The invention belongs to the field of steel structure buildings, and particularly relates to a hoisting frame design application method of a continuous truss column top hinging structure. The method comprises the following steps of: 1, a hoisting frame system arrangement stage; 2, a computational analysis stage; 3, a hoisting system design and manufacturing stage; 4, an installation stage; 5, a hoisting and monitoring stage: installing a hydraulic hoisting device and a temporary reinforcement device, hoisting a continuous truss to a target elevation, and carrying out stress strain monitoring; and 6, an unloading and dismounting stage: hoisting the structure to a target elevation position, then, unloading the hydraulic hoisting device, dismounting a hoisting frame and a conversion cross beam, cutting brackets, and finishing the construction. The hoisting frame design application method has the advantages that the completeness of the original truss structure is ensured; the influence on an existing structure is avoided; the form is simple and compact; the stress is reasonable; the construction is convenient; and the economical performance is good, and the like.