Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

34results about How to "Enough deformation space" patented technology

Fabricated steel structure beam-column connection joint and connection method thereof

ActiveCN107675801AAvoid brittle fracture problemsEnough deformation spaceBuilding constructionsMetallurgySteel columns
The invention discloses a fabricated steel structure beam-column connection joint and a connection method thereof. The fabricated steel structure beam-column connection joint is used for solving the problem that an existing joint is poor in anti-seismic performance and for connection of a steel beam and a steel column. The end of the steel beam is a connection part, and a set of plate-shaped spring assemblies is arranged in each of mounting grooves on the two sides of the steel beam. A concrete block formed by grouting is arranged in a grouting space between a grouting trough and the inner wall of a rectangular steel pipe. A transition connection part is composed of a steel plate and the rectangular steep pipe, wherein the steel plate is fixed to the steel beam through a high-strength bolt, a plug-in part is formed in the rectangular steel pipe, and the connection part is inserted into the plug-in part to form partial overlapping. Anchor pulling holes are formed in the plate-shaped spring assemblies, a separation plate and the steel column, after a steel cable penetrates through the anchor pulling holes, the two ends of the steel cable are fixed to the steel column and the steel beam correspondingly. Under a non-seismic state, the joint is rigid connection, under a seismic state, movable flexible connection is formed, and thus the problem of fragile fracturing brought by the rigid joint can be avoided.
Owner:江苏承天新型建材有限公司

Variable-stiffness elastic energy storage device and method thereby for testing rock instability

The invention belongs to the technical field of rock engineering, and particularly relates to a variable-stiffness elastic energy storage device and a method thereby for testing rock instability. Theinvention has the following technical scheme that the variable-stiffness elastic energy storage device comprises a pressure head, a guide rod, a base, a gasket and a disc spring, wherein the guide rodis vertically installed on the center of the base; the gasket and the disc spring are independently sheathed to the guide rod; the end of the guide rod is provided with a guide hole; the center of the pressure head is provided with a guide post; the guide post and the guide hole are matched; and the guide post is placed in the guide hole. By use of the variable-stiffness elastic energy storage device and the method thereby for testing rock instability, the variable-stiffness elastic energy storage device has the characteristics of small land occupation, large stiffness regulation range, convenience in processing and manufacture, low maintenance and repairing cost and long service life and can be combined with various rock mechanical test machines, and an instability testing method is adopted to test rock instability characteristics under different test conditions.
Owner:NORTHEASTERN UNIV

Steel tube end seal ring and sealing device

The invention discloses a steel tube end seal ring and a sealing device, and belongs to the technical field of sealing equipment. The steel tube end seal ring comprises a seal ring body and a supporting block arranged in an annular groove, and a steel tube seal peripheral edge and an end face seal peripheral edge are arranged on the end face of the seal ring body; an arc-shaped supporting groove is formed in the end face of one side of the seal ring body; a convex ring provided with a through groove is arranged on the outer circumferential face of the seal ring body. The sealing device comprises a sealing head and a locating sleeve which are mutually matched, and the steel tube end seal ring is arranged in the sealing device. A supporting ring of the locating sleeve is arranged in a supporting groove of the sealing head in a jacking mode and a gap is reserved. The steel tube end seal ring and the sealing device have the advantages that the pre-sealing link is omitted, the efficiency is improved, and cost is saved; the problem that the seal ring droops is solved, so that a pressure testing head can be designed smaller, and therefore a high-pressure test can be conducted on steel tubes with the diameter phi being larger than six hundred and thirty millimeters; the gap between the supporting groove and the supporting ring guarantees the effect that the seal ring body can be moved in place during pressure exertion, and after pressure is removed, the seal ring body can recover the original shape.
Owner:QINGDAO ZHONGRUITAI MESNAC TECH CO LTD

Beam-column connection nodes and connection methods of fabricated steel structures

ActiveCN107675801BAvoid brittle fracture problemsEnough deformation spaceBuilding constructionsSheet steelHigh intensity
The invention discloses a fabricated steel structure beam-column connection joint and a connection method thereof. The fabricated steel structure beam-column connection joint is used for solving the problem that an existing joint is poor in anti-seismic performance and for connection of a steel beam and a steel column. The end of the steel beam is a connection part, and a set of plate-shaped spring assemblies is arranged in each of mounting grooves on the two sides of the steel beam. A concrete block formed by grouting is arranged in a grouting space between a grouting trough and the inner wall of a rectangular steel pipe. A transition connection part is composed of a steel plate and the rectangular steep pipe, wherein the steel plate is fixed to the steel beam through a high-strength bolt, a plug-in part is formed in the rectangular steel pipe, and the connection part is inserted into the plug-in part to form partial overlapping. Anchor pulling holes are formed in the plate-shaped spring assemblies, a separation plate and the steel column, after a steel cable penetrates through the anchor pulling holes, the two ends of the steel cable are fixed to the steel column and the steel beam correspondingly. Under a non-seismic state, the joint is rigid connection, under a seismic state, movable flexible connection is formed, and thus the problem of fragile fracturing brought by the rigid joint can be avoided.
Owner:江苏承天新型建材有限公司

