Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

44results about How to "The installation method is simple and quick" patented technology

Method and device for detecting distributing line faults

The invention discloses a method and a device for detecting distribution line faults. A current transformer is sleeved on a distribution line B-phase so as to acquire a line current signal; a signal acquisition end of an electronic controller receives the line current signal from the current transformer; when a normal line current passes through the electronic controller for the first time or a line circuit is of a fault current and reaches the counting times set by the electronic controller, a control instruction output end of the electronic controller transmits corresponding control signals respectively; a GPRS (general packet radio service) communication module receives the control signals from the electronic controller; the line installing position and the information of the line state are transmitted to a cell phone terminal with an appointed receiving cell phone number through a GSM (global system for mobile) global digital mobile communication system, so as to realize the state monitoring for the distribution line by the cell phone terminal. With the adoption of the method and the device, a fault point can be found as early as possible, so as to find out the reason of the fault and further eliminate the fault; and the device and the method are high in detection precision and reliable in performance, and the detecting device is low in installation and maintenance costs under the condition that the safe and reliable operation of a power grid is ensured.
Owner:JINZHOU ELECTRIC POWER SUPPLY COMPANY OF STATE GRID LIAONING ELECTRIC POWER SUPPLY +1

Installation method for gantry structure of large-sized gantry machine tool

The invention provides an installation method for a gantry structure of a large-sized gantry machine tool. The installation method for the gantry structure of the large-sized gantry machine tool comprises the steps of installing a working table, vertical columns and an X axis guiding rail and installing a Y axis guiding rail; the step of installing the Y axis guiding rail comprises the processes of initial assembly and refined assembly; the initial assembly of the Y axis guiding rail is conducted according to the prior technology method; the refined assembly comprises the steps of enabling a sliding block of the Y axis guiding rail to move relatively to the working table to form a parallelogram-shaped trajectory, judging if the perpendicularity of the Y axis guiding rail and the X axis guiding rail reaches the requirement according to the relative error of the two diagonal lines of the parallelogram-shaped trajectory and finishing the installation if the requirement is reached; if therequirement is not reached, calculating the included angles, which are the included angles of the Y axis guiding rail and the X axis guiding rail, of adjacent two sides of the parallelogram-shaped trajectory according to the cosine law, obtaining the accurate adjustment displacement of the Y axis guiding rail by calculating according to the included angles and the length of the Y axis guiding rail, conducting the accurate adjustment of the Y axis guiding rail and finishing the installation. The installation method is simple, rapid and high-accuracy; a large amount of labor and time consumed bythe accurate adjustment and disassembly after the initial assembly in the prior art can be saved and the perpendicularity accuracy reaches up to 0.02mm.
Owner:帝尔激光科技(无锡)有限公司

Installing structure and installing method for wall body insulation board

The invention provides an installing structure and installing method for a wall body insulation board. The installing structure comprises an L-shaped adapter part, a T-shaped guide rail, a T-shaped fixing part and an insulation board body; the L-shaped adapter part comprises a horizontal face and a vertical face which are perpendicular to each other, a main body portion of the T-shaped guide railis provided with a clamping groove, and at least one of two wings is provided with a groove; the vertical face of the L-shaped adapter part is fixed to a wall body, and the horizontal face of the L-shaped adapter part is clamped by the groove of the T-shaped guide rail; the wall body is provided with a leveling layer, and the insulation board body is installed on the outer side of the leveling layer; and a main body of the T-shaped fixing part is inserted into the clamping groove of the T-shaped guide rail, and two wings of the T-shaped fixing part are clamped into grooves formed in the edgesof a face layer of the insulation board body. According to the installing structure for the wall body insulation board, an insulation board installing main body framework is formed through combined connection of all the assemblies, the assemblies and the insulation board both can be preformed, machining is not needed on the site, the installing technology of the insulation board is greatly simplified, and meanwhile the quality is guaranteed. Influences of the wall body structure on the installing method are small, and after the insulation board is installed, the flatness is high, and the system safety is high.
Owner:湖北卓宝建筑节能科技有限公司

