The invention belongs to the related technical field of flexible flow shop scheduling, and discloses a multi-objective mixed spider monkey optimization method for a PCB electroplating task sorting problem, and the method comprises the following steps: S1, parameter definition and population initialization; s2, performing neighborhood movement by adopting insertion operation; s3, performing dominated sorting on the Nei neighborhood solutions of each spider monkey and the spider monkey itself; s4, the fitness F (i) of each non-dominated solution is calculated, and the current position of each non-dominated solution is updated according to the fitness; s5, carrying out interlace operation on the solution F1 and the random solution F2 to obtain a filial generation; s6, forming a joint population by the solution in the S5 and the solution in the global file set; s7, combining the combined population in the step S6 and the generated filial generation, and updating the solution in the current group k; s8, updating the local file set and the global file set of each group; if the termination condition is met, terminating and outputting a solution set; otherwise, continuing iteration until the end. The performance is improved, and the applicability is good.