Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

52results about How to "Solve the overload" patented technology

High-concurrency scene processing method and device based on Redis and Kafka online snap-up system

The invention provides a high-concurrency scene processing method and device based on a Redis and Kafka online snap-up system; the method comprises the following steps: generating a login token basedon a user login request, writing the login token into caches of front-end Cookie and rear-end Redis, checking whether the front-end login token is matched with the rear-end login token; if not, returning an operation failure result; if yes, judging whether the user login token is valid; if not, returning an operation failure result; if yes, judging whether a commodity lock of a corresponding commodity is obtained or not; if not, returning an operation failure result; if yes, pushing request data of snap-up success to a Kafka information queue. According to the method and the device in the invention, loading pressure of a server and a database is effectively reduced through current-limiting peak-clipping processing; a large number of concurrent requests can be borne in short time; the throughput capacity of the cluster is greatly increased; through front-rear end check on the number of user access times, a cheating user can be quickly found out, so that the event is guaranteed to be carried out stably and fairly.
Owner:成都博点科技有限公司

Performance testing system and method for MS (Media Server) clustered system

The invention provides a performance testing system and method for an MS (Media Server) clustered system. The performance testing system comprises an MS clustered system, a set top box simulating device, IPQAM (Internet Protocol Quadrature Amplitude Modulation) equipment and a playing terminal; the set top box simulating device is used for simulating a test case and analyzing relevant performances of the MS clustered system according to time information on signalling interaction between the set top box simulating device and the MS clustered system; and the playing terminal is used for receiving and playing a media stream which is selected and sent by the MS clustered system according to a request of the set top box simulating device, and obtaining performance data of the MS clustered system according to a playing result. According to the performance testing system provided by the invention, a media stream playing process and a signalling processing process can be separated, the problem of overweight load of a testing machine in the traditional testing system is solved, and the analysis and the processing to the media stream are facilitated; and the set top box simulating device in the system can be used for simulating a plurality of set top boxes, so that the number of user loads contained by the test case is greatly increased, and the testing cost is greatly saved.
Owner:UNIV OF SCI & TECH OF CHINA

Method and system for realizing load balancing and switching of uplink and downlink data of mobile node

The embodiment of the invention discloses a method and system for realizing load balancing and switching of uplink and downlink data of a mobile node (MN). The method includes the following steps that: a bidirectional tunnel is established between each local mobility anchor (LMA) and mobile access gateways (MAG); each local mobility anchor (LMA) automatically checks a load status at preset time intervals and sends the load status of the local mobility anchor (LMA) itself to a route management entity (RMS); the route management entity (RMS) receives the load status of each local mobility anchor (LMA) and stores the load status to a load list maintained by the route management entity (RMS) itself; the route management entity (RMS) traverses the load list maintained by the route management entity (RMS) itself, and adjusts data forwarding paths of the mobile access gateways (MAG) in real time according to the load status of each local mobility anchor (LMA); when the mobile node (MN) is switched to a current mobile access gateway (MAG), the current mobile access gateway (MAG) completes standard proxy binding update (PBU)/proxy binding acknowledgement (PBA) switch, and then, forwards routing update signaling to each local mobility anchor (LMA) through the route management entity (RMS); and each local mobility anchor (LMA) adjusts corresponding routing items respectively and forwards obtained data of the mobile node (MN) to the current mobile access gateway (MAG) through a tunnel portal. The embodiment of the invention also discloses a system for realizing load balancing and switching of uplink and downlink data of a mobile node (MN).
Owner:LIAONING MOBILE COMM

SRAM unit

The invention discloses an SRAM (Static Random Access Memory) unit. A first transmission transistor comprises a first source and a first gate; a first pull-down transistor comprises a second source; a second transmission transistor comprises a third source and a second gate; a second pull-down transistor comprises a fourth source electrode; a first pull-up transistor comprises a fifth source; a second pull-up transistor comprises a sixth source; in first and second interconnection line layers, one interconnection line layer comprises a word line and a power supply connection line, the other interconnection line layer comprises first and second bit lines and a grounding line, or one interconnection line layer comprises the word line and the grounding line, and the other interconnection line layer comprises the first and second bit lines and the power supply connection line; the word line is electrically connected with the first and second gates; the first bit line is electrically connected with the first source; the second bit line is electrically connected with the third source; the power supply connection line is electrically connected with the fifth and sixth sources; and the grounding line is electrically connected with the second and fourth sources. According to the scheme, the number of peripheral control circuits arranged on the first interconnection line layer is the same as the number of peripheral control circuits arranged on the second interconnection line layer; and supported lead tasks are basically balanced.
Owner:SEMICON MFG INT (SHANGHAI) CORP

Network remote control system and implementation method thereof

The invention discloses a network remote control system comprising a remote control base terminal and a control terminal, wherein the control terminal controls the remote control base terminal throughwireless transmission. The invention further provides an implementation method of the network remote control system for quickly and flexibly performing remote network control through the remote control system. According to the network remote control system disclosed by the invention, a user can control a mobile phone and other smart devices to move ( perform displacement or action) through a network by additionally mounting a base for the mobile phone and other smart devices. By additionally mounting the device for the mobile phone and other smart devices, the mobile phone and other smart devices can have brand new functions such as remote visit, remote display and remote commentary. Compared with the remote control devices currently on the market, the device disclosed by the invention has the advantages of low cost, high adaptability, convenient application, diverse functions or the like. Furthermore, by means of the remote visit/display/commentary functions, the manpower and the travel expenses of personnel can be greatly reduced, and the efficiency is higher.
Owner:WEIFANG YUANTONG CENTURY IND & TRADE
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products