Vehicle threshold mounting method and vehicle threshold structure

The invention discloses a vehicle threshold mounting method and a vehicle threshold structure thereof. The mounting method comprises the following steps: providing a threshold inner plate being a steel plate sheet metal part provided with an upper section, a middle section and a lower section, the middle section being formed between the upper section and the lower section, and the middle section being connected with a vehicle body floor in a spot welding mode; forming a vehicle body framework structure; providing a threshold outer plate, installing the threshold outer plate transversely alongthe vehicle, and fixedly connecting the top wall of the threshold outer plate with the upper section; and fixedly connecting the side wall, close to the threshold inner plate, of the threshold outer plate with the lower section. Compared with the prior art, by means of the mode that the threshold inner plate of the steel plate is connected with the threshold outer plate of the aluminum profile andthe spot welding framework of the threshold inner plate and the vehicle body, the precision requirement can be met without other supports or reinforcing pieces, the overall structure is simple, partsdo not need to be polished and adjusted, and the matching performance with peripheral parts is good; and the sealing problem of the seam allowance surface of the vehicle door is effectively solved.
Owner:ZHEJIANG GEELY HOLDING (GROUP) CO LTD +1

Semi-fabricated concrete guardrail and mounting method thereof

The invention discloses a semi-fabricated concrete guardrail which comprises a first side plate and a second side plate which are formed by pouring high-performance concrete, the first side plate comprises a plurality of first sub-side plates which are spliced in sequence, the second side plate comprises a plurality of second sub-side plates which are spliced in sequence, and the first sub-side plates and the second sub-side plates are arranged in parallel. The first sub-side plates and the second sub-side plates are fixedly connected through split bolts, and concrete is poured between the first sub-side plates and the second sub-side plates. According to the scheme, the first side plate and the second side plate can be prefabricated in a factory, the quality of the formwork is controlled, and the appearance quality problems of color difference, cracks, surface defects and the like existing in a traditional concrete guardrail are effectively solved; the first side plate and the second side plate can effectively prevent water loss of concrete between the first side plate and the second side plate, concrete curing is not needed, and the cost is greatly saved; meanwhile, the first side plate and the second side plate have excellent impermeability and corrosion resistance, and the service life of the guardrail is prolonged.
Owner:CCCC HIGHWAY BRIDNAT ENG RES CENT

Reinforced fireproof door window and installation method thereof

The invention discloses a reinforced fireproof door window, comprising a fixed frame, an outer frame, an electric telescopic rod and a controller; an installation method of the reinforced fireproof door window comprises the following steps: disassembling fixed plates, carrying out sealing treatment, and installing the fixed plates; according to the reinforced fireproof door window, the two groupsof symmetrical fixed plates are fixed on the fixed frame, and are buckled at the inner side and outer side of a building when the door window in installed, so that the door window can be firmly fixedon the building, and the installation stability of the door window is improved; furthermore, the outer frame is driven to be opened and closed by means of an electric push rod, and a sensing device used for detecting the external weather conditions of blowing and raining is matched for use, so that automatic closing is realized under the windy and rainy conditions, the degree of automation is improved, and the operation is more convenient; the installation method of the reinforced fireproof door window is relatively simple and convenient; furthermore, additional sealant and waterproof glue areused for carrying out sealing treatment, so that the sealing performance of the door window is improved.
Owner:安徽百祺瑞建材科技有限公司

Data mining device for big data cloud processing and using method thereof

The invention relates to the technical field of data mining devices, in particular to a data mining device for big data cloud processing and a use method of the data mining device. The data mining device comprises support legs, a shell fixedly connected to the top ends of the support legs, a controller at the front end of the shell, and a processor and a memory detachably connected to the interior of the shell through bolts, the processor and the memory are fixedly arranged on the upper side of a circuit board. According to the data mining device, the memory can be conveniently mounted and taken out through an insertion clamping mechanism, the practicability is very good, during mounting, the memory is inserted into the inner side of a connecting seat, and in the memory insertion process, the memory presses a wedge-shaped block to move outwards, the wedge-shaped block overcomes the elastic force of a fifth springs to force a connecting rod to move outwards, in the process that the connecting rod moves outwards, a clamping rod is forced to get close to the memory through a telescopic rod and clamp the memory, arranged rubber pads can play a role in increasing friction force, and therefore the memory is convenient to install.
Owner:计算云科技(江苏)有限公司

Floating cabin type submersible electric pump for water and installation method for same

