine and reduces the temperature of equipment.
Owner:吴革洪

Stringing method for erecting all-dielectric self-supporting optical cable based on double-spliced angle steel main material iron tower

The invention provides a stringing method for erecting an all-dielectric self-supporting optical cable based on a double-spliced angle steel main material iron tower. The stringing method comprises the following steps: S1, selecting a hanging point position of the all-dielectric self-supporting optical cable; S2, selecting a special ADSS clamping plate; S3, hanging the all-dielectric self-supporting optical cable on the special ADSS clamping plate so that the problems of overload of an iron tower and field intensity distribution of an electromagnetic field are solved; S4, enabling the length of the round-head flat steel of the special ADSS clamping plate to be greater than the length of an iron tower drainage wire insulator, and solving a condition that an optical cable collides with a drainage wire wind pendulum; S5, calculating the maximum critical sag value of the strain section optical cable; S6, checking the load of the iron tower; S7, if the iron tower load strength cannot be met, the hanging point selection position of the optical cable needs to be improved on the premise that the step 01 is met, and the sag is adjusted and increased; S8, if the iron tower load is met, the sag is adjusted within the range. The hanging problem of the cross-shaped double-spliced angle steel main material iron tower can be solved through the special ADSS clamping plates.
Owner:FUJIAN YONGFU POWER ENG

Machine tool protective cover with same length as cover body

The invention discloses a machine tool protective cover with same length as a cover body. The machine tool protective cover comprises a protective cover body, guide rails, guide supporting assembliesand a scrap scraping plate assembly, wherein the guide rails, the guide supporting assemblies and the scrap scraping plate assembly are arranged below the protective cover body; a left cover body supporting plate and a right cover body supporting plate are arranged below the protective cover body; the guide support assemblies are arranged above the guide rails and consist of guide strips and guidestrip fixing bases; and the scrap scraping plate assembly comprises a scrap scraping plate cover body and a scrap scraping plate mounting plate. According to the technical scheme, the structure is simple, the cost is low, the problem that the protective cover body is suspended due to the fact that the cover body is long is solved, the supporting force of the protective cover body is increased, the machining and using cost of the machine tool is reduced, the processing efficiency and the using performance are improved, and the service life of the protective cover is prolonged.
Owner:ANQING YANGGUANG MACHINERY MFG

Distributed system timing method and system

A distributed system timing method, device and system. The method includes: setting the user state timer based on the received business request; detecting whether a certain user state timer reaches the time point when receiving the timer information transmitted by the core timer which is set according to the business character; if it does, sending the timing event message; if it does not, hanging the sending of the timing event message. The embodiment of the invention realizes the high efficient timing mechanism of the distributed system, thoroughly solves the problems that due to the failure response of the remote terminal service, the customer terminal hangs over in the current distributed system.
Owner:苏师大半导体材料与设备研究院(邳州)有限公司

A method of pre-assembled on land and scattered on water for a large cylinder main grid of lattice-type steel sheet piles 1/4

The invention discloses a method for 1 / 4 land territory preassembling and overwater dispersion of large cylinder main grids of cellular steel sheet piles. According to the method, for the large cylinder main grids of the cellular steel sheet piles with the diameters of 31.194m, a special crane ship is anchored on the inner side of an island wall, four 1 / 4 circular steel sheet pile assembling sheets are hoisted on the single side, a rotating mechanism is arranged on a supporting tool, the steel sheet pile assembling sheets on the outer side of the island wall respectively rotate to be in place, and thus integral-type assembling of the steel sheet piles of a grid body is completed. After the assembling of the steel sheet piles of the grid body is completed, vibration sink is carried out gradually in a layering mode by adopting a vibration hammer to the design elevation. The technology can complete the construction of causeways of grid steel sheet piles in the land territory formation process quickly with lower construction cost under the conditions of site operation that all directions are restricted.
Owner:CCCC THIRD HARBOR ENG +2

Double-curve cooling tower climbing ladder

The invention provides a double-curve cooling tower climbing ladder. The double-curve cooling tower climbing ladder comprises a tower barrel inner climbing ladder and a tower barrel outer climbing ladder, the tower barrel inner climbing ladder is arranged below the elevation of a throat part of a cooling tower, the tower barrel outer climbing ladder is arranged above the elevation of the throat part of the cooling tower, a half oval manhole is formed in the elevation position of the throat part of the cooling tower, the climbing ladder is composed of a plurality of Z-shaped climbing ladder bodies, and each climbing ladder body comprises a climbing ladder platform, a climbing ladder handrail, a climbing ladder pedal and a climbing ladder protecting cage. The tower barrel inner climbing ladder is adopted below the elevation of the throat part of the cooling tower, the problem of overhanging of the climbing ladder outside the tower wall is solved, the construction difficulty is reduced, as for the climbing ladder section in a tower barrel, the influence of the wind load is eliminated, and safe reliability of the climbing ladder is increased; and the tower barrel inner climbing ladderand the tower barrel outer climbing ladder can be constructed simultaneously, the construction progress is speeded up, and the construction time is saved.
Owner:HENNAN ELECTRIC POWER SURVEY & DESIGN INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products