Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

52results about How to "Guaranteed Secure Boot" patented technology

Computer operating system starting method

The invention provides a computer operating system starting method. The computer operating system starting method includes that: a computer is powered; a request is sent to a hard disk to read an MBR (master boot record) bootstrap program via control hardware by a BIOS (basic input/output system); the MBR bootstrap problem is captured from the hard disk by the control hardware, and a scheduled control program is transmitted to a computer mainboard; the scheduled control program is executed by the computer mainboard, identity of a user of the computer is authenticated, and an authentication pass instruction is sent to the control hardware by the computer mainboard when the user passes the identity authentication; the MBR bootstrap program captured from the hard disk is sent to the computer when the control hardware receives the authentication pass instruction; the MBR bootstrap problem is read by the computer mainboard, and an operating system on the hard disk is booted to start. Since the control hardware is not related to the specific computer mainboard and the operating system, customization of a special mainboard is not required, good compatibility is provided, starting of a slave disk is controlled effectively, and safe starting of the computer operating system is guaranteed.
Owner:BEIJING HUADA ZHIBAO ELECTRONICS SYST

Lithium battery pack

The invention discloses a lithium battery pack, which is used for supplying power for a controlled device, and comprises a lithium battery, a battery management system, a detection switch and a delaystart circuit. The detection switch is arranged in a charge and discharge interface of the lithium battery. The delay start circuit comprises a first switch, a second switch, a delay resistor and a start control unit. The delay resistor is a negative temperature coefficient resistor; the first switch is connected in series with the delay resistor to form a whole body, and the formed whole body isconnected in parallel with the second switch to form a start unit; the start unit is connected in series between the controlled device and the lithium battery; the start control unit is electrically connected with the first switch and the second switch; the start control unit receives the detection signal of the detection switch and outputs a control signal; and the first switch and the second switch are connected or disconnected according to the control signal. According to the lithium battery pack, the detection switch detects the working state of the lithium battery automatically, and the delay start circuit adjusts the start time of the controlled device according to the detection signal fed back by the detection switch, thereby ensuring safe start of the controlled device through start delay.
Owner:SUZHOU BROADLINE POWER SUPPLY TECH

Bypass starting system and starting method of combined cycle extraction condensing and back pressure unit

The invention provides a bypass starting system and starting method of a combined cycle extraction condensing and back pressure unit. The bypass starting system mainly comprises an extraction condensing type steam turbine unit, a back pressure type steam turbine unit and a steam condenser. The waste heat boiler capacity of the extraction condensing type steam turbine unit is the same as that of the back pressure type steam turbine unit. The extraction condensing type steam turbine unit is provided with the steam condenser with 100% waste heat boiler steam quantity. When the extraction condensing type steam turbine unit is under the maximum steam extraction condition, the steam condenser can contain the steam quantity generated during starting of the back pressure type steam turbine unit. The extraction condensing type steam turbine unit is provided with three bypasses including the extraction condensing machine 100% gas turbine load high-pressure bypass, the extraction condensing machine 100% gas turbine load medium-pressure bypass and the extraction condensing machine 100% gas turbine load low-pressure bypass. The back pressure type steam turbine unit is provided with a back pressure turbine 10% gas turbine load high-pressure bypass, a back pressure turbine 10% gas turbine load medium-pressure bypass, a back pressure turbine 15% gas turbine load medium-pressure bypass, and a back pressure turbine 100% gas turbine load low-pressure bypass.
Owner:ZHEJIANG ELECTRIC POWER DESIGN INST +1

Starting method of non-starting steam after tripping of power generating set of thermal power plant

The invention provides a starting method of non-starting steam after tripping of a power generating set of a thermal power plant. The starting method comprises the following steps that after the powergenerating set is tripped, a boiler starts to quickly purge; a low-pressure bypass electric door on an inlet pipeline of a steam exhaust device is closed, and a high-pressure bypass electric door connected to a pipeline between a boiler superheater outlet and a boiler reheater inlet is opened, so that a reheating cold section is connected to a steam turbine shaft seal steam source, the normal steam supply of the shaft seal is maintained to be not interrupted, and the steam turbine is prevented from entering the cold steam cold water; the situation that the generating set trips due to the factthat a boiler main device is damaged is confirmed, a plurality of oil guns are put into for heating and boosting; when all the oil guns are normally combusted, a coal mill is started for heating andboosting; when a starting parameter of the generating set meets the condition that a preset extreme-heat-state punching parameter is met, steam turbine punching is carried out immediately; and grid connection with loads is carried out. According to the method, the steam-free starting under the thermal condition of the power plant can be realized without establishing a starting boiler and without being connected to the peripheral power plants.
Owner:新疆知信科技有限公司