The invention discloses a floating cabin type submersible electric pump for water, which comprises a pump body and a floating cabin, wherein the floating cabin comprises a floating cabin upper cover, a floating cabin lower cover, an outer cabin wall and a water outlet pipe. The outer cabin wall is positioned on the outside of the water outlet pipe, the floating cabin upper cover is positioned above the outer cabin wall, the floating cabin lower cover is positioned below the outer cabin wall, first through holes are arranged on the periphery of the floating cabin upper cover, an upper flange plate is arranged at the top end of the water outlet pipe, a lower flange plate is arranged at the bottom end of the water outlet pipe, and the pump body is vertically placed and positioned in the water outlet pipe. The submersible electric pump can normally work in various types of water. Besides, the invention further provides an installation method for the floating cabin type submersible electric pump. The installation method includes the steps: firstly, installing steel cables; secondly, laying down the submersible electric pump to slip into the water along a bank slope; thirdly, respectively fixing the first steel cable and the second steel cable on the bank slope; and finally, fixing the third steel cable. The installation method is simple and rapid, and can be used for stably installing the submersible electric pump in the water.
Owner:LANSHEN GRP CORP LTD

Method and device for detecting distributing line faults

The invention discloses a method and a device for detecting distribution line faults. A current transformer is sleeved on a distribution line B-phase so as to acquire a line current signal; a signal acquisition end of an electronic controller receives the line current signal from the current transformer; when a normal line current passes through the electronic controller for the first time or a line circuit is of a fault current and reaches the counting times set by the electronic controller, a control instruction output end of the electronic controller transmits corresponding control signals respectively; a GPRS (general packet radio service) communication module receives the control signals from the electronic controller; the line installing position and the information of the line state are transmitted to a cell phone terminal with an appointed receiving cell phone number through a GSM (global system for mobile) global digital mobile communication system, so as to realize the state monitoring for the distribution line by the cell phone terminal. With the adoption of the method and the device, a fault point can be found as early as possible, so as to find out the reason of the fault and further eliminate the fault; and the device and the method are high in detection precision and reliable in performance, and the detecting device is low in installation and maintenance costs under the condition that the safe and reliable operation of a power grid is ensured.
Owner:JINZHOU ELECTRIC POWER SUPPLY COMPANY OF STATE GRID LIAONING ELECTRIC POWER SUPPLY +1

Installation method for aluminum door window frame with non-leakage rainwater collecting groove

The invention discloses an installation method for an aluminum door window frame with a non-leakage rainwater collecting groove. The installation method comprises the following steps that (1) clamping heads are prepared on the two sides of the lower portion of a lower frame of the window frame; (2) the rainwater collecting groove is prepared, clamping grooves are formed in the two sides of the upper portion of the rainwater collecting groove, and a pair of downwards-extending side edges are arranged on the lower portion of the rainwater collecting groove; (3) the two sides of the lower frame are each provided with a rainwater baffle with a tongue bar, the tongue bars are inserted into the rainwater collecting groove, and then sealants are injected between the bottoms of the tongue bars and the rainwater collecting groove; (4) a steel auxiliary frame is arranged in the position between the two side edges in a sleeved mode, the side edges and the two sides of the steel auxiliary frame are tightly screwed and fixed together in a corresponding mode through bolts; (5) the steel auxiliary frame is placed on a windowsill, and then concrete is poured and covers the bolts; and (6) after the concrete is solidified, the rainwater collecting groove and the steel auxiliary frame are fixed to the windowsill, and the clamping heads on the lower frame of the window frame are aligned with the clamping grooves in the upper portion of the rainwater collecting groove for clamping to complete aluminum door window installation. After the technical scheme is adopted, through the installation method, the rainwater collecting groove is additionally formed in the lower portion of the lower frame of the window frame, through the rainwater collecting groove, the situation that rainwater permeates into the steel auxiliary frame is avoided, and the installation method is simple and rapid.
Owner:广东皇派定制家居集团股份有限公司

Magnetic buckle plate for interior decoration

The invention relates to an interior decoration material, in particular to a magnetic buckle plate for interior decoration. The magnetic buckle plate for interior decoration comprises a plastic motherboard, a plastic male plate and a permanent magnet; buckling holes and nail-shooting mark shallow holes are evenly and regularly distributed in the front face of the plastic mother board; buckling columns corresponding to the buckling holes are arranged on the back face of the plastic male plate; blind holes corresponding to the buckling holes in position are formed in the back face of the plastic female plate and the front face of the plastic male plate; permanent magnets are embedded in the blind holes; and decorative patterns are painted on the front face of the plastic male plate in a spraying mode or decorative materials are mounted on the front face of the plastic male plate in a pasting mode. During installation, the plastic female plate is nailed on a wall surface or a ceiling byusing a nail gun, and then the plastic male plate is buckled on the plastic female plate. The magnetic buckle plate for indoor decoration is low in cost, easy and convenient to install and free of toxicity and pollution in the installation process, and the most prominent advantage is that the plastic male plate serving as a decoration face can be replaced at will, so that the decoration effect canbe changed.
Owner:韩金宇

Floating cabin type submersible electric pump for water and installation method for same

The invention discloses a floating cabin type submersible electric pump for water, which comprises a pump body and a floating cabin, wherein the floating cabin comprises a floating cabin upper cover, a floating cabin lower cover, an outer cabin wall and a water outlet pipe. The outer cabin wall is positioned on the outside of the water outlet pipe, the floating cabin upper cover is positioned above the outer cabin wall, the floating cabin lower cover is positioned below the outer cabin wall, first through holes are arranged on the periphery of the floating cabin upper cover, an upper flange plate is arranged at the top end of the water outlet pipe, a lower flange plate is arranged at the bottom end of the water outlet pipe, and the pump body is vertically placed and positioned in the water outlet pipe. The submersible electric pump can normally work in various types of water. Besides, the invention further provides an installation method for the floating cabin type submersible electric pump. The installation method includes the steps: firstly, installing steel cables; secondly, laying down the submersible electric pump to slip into the water along a bank slope; thirdly, respectively fixing the first steel cable and the second steel cable on the bank slope; and finally, fixing the third steel cable. The installation method is simple and rapid, and can be used for stably installing the submersible electric pump in the water.
Owner:LANSHEN GRP CORP LTD

Gantry structure installation method of a large gantry machine tool

The invention provides an installation method for a gantry structure of a large-sized gantry machine tool. The installation method for the gantry structure of the large-sized gantry machine tool comprises the steps of installing a working table, vertical columns and an X axis guiding rail and installing a Y axis guiding rail; the step of installing the Y axis guiding rail comprises the processes of initial assembly and refined assembly; the initial assembly of the Y axis guiding rail is conducted according to the prior technology method; the refined assembly comprises the steps of enabling a sliding block of the Y axis guiding rail to move relatively to the working table to form a parallelogram-shaped trajectory, judging if the perpendicularity of the Y axis guiding rail and the X axis guiding rail reaches the requirement according to the relative error of the two diagonal lines of the parallelogram-shaped trajectory and finishing the installation if the requirement is reached; if therequirement is not reached, calculating the included angles, which are the included angles of the Y axis guiding rail and the X axis guiding rail, of adjacent two sides of the parallelogram-shaped trajectory according to the cosine law, obtaining the accurate adjustment displacement of the Y axis guiding rail by calculating according to the included angles and the length of the Y axis guiding rail, conducting the accurate adjustment of the Y axis guiding rail and finishing the installation. The installation method is simple, rapid and high-accuracy; a large amount of labor and time consumed bythe accurate adjustment and disassembly after the initial assembly in the prior art can be saved and the perpendicularity accuracy reaches up to 0.02mm.
Owner:帝尔激光科技(无锡)有限公司

Installation structure and installation method of a wall insulation board

The invention provides an installation structure and installation method of a wall insulation board. The installation structure includes an L-shaped adapter, a T-shaped guide rail, a T-shaped fixing piece, and an insulation board. The L-shaped adapter includes mutually perpendicular The plane and elevation of the T-shaped guide rail are provided with a card slot, and at least one of the two wings is provided with a groove; the elevation of the L-shaped adapter is fixed on the wall, and the groove on the T-shaped guide rail is stuck to the L-shaped For the plane of the adapter, a leveling layer is set on the wall, and an insulation board is installed outside the leveling layer. The main body of the T-shaped fixing piece is inserted into the slot of the T-shaped guide rail, and the two wings of the T-shaped fixing piece are caught on the edge of the surface layer of the insulation board. slot. The present invention constitutes the main frame of the insulation board installation through the combined connection of each component, and each component and the insulation board can be prefabricated, and no processing is required on site, which greatly simplifies the installation process of the insulation board and ensures the quality at the same time; the installation method is limited by the wall The influence of the body structure is small, the flatness of the insulation board is high after installation, and the system safety is high.
Owner:湖北卓宝建筑节能科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products