The invention discloses watered sandy stratum 
earth pressure balance shield residue earth flattening equipment for 
tunnel construction, relates to the technical field of residue earth flattening equipment, in particular to the watered sandy stratum 
earth pressure balance shield residue earth flattening equipment for 
tunnel construction. The watered sandy stratum 
earth pressure balance shield residue earth flattening equipment for 
tunnel construction comprises a middle pressure wheel, an underframe plate and nozzles; the left side of the middle pressure wheel is provided with an auxiliary fixedplate; the left side of the auxiliary fixed plate is provided with a 
back pressure wheel; the front end of the underframe plate is provided with an auxiliary gas tank; the underframe plate is arranged at the front end of the auxiliary fixed plate; one end, far away from the underframe plate, of the auxiliary gas tank is provided with an auxiliary 
drive motor; and the left side of the auxiliary 
drive motor is provided with an auxiliary connection rod. According to the watered sandy stratum earth 
pressure balance shield residue earth flattening equipment for tunnel construction, a dust 
mask canprevent external dust from entering into a guide rod, and oil immersed 
sponge can effectively provide a 
lubrication effect to a push rod so as to lighten 
mechanical abrasion between the guide rod andthe push rod and be capable of effectively lightening the 
impact force between the guide rod and the push rod.