A prefabricated underground garage and its construction method

The invention discloses an assembly type underground garage. The garage comprises underground walls, a top plate, a bottom plate and at least three middle parking layers. Permanent upright columns are vertically arranged in the underground garage. The top plate and each middle parking layer both comprises a purlin supporting the corresponding underground wall, an oval ring bracket abutting against the inner wall of the purlin, two first supporting beams and a plurality of second supporting beams, wherein the two ends of each first supporting beam abut against the oval ring bracket and are supported on the corresponding permanent upright column, and the second supporting beams are supported between the first supporting beam and the oval ring bracket. The bottom parking layer is arranged on the bottom plate. The bottom parking layer and each middle parking layer are both provided with a vehicle carrying board capable of moving. Reinforcing treatment is conducted between prefabricated components of the underground garage, the integrity of the underground garage structure is improved, and accordingly the anti-seismic property of the underground garage is improved. The invention further discloses a building method of the underground garage.
Owner:JIANGSU DONGHENAN GEOTECHNICAL TECH CO LTD +1

Automobile steering gear gap adjustment mechanism

The invention provides a clearance adjustment mechanism for an automobile steering device. The clearance adjustment mechanism comprises a steering device shell and further comprises a pressing seat embedded in the steering device shell in a sliding manner, and an adjusting part which is connected to the interior of the steering device shell and abuts against the pressing seat. Under the external force drive, the position of the adjusting part is changed in the steering device shell so that the pressing seat can slide in the axial direction of the steering device shell. Two elastic supporting arms which are oppositely arranged and have supporting faces are formed on the pressing seat. A blocking limiting part which can limit external expansion of the two elastic supporting arms through self blocking is further arranged on the pressing seat. By means of the clearance adjustment mechanism for the automobile steering device, the engagement effect between a rack and a gear can be ensured, the engagement clearance between the rack and the gear can be adjusted, damage of the pressing seat due to colliding and impacting can also be avoided, in addition, an existing spring structure is omitted, adverse influences caused by changing of spring force can be avoided, and a good use effect is achieved.
Owner:GREAT WALL MOTOR CO LTD

Fabricated fully-prefabricated stair and fabricated stair building

PendingCN113789926ALow template requirements for productionIntegration of structure and decorationStairwaysCrack resistanceClassical mechanics
The invention relates to a fabricated fully-prefabricated stair and a fabricated stair building. The fabricated fully-prefabricated stair comprises stair flight plates, step plates, step plate connecting pieces and stair flight plate connecting pieces, wherein the step plates are located above the stair flight plates and are connected with the stair flight plates through the step plate connecting pieces; the ends of the stair flight plates are connected with the stair flight plate connecting pieces; and the stair flight plates are sandwich flat plates, and face plates and bottom plates of the stair flight plates are made of UHPC (Ultra High Performance Concrete). The fabricated fully-prefabricated stair is integrally formed in a factory, has the characteristics of light weight, high strength, good ductility, good durability, good crack resistance, crack self-repairing, convenience in construction and installation, material saving, high safety redundancy and the like and can be widely applied to various fabricated buildings in industry, civil use and the like. Enough deformation space is formed between the stair flight plates and a main structure of the fabricated stair building, so that damage of external force to the stair and the main structure can be reduced, and the idea of conquering with flexibility is embodied.
Owner:西藏涛扬建设工程有限公司

A variable stiffness elastic energy storage device and a method for testing rock instability using it

ActiveCN109253932BChange the loading stiffness arbitrarilyFacilitate qualitative and quantitative research on factors affecting instabilityMaterial strength using tensile/compressive forcesMaterial strength using steady shearing forcesRock engineeringPilot hole
The invention belongs to the technical field of rock engineering, and particularly relates to a variable-stiffness elastic energy storage device and a method thereby for testing rock instability. Theinvention has the following technical scheme that the variable-stiffness elastic energy storage device comprises a pressure head, a guide rod, a base, a gasket and a disc spring, wherein the guide rodis vertically installed on the center of the base; the gasket and the disc spring are independently sheathed to the guide rod; the end of the guide rod is provided with a guide hole; the center of the pressure head is provided with a guide post; the guide post and the guide hole are matched; and the guide post is placed in the guide hole. By use of the variable-stiffness elastic energy storage device and the method thereby for testing rock instability, the variable-stiffness elastic energy storage device has the characteristics of small land occupation, large stiffness regulation range, convenience in processing and manufacture, low maintenance and repairing cost and long service life and can be combined with various rock mechanical test machines, and an instability testing method is adopted to test rock instability characteristics under different test conditions.
Owner:NORTHEASTERN UNIV LIAONING

