The invention discloses a selection and
layout method for
base station construction. The method comprises the following steps of S1, selection, wherein a section with gentle
terrain is searched, a safe distance between the section and a surrounding building is reserved, the distance between adjacent base stations is determined, and it is ensured that the coverage area between the base stations isreasonable; S2, mounting, wherein a bottom plate is moved to a construction position by holding a rack, a grounding block is enabled to be in contact with the ground, and the bottom plate is stabilized at an original position by utilizing a hydraulic push rod in a leveling fixing mechanism; S3, pit digging, wherein the ground is dug out of ground
pile pits through a
drill bit in a pit digging andsoil taking mechanism, and soil generated by pit digging is discharged into a collecting cavity through a soil discharging channel; and S4, carrying, wherein a conveying belt in an automatic carryingmechanism can convey ground piles to a placement arc-shaped plate, and the ground piles are pushed into the ground
pile pits through a positioning sleeve. A
pile sinking hammerhead moves up and down repeatedly, the ground piles placed into the ground pile pits are hit into the ground, and the situation that the
base station construction is unqualified due to the fact that subsequent base stationscannot be fixed due to
instability of the ground piles is avoided.