Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

33 results about "Bond beam" patented technology

A bond beam is a horizontal structural element, usually found as an embedded part of a masonry wall assembly. The bond beam serves to impart horizontal strength to a wall where it may not otherwise be braced by floor or roof structure. Bond beams encase steel reinforcing in grout or concrete, binding the structure together horizontally, and often interlocking with additional vertical reinforcement. A bond beam is typically found near the top of a freestanding wall. A bond beam may also be used to provide a consistent anchorage for floor or roof structure. Bond beam assemblies are most commonly used in construction using concrete masonry units, where special shapes allow the beam to blend with the wall construction, but may also be built using brick or may be formed in concrete.

Novel steel plate beam and steel-concrete bond beam

The invention discloses a novel steel plate beam and a steel-concrete bond beam. The novel steel plate beam comprises a first splicing part and a second splicing part. The first splicing part comprises a frange plate I and a web plate II which are integrally rolled and formed; the second splicing part comprises a frange plate II and a web plate II which are integrally rolled and formed, and the web plate I and the web plate II are connected by means of a butt weld. The steel-concrete bond beam comprises any one novel steel plate beam and a concrete plate covering the novel steel plate beam. Aconnecting part is connected between the novel steel plate beam and the concrete plate. The novel steel plate beam is formed by splicing the first splicing part and the second splicing part, so that the height of the steel plate beam can be improved greatly. The first splicing part and the second splicing part are rolled and formed, and the web plates and the frange plates are connected tightly, so that no fillet welds are available and the force transfer property is excellent. Furthermore, the first splicing part and the second splicing part are connected through the butt weld, so that the novel steel plate beam is convenient to process and manufacture, and the welding quality of the butt weld is easily guaranteed.
Owner:CHINA RAILWAY ERYUAN ENG GRP CO LTD

Urban rail transit bond beam and construction method thereof

The invention discloses an urban rail transit bond beam and a construction method thereof and belongs to the technical field of urban rail transit. The urban rail transit bond beam comprises two concrete edge longitudinal beams, two concrete cross beams, a steel longitudinal beam, a plurality of steel cross beams, and a concrete bridge deck slab; the two concrete cross beams are arranged at the two ends of the two concrete edge longitudinal beams respectively, and the two ends of the steel longitudinal beam are connected with the two concrete cross beams respectively; each steel cross beam comprises a first cross beam and a second cross beam, the two sides of the first transverse beam and the two sides of the second transverse beam are respectively connected with the steel longitudinal beam and the concrete edge longitudinal beams, and the first transverse beam, the second transverse beam and the steel longitudinal beam form a supporting surface; and the concrete bridge deck slab is arranged on the supporting surface formed by the first transverse beam, the second transverse beam and the steel longitudinal beam. According to the urban rail transit bond beam provided by the invention, the transverse stress of the beam body is improved, the weight of the beam body component is reduced, and the installation efficiency is improved.
Owner:CHINA MAJOR BRIDGE ENERGINEERING

A structure and construction method of a combined girder bridge with external support girder type maintenance road

The invention discloses an externally supported girder type inspection road structure and a construction method of a combined girder bridge, and relates to the technical field of bridge construction. It includes: support beams, the support beams are fixedly connected on both sides of the combined beam bridge, there are multiple support beams, and the multiple support beams are arranged at intervals along the longitudinal direction of the combined beam bridge; the first longitudinal beam and the second longitudinal beam, the first The first longitudinal beam and the second longitudinal beam are fixedly arranged above the support beam at intervals, the first longitudinal beam is located on the side close to the combined beam bridge, and the second longitudinal beam is located on the side away from the combined beam bridge; Laying on the top of the first longitudinal girder and the second longitudinal girder, there are multiple access slabs, and the multiple access slabs extend along the longitudinal bridge direction of the combined girder bridge. The supporting beams, the first longitudinal beam and the second longitudinal beam of the external support beam type inspection road of the present invention are all made of steel structure materials, and the inspection road board adopts prefabricated slabs made of concrete materials, which can significantly reduce the structure The self-weight is lower, the cost of materials is reduced, and the construction is convenient.
Owner:CHINA MAJOR BRIDGE ENERGINEERING

Large-span step-by-step cantilevered diagonal bracing structure and its construction method based on pull-up and bottom-embedded structures

ActiveCN110107075BGuaranteed styling needsTo achieve the purpose of beautiful imageScaffold accessoriesPre stressArchitectural engineering
The invention discloses a large-span step-by-step cantilevered diagonal bracing structure based on an upper pull-down and lower embedded structure and a construction method thereof. , tie beams (4) and prestressed tendons (5); the bottom of the load steel frame column is fixed in the negative layer (100), and the top of the load steel frame column is fixed on the roof layer (200); On the load steel frame column (1) of the first floor (300), the eccentric angle of the diagonal brace and the load steel frame column is formed between the diagonal brace and the load steel frame column; the steel frame beams are connected by tie beams and set on the load steel frame columns to form the structure of the building. For several levels, the diagonal braces extend upwards to the top floor and are fixed with the steel beams of each level through tie beams to form a step-by-step cantilever structure; the prestressed tendons are anchored on the fixed structural columns (201), and the prestressed tendons are set Steel beams and anchored. The invention can meet the architectural requirements of the oblique shape of the large-span cantilevered step by step in the building structure through the construction technology of pulling up and inserting diagonal braces.
Owner:SICHUAN TAILONG CONSTR GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products