The invention discloses a frame type steel
wire rope suspended concrete false bottom construction method. Relates to a mining technology. Comprising the following steps that S1, two rows of round steel are driven into the two side walls of the bottom of a stope, and the two rows of round steel are arranged at intervals in the vertical direction; s2, main reinforcements and auxiliary reinforcements are bundled on the two rows of round steel, the arrangement direction of the main reinforcements is the same as that of the round steel, and the auxiliary reinforcements are perpendicular to the main reinforcements; s3, a plurality of prefabricated frames are installed on the main reinforcements and the auxiliary reinforcements, and the prefabricated frames are arranged at intervals in the direction of the auxiliary reinforcements; s4, an anchor rod is obliquely inserted into the two side walls of the stope downwards, and two hanging bars are hung on the anchor rod; s5, concrete pouring is conducted, and after concrete pouring and curing are completed, pouring of the concrete false bottom can be completed; the two rows of spaced round steel are arranged at the bottom of the stope, the main reinforcements and the auxiliary reinforcements are bundled, the prefabricated frame is installed, the anchor rods are obliquely inserted, and the hanging reinforcements are connected to specific positions, so that uniform
stress distribution and reliable hanging are achieved, and the beneficial effects that the false bottom supporting stability is enhanced, center
cracking and overall caving are prevented, and the mining
operation safety is improved are achieved.