A centrifugal chiller and a quick start-up method after power failure

ActiveCN107101411BControllable startup processUninterrupted control outputMechanical apparatusFluid circulation arrangementCentrifugal chillerThermodynamics
The invention discloses a centrifugal chiller and a method for quick start-up after power failure, which is characterized in that the quick unloading device of the compressor includes a four-way valve and a quick unloading valve, specifically: a quick unloading valve is arranged outside the four-way valve to communicate with the four-way valve The high-pressure oil outlet of the valve and the high-pressure oil chamber of the piston cavity, the flow channel where the quick unloading valve is located and the internal flow channel of the four-way valve simultaneously form a high-pressure oil inlet channel; another quick unloading valve is set outside the four-way valve to communicate with the piston cavity The low-pressure oil chamber and the oil tank, the low-pressure chamber in the piston chamber are connected to the oil tank through the other quick unloading valve and the internal return channel of the four-way valve; an adjustable guide vane is arranged at the inlet of the compressor, and the adjustable guide vane is controlled by the four-way valve. The valve controls opening and closing. Quick startup can be achieved in the event of an abnormal disconnection of the main power supply and a short recovery.
Owner:MCQUAY AIR CONDITIONING & REFRIGERATION WUHAN

Automatic vamp pressure maintaining device

The invention discloses an automatic vamp pressure maintaining device which comprises a bottom plate, a PLC control device, a vamp limiting unit installed on the bottom plate and a gland fastening unit, wherein the vamp limiting unit and the bottom plate are installed in parallel and used for limiting a vamp, a flip cover pressure maintaining unit comprises a flip cover control device, a gland and an air bag, the air bag is communicated with an air source, the lower end of the gland is rotatably mounted on a bearing plate and is driven by the flip cover control device to control the rotation condition of the gland, the flip cover control device is mounted on the bottom plate, the gland rotates downwards to be buckled on the upper surfaces of the vamp limiting unit and the gland fastening unit, the air source inflates the air bag to enable the air bag to expand to wrap the vamp so as to form a closed pressure maintaining interval, the gland fastening unit can press or be separated from the upper surface of the gland after rotating by a certain angle, and the PLC control device is used for controlling the flip cover pressure maintaining unit and the gland fastening unit to work. The device has the advantages of automatic vamp pressure maintaining, accurate working process control, high vamp pressure maintaining efficiency, high vamp pressure maintaining quality and the like.
Owner:知守科技(杭州)有限公司

Control device and method for low-temperature start-up and operation of wind power generating set

The invention provides a low-temperature starting and running control device and method for a wind generating set. The control device comprises a control branch circuit, a heating branch circuit and a power supply branch circuit, wherein the control branch circuit, the heating branch circuit and the power supply branch circuit are connected between a first power source end and a second power source end in parallel. The control branch circuit comprises a temperature monitor, an electromagnetic control part of a first electromagnetic switch device and an electromagnetic control part of a second electromagnetic switch device. The first end of the temperature monitor is connected with the first power source end, and the second end and the third end of the temperature monitor are connected with the electromagnetic control part of the first electromagnetic switch device and the electromagnetic control part of the second electromagnetic switch device respectively. The electromagnetic control part of the first electromagnetic switch device and the electromagnetic control part of the second electromagnetic switch device are further connected with the second power source end. The heating branch circuit comprises a heater and a switch part of the first electromagnetic switch device which are connected in series. The power supply branch circuit comprises a power source and a switch part of the second electromagnetic switch device which are connected in series. According to the low-temperature starting and running control device and method in the technical scheme, safe starting and stable running of the wind generating set in the low-temperature environment are achieved, and the working efficiency of the wind generating set is effectively improved.
Owner:BEIJING ETECHWIN ELECTRIC
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products