Provided are a spiral-unearthing
pipe-jacking
pipe curtain construction method and device. The method comprises the steps that the step 1, foundation pits and
a site are prepared; the step 2, the spiral-unearthing
pipe-jacking pipe curtain construction device and an electric
welding machine are installed and debugged; the step 3, a common
drill, a guide head, a stub, deviation correction oil cylinders, an initial-section spiral
drill pipe, an initial-section outer sleeve and an initial-section pipe curtain steel pipe are installed on the spiral-unearthing pipe-jacking pipe curtain construction device; the step 4, a hole-entering angle is regulated; the step 5, drilling and jacking are conducted; the step 6, lengthening is conducted; the step 7, drilling, jacking and lengthening are circulated; the step 8, the common
drill, the guide head, the stub and the deviation correction oil cylinders are dismounted at the position of the receiving foundation pit; the step 9, disassembly is circulated; the step 10, the spiral-unearthing pipe-jacking pipe curtain construction device is moved to a second hole, and the steps 3-10 are repeated; the step 11, in this way, construction of pipe curtain steel pipes of all other holes is finished. The method for combining spiral unearthing and oil cylinder jacking is adopted, disturbance in stratums is small, and construction accuracy is high.