Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

86 results about "Basic power supply" patented technology

Power supply system without passing neutral phases in whole journey of high-speed passenger transport line motor train unit

The invention relates to a power supply system without passing neutral phases in the whole journey of a high-speed passenger transport line electric multiple units (EMU), and belongs to the field of power supply of high-speed EMU. A cantilever at the upper end of an anchoring section pillar is provided with two catenary wires, the catenary wires are connected with droppers, the droppers are connected with a single-phase alpha contact line and a single-phase beta contact line which are output from the secondary side of a traction transformer, the single-phase alpha and the single-phase beta are parallel, are insulated with each other, are input into the internal power supply system of the EMU through double-phase pantographs and are connected with a basic power supply unit TUB1 and a basic power supply unit TUB2 respectively, and the basic power supply unit TUB1 and the basic power supply unit TUB2 are separate with each other. No circuit breaker switch or neutral insulating section is needed to be arranged on the single-phase alpha and the single-phase beta, and no negative-sequence current generates in a three-phase high-voltage supply network. The invention further provides a circuit structure used for improving a CRH1-model 8-compartment EMU and a CRH5-model 8-compartment EMU into a 6-compartment EMU, a 10-compartment EMU, a 12-compartment EMU and a 16-compartment EMU recombined by two 8-compartment EMUs and for brake regenerative braking.
Owner:JILIN UNIV

Optimization policy-based power distribution network planning project automatic optimization method

The invention discloses an optimization policy-based power distribution network planning project automatic optimization method. By analyzing a relationship between development scale of a power distribution network of a region and power load increment, in combination with historical power network indexes and investment degree changes of the region, and based on current power network problems, loadprediction results and region investment policies, the priority levels of projects are automatically sorted, and a power network investment lower limit, namely, a rigid investment demand is calculated; by specifying an investment upper limit, the projects are automatically optimized; and the projects having the urgency degrees of priority and meeting the investment plan requirements are screened out. According to the optimization policy-based power distribution network planning project automatic optimization method, for the problems in current power distribution network planning project optimization sorting work, basic power supply obligations and investment benefit optimization of power network enterprises are comprehensively considered; a project optimization method is proposed; a project optimization sorting model is built; a quantitative analysis basis is provided for project optimization; and scientific guidance is provided for power network planning investment decisions.
Owner:KUNMING ENERSUN TECH +1

Planned project selecting and sequencing method comprehensively taking basic power supply responsibility of power network enterprise into consideration for low and medium voltage distribution network

InactiveCN105205573AMaximize the benefits of planning investmentForecastingResourcesBasic power supplyPower grid
The invention provides a planned project selecting and sequencing method comprehensively taking basic power supply responsibility of a power network enterprise into consideration for a low and medium voltage distribution network. The planned project selecting and sequencing method is characterized in that based on the property of public undertaking unit of the power network enterprise, defining the property of a project performing the basic power supply responsibility, and dividing the projects into two types of compulsory projects needing not to participate sequencing and to-be-selected projects needing to participate sequencing; analyzing the benefits and cost constitution of the to-be-selected projects, classifying and sequencing the to-be-selected projects of different types according to the reference of the benefit-to-cost ratio, and taking projects of which the benefit-to-cost ratio is large as preferred projects, so as to meet the maximization of project planning investment benefit of the enterprise under the premise of performing the basic power supply responsibility. The method can be effectively applied to selecting and sequencing of the low and medium voltage distribution network planned projects, so as to guide the power network enterprise to maximize the project planning investment benefit under the premise of performing the basic power supply responsibility while planning the projects.
Owner:STATE GRID FUJIAN ELECTRIC POWER CO LTD +2

Inland shore-based AIS (Automatic Identification System) ship data wireless transmission device and transmission method

The invention relates to an inland shore-based AIS (Automatic Identification System) ship data wireless transmission device and a transmission method. The device comprises a communication antenna, a solar cell panel, a storage cell, a GPRS communication module, an AIS data filtering module, an AIS shore-based receiver, a protection box and a support rod. The communication antenna, the solar cell panel and the protection box are fixed on the support rod. The storage cell, the GPRS communication module, the AIS data filtering module and the AIS shore-based receiver are fixed in the protection box. The connection is that the storage battery is unidirectionally connected with the GPRS communication module, the AIS data filtering module and the AIS shore-based receiver. The AIS data filtering module is bidirectionally connected with the GPRS communication module and the AIS shore-based receiver. The GPRS communication module is connected with the communication antenna through a radio frequency cable. The solar cell panel is connected with the storage cell. The technical effects are that redundant AIS message information can be filtered, the wireless transmission efficiency is improved, the public network transmission costs are reduced, and the device and the method are especially applicable to remote inland waterway regions in which AIS standard base stations cannot be applied due to the fact that there is no infrastructure such as a basic power supply and the internet.
Owner:TIANJIN 712 COMM & BROADCASTING CO LTD

