The invention discloses a bridge combined multi-stage
energy consumption buffering device which comprises a
steel jacket box, a steel partition plate for partitioning space is arranged in the
steel jacket box, and a first-stage
energy consumption structure for first-stage buffering
energy consumption and a second-stage energy consumption structure for second-stage buffering energy consumption are arranged in the partitioned space. The
steel jacket box is arranged outside the
pier through the rubber
fender. The UHPC panel and the stainless steel composite steel plate are adopted, and the service life of the structure is remarkably prolonged under the complex service environment of a
water area. In the aspect of
collision resistance, the
system has a definite deformation mode induction mechanism, the collision force is dispersed through the UHPC panel with the large rigidity, the collision force is buffered through the
honeycomb with the small rigidity, the collision force is transmitted to the high-strength steel
grating structure through the UHPC and the dense
honeycomb, the energy consumption efficiency is greatly improved, the force transmission path is reasonable, coverage of different anti-collision grades can be achieved, and the
system is suitable for popularization and application. And meanwhile, the compression
stroke of the energy dissipation
assembly is increased, the peak
impact force is reduced, and designability is good.