The invention relates to the field of
bus scheduling and path optimization, and provides a passenger
bus connection method, device and equipment under subway operation interruption, and the method comprises the steps: building a passenger transfer demand distribution randomness model based on historical data, the historical data being passenger transfer demand data; determining a passenger evacuation strategy according to the fault
station and the passenger transfer demand distribution randomness model; determining a candidate
bus route set based on a passenger evacuation strategy; constructing a bus
connection model based on the candidate bus
route set, and determining an optimization target taking minimization of
total delay as the bus
connection model; the
total delay is determined according to the
delay of common passengers, the
delay of passengers who do not get on the bus successfully and the
delay of detained passengers; and solving the optimization target based on a
genetic algorithm, and outputting an optimal solution. According to the invention, the defect of low scheduling efficiency of a traditional
single line connection method in the prior art is overcome, the evacuation efficiency is improved, and passenger delay is reduced.