A support node with a U-shaped steel plate

The invention discloses a supporting joint with a U-shaped steel plate. The supporting joint is mainly composed of a U-shaped steel plate, a cushion plate, a long-strip installing hole and a suspender; the cross section of the U-shaped steel plate is in the shape of U or groove, the upper end of the U-shaped or groove-shaped opening is provided with wing edges, wherein one wing edge is overlapped on a connection structure, and the other one wing edge is overlapped on a multi-tower structure; one end of the suspender is crossed through the middle part of the wing edge at one side of the U-shaped steel plate and connected with the connection structure, and the other end is connected with a bracket of the multi-tower structure; a long-strip installing hole is arranged on the wing edge of the U-shaped steel plate connected with the connection structure along the axial direction, and long-strip installing hole is connected with the connection structure through a bolt or an anchor; the wing edge at the other side of the U-shaped steel plate is connected with the multi-tower structure through the bolt or the anchor. The supporting joint with the U-shaped steel plate is simple in structure and convenient to construct; besides, the supporting joint is simple and reasonable in stress, and can be recovered in small shock and repaired in big shock; particularly, the supporting joint plays the functions of 'relative isolation' and 'fuse wire' to the connection structure and the multi-tower structure; besides, the practicability is strong.
Owner:ARCHITECTURAL DESIGN & RES INST OF SOUTH CHINA UNIV OF TECH

Supporting joint with U-shaped steel plate

The invention discloses a supporting joint with a U-shaped steel plate. The supporting joint is mainly composed of a U-shaped steel plate, a cushion plate, a long-strip installing hole and a suspender; the cross section of the U-shaped steel plate is in the shape of U or groove, the upper end of the U-shaped or groove-shaped opening is provided with wing edges, wherein one wing edge is overlapped on a connection structure, and the other one wing edge is overlapped on a multi-tower structure; one end of the suspender is crossed through the middle part of the wing edge at one side of the U-shaped steel plate and connected with the connection structure, and the other end is connected with a bracket of the multi-tower structure; a long-strip installing hole is arranged on the wing edge of the U-shaped steel plate connected with the connection structure along the axial direction, and long-strip installing hole is connected with the connection structure through a bolt or an anchor; the wing edge at the other side of the U-shaped steel plate is connected with the multi-tower structure through the bolt or the anchor. The supporting joint with the U-shaped steel plate is simple in structure and convenient to construct; besides, the supporting joint is simple and reasonable in stress, and can be recovered in small shock and repaired in big shock; particularly, the supporting joint plays the functions of 'relative isolation' and 'fuse wire' to the connection structure and the multi-tower structure; besides, the practicability is strong.
Owner:ARCHITECTURAL DESIGN & RES INST OF SOUTH CHINA UNIV OF TECH

Finishing correction die suitable for special material welded pipe and finishing machine

The invention discloses a finishing correction die suitable for a special material welded pipe and a finishing machine. The finishing correction die comprises an upper die base and a lower die base, wherein the upper die base and the lower die base are fixed through a positioning pin, a cavity is formed by the interiors of the lower die base and the lower die base after the lower die base and thelower die base are closed, corresponding tiles are arranged in the cavity, die closing gaps are preset between the corresponding inner end faces of the lower die base and the upper die base after dieclosing, adjusting base plates are arranged at the two die closing gaps, the adjusting base plates are fixed to the corresponding inner end faces through stop bolts, it is guaranteed that the edges ofa welded pipe do not make contact with the outer surface of the special material welded pipe by adjusting the thicknesses and positions of the two adjusting base plates, the adjusting base plates comprise two sub-base plates which are combined into a whole to be in a hollow semicircular shape, and transition curved surfaces are arranged on the inner sides of the inner end faces of the upper die base and the lower die base. According to the finishing correction die suitable for the special material welded pipe and the finishing machine, the working performance is stable, diameter finishing capacity is large, the cavity of a die can be accurately and rapidly replaced, simple, exquisite and compact are achieved, special material welded pipes of various sizes can be finished and corrected, and efficient operation of a whole positive production line can be guaranteed.
Owner:南京麦驰钛业有限公司

Weather-proof fabricated building

The invention provides a weather-proof fabricated building. According to the building, first connecting holes and second connecting holes are formed in a cross beam; the included angle between the axis of each first connecting hole and the axis of each second connecting hole is an acute angle or a right angle or an obtuse angle; the quantity of the first connecting holes and the quantity of the second connecting holes are both two or more; the first connecting holes and the second connecting holes are arranged at intervals; four parallel limiting grooves are uniformly distributed in the side wall of the cross beam; the upper part and the lower part of a wallboard are respectively provided with connecting mortises and connecting tenons; the free ends of the connecting mortises penetrate through the first connecting holes and then are connected with the connecting tenons to connect the wallboard and the limiting grooves in an inserting manner; connecting mortises and connecting tenons are arranged on the front part and the rear part of a floor correspondingly; the free ends of the connecting mortises penetrate through the second connecting holes and then are connected with the connecting tenons; the floor is connected with the limiting grooves in an inserted mode; the end parts of adjacent cross beams are connected with each other; the tops and the bottoms of stand columns are connected with the cross beams; and the side parts of the stand columns can be connected with two adjacent wallboards. The building has the advantage of good weather resistance.
Owner:四川凯琳展科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products