Pile-forming drilling tool for screw pile and pile-forming construction method thereof

The invention relates to a pile-forming drilling tool for a screw pile and a pile-forming construction method thereof, wherein forward drilling threads are arranged at the lower part of the pile-forming drilling tool, and backward sweeping threads are detachably arranged on the upper part thereof. The pile-forming construction method comprises the following steps: adopting special screw pile equipment to be assorted with the drilling tool to align with a pile position; utilizing the drilling tool to drill downwards so as to form threaded soil holes to reach the design depth of the pile, and meanwhile utilizing the sweeping threads at the upper part of the drilling tool to extrude and sweep the soil threads to form straight holes which reach the design depth of a straight lever section; lifting up the drilling tool in a rotating mode, and simultaneously concreting to form the thread section and the straight lever section of the pile; and after concreting is completed, placing a reinforcing cage to form the reinforced concrete screw pile. The drilling tool provided by the invention can effectively eliminate part of a threaded soil mass to form the straight holes by adopting forward threads and backward threads, thus achieving the effect of forming screw pile holes by boring at a time and realizing hole-forming and pile-forming of the screw pile at a time; and the pile-forming construction method has simple working procedures, faster speed, reduced construction resistance and no need of taking soil.
Owner:彭桂皎

Block-resistant spraying device

ActiveCN101429769AImprove the efficiency of migration constructionImprove stabilityArtificial islandsUnderwater structuresEngineeringHigh pressure water
The invention provides an anti-clogging jetting machine, which consists of a shell, a piston sleeve, a composite piston and an anticorrosive inner sleeve, wherein the shell is provided with a cavity, and the top of the shell is provided with a high-pressure water pipe joint; the high-pressure water pipe joint and a lower cavity are arranged downwards; the bottom of the piston sleeve is provided with a threaded convex ring, and the threaded convex ring at the bottom of the piston sleeve is rotatably connected with the bottom of the shell; the middle of the piston sleeve is provided with a trapezoidal hole with large upper part and small lower part; the lower end of the composite piston is provided with a small piston which is glidingly connected with a small hole at the bottom of the trapezoidal hole in the middle of the piston sleeve, and the upper end of the composite piston is provided with a large piston which is glidingly connected with the upper part of the trapezoidal hole; a spring is sleeved on an excircle of the small piston; the lower end of the spring is connected with the middle of the trapezoidal hole; the upper part of the composite piston is provided with a water inlet hole, and the lower part of the composite piston is provided with a blowhole; and the water inlet hole and the blowhole are connected with each other through a channel in the center of the composite piston. Compared with the prior art, the jetting machine has the characteristics of reasonable design, simple structure, safety and reliability, convenient use, easy maintenance and so on, and has good popularization value and use value.
Owner:ZHEJIANG BETHEL TECH CO LTD

Petroleum platform pile shoe lifting auxiliary system

ActiveCN101126235AImprove the efficiency of migration constructionImprove stabilityArtificial islandsUnderwater structuresEconomic benefitsWater flow
The invention provides a system to assist to lift the pile shoe of the petroleum platform, which is to arrange a high pressure pump on the petroleum platform, a feed water pipe of the high pressure pump passes through the central tubular cavity of the pile and is connected with an anti-blockage injector arranged in the pile shoe at the lower end of the pile, the anti-blockage injector is arranged in the upper side, the lower side and the periphery of the inner wall of the pile shoe, the high-pressure water flow injected from the anti-blockage injector is utilized to cut the silt adhered on the outer surface of the pile shoe; a pulsator is additionally arranged in the pile shoe, the silt adhered on the outer surface of the pile shoe is made loose and flow like the porridge through the vibration of the pulsator and thus, the resistance is reduced and the lifting speed of the pile shoe is improved. The invention has the advantages that the invention needs less investment, is easy to be operated and the lifting speed of the pile is high, which can improve the operating efficiency in the transfer of the petroleum platform and shorten the construction period. In addition, when the pile of the petroleum platform is lowered in a new site, the pulsator arranged in the pile shoe can be utilized to expedite the sