The invention relates to a method for evaluating the coincidence rate of an actual drilling borehole trajectory and a design track, and belongs to the technical field of petroleum and gas drilling. The method comprises the steps that the actual drilling borehole trajectory and the design track are unified to a coordinate system by measuring the well mouth coordinate and altitude of the actual drilling borehole trajectory; then the well depth, well deviation and orientation of the actual drilling borehole trajectory are measured, the vertical depth, east-west coordinate and north-south coordinate of an actual drilling well are figured out and standardized to be fuzzy vectors, the close degrees between the fuzzy vectors of the vertical depth, east-west coordinate and north-south coordinate of the actual drilling well and the fuzzy vectors of the vertical depth, east-west coordinate and north-south coordinate of the corresponding design borehole track is calculated, finally, the average value of the close degrees is figured out, and the average close degree is used for evaluating the coincidence rate of the actual drilling borehole trajectory and the design borehole track. By means of the method, quantitative judgment is achieved, human active factors are overcome, and the coincidence rate of the actual drilling borehole trajectory and the design track is objectively reflected.