Typical wiring diagnostic analysis method of distribution network line

The invention discloses a typical wiring diagnostic analysis method of a distribution network line. The method comprises the following steps of S1, establishing a data interface from a distribution network single line diagram and a distribution network looped network diagram system, obtaining the related data, performing the distribution network single line diagram analog-to-digital conversion, and generating a distribution network information standing book data table; S2, dividing the distribution network line into a plurality of feeder line groups according to the distribution network information standing book data table; S3, classifying the feeder line groups according to the characteristics, the application logic and the key information of the typical wiring groups; S4, carrying out typical wiring group classification counting on the output feeder line group categories, gathering the typical wiring conditions, and outputting the data; and S5, collecting the data outputted in the step S4 to generate a typical wiring group analysis report. The method has the following advantages that 1, the method reduces the burdens of the planners and basic power supply station business personnel, and has the characteristics of high real-time performance, high accuracy and high efficiency; 2, the category of each feeder group of the distribution network is comprehensively disclosed, and theimprovement of the production operation management level is facilitated.
Owner:GUANGDONG POWER GRID CO LTD +1

Supply unit and power supply system

The embodiment of the invention provides a supply unit and a power supply system. The supply unit comprises a battery module, a first fire extinguishing device and a second fire extinguishing device, wherein the first fire extinguishing device and the second fire extinguishing device are fixedly connected with the two ends of the battery module correspondingly. The battery module comprises a plurality of battery individuals. One end of each battery individual is connected with the first fire extinguishing device, and the other end of each battery individual is connected with the second fire extinguishing device. The first fire extinguishing device comprises a first fire extinguishing bin shell and a first installation mechanism, and the first fire extinguishing bin shell is arranged on the side, far away from the battery module, of the first installation mechanism. The second fire extinguishing device comprises a second fire extinguishing bin shell and a second installation mechanism, and the second fire extinguishing bin shell is arranged on the side, far away from the battery module, of the second installation mechanism. The supply unit and the power supply system can extinguish fire for the battery individuals when the battery individuals in the battery module explode, the situation that the whole battery module explodes and is damaged due to the exploded battery individuals cannot occur to the battery module, and the safety and reliability of batteries are guaranteed.
Owner:HUATING HEFEI POWER TECH

Triangle extension power-supply system

The invention relates to a power-supply system, in particular to a triangle extension power-supply system, which is a dual ring network among three power-supply point feed-out stations so as to form a triangle power-supply system to supply power for a setting power-supply area; the dual ring network connection is arranged in the periphery of the power-supply area and between each two power-supply points, i.e. A station and B station, B station and C station and A station and C station, thus forming a power-supply system with a triangle structure; and a central area is set in the power-supply area, and each two power-supply points which pass through the central area are connected by a single ring network among stations. The advantages of the invention lie in that a triangle is a stable geometric figure, three power-supply points are easy set to form a triangle power-supply area in the power-supply area, thereby having flexible and reliable power-supply performance; three power-supply points in a basic model are needed, stationing is simple and convenient and economical efficiency is high. The system can carry out system extension by skillfully using geometrical property of the triangle based on the periphery of the developed triangle extension basic power-supply system.
Owner:STATE GRID CORP OF CHINA +1

Remote monitoring center with seismic device controller and control operation method thereof

InactiveCN103676917ASolve remote maintenance problemsEnhance operational support capabilitiesTotal factory controlProgramme total factory controlBasic power supplyMarine engineering
The invention provides a remote monitoring center with a seismic device controller and a control operation method thereof, which aim at solving the problems that a majority of malfunctions of a seismic monitoring system occur on a basic power supply part, the electronic elements and devices are easy to breakdown by the lightning when the software problem such as system halt of the device, the environment cannot be continuously and effectively monitored in real time, and the maintenance personnel need to restore the functions of the seismic monitoring system on site. The remote monitoring center is provided with a lightning-proof device which is connected with a seismic station through a remote terminal so as to reflect the situation of the seismic station in real time. The remote monitoring center has the beneficial effects that the remote maintenance problem of the seismic device is solved, the operation guaranteeing capacity of the seismic monitoring system can be enhanced through the system construction, and the service capacity of the seismic monitoring system can be enhanced. Moreover, a lightning arrester is used for preventing the controller from being broken down in the lightning and rainy days. The remote monitoring center and the control operation method have the characteristics of simplicity in operation, good safety stability, strong practicability and the like.
Owner:辽宁省地震局

Energy supply scheme configuration system and method based on multi-energy complementation of smart park

The invention discloses an energy supply scheme configuration system and method based on multi-energy complementation of smart park. The energy supply scheme configuration system comprises a multi-energy power supply system, an energy storage system, an electric power configuration system, electric equipment, and a power supply monitoring system, wherein the output ends of the multi-energy power supply system and the energy storage system are connected with the input end of the electric power configuration system. The invention relates to the technical field of power systems. According to the energy supply scheme configuration system and method based on multi-energy complementation of the smart park, by arranging the electric power configuration system, total output electric power can be preferentially supplied according to a preset level, it is guaranteed that some important electric appliances are preferential and meet the most basic power supply when electric power is insufficient, economic losses can be reduced, when electric power is sufficient, the redundant electric power except the basic electric power is distributed in proportion and gradually increased to the normal operation power of the equipment, the electric power can be distributed more reasonably, important equipment is prevented from stopping operating, electric power waste is avoided, and cost is saved.
Owner:ZHEJIANG ZHONGXIN POWER ENG CONSTR CO LTD +2
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products