The invention relates to a scientific construction management method suitable for an epidemic situation background, and the method is characterized in that the method comprises the following specific steps: 1, building a safety reference, 2, building a safety management system, 3, determining a fortification reorganizing item, 4, building a fortification implementation safety guarantee system, which mainly comprises four aspects: 1, spot inspection before fortification, 2, inspection in fortification, 3, an example meeting system, and 4, emergency abnormity corresponding. And 5, information updating is kept through provincial inversion and summarization, and loophole retransmission is completely eradicated. According to the method, the fortification propelling process is standardized, propelling method reference can be provided for various subsequently developed fortification, and the fortification developing difficulty under the condition of no experience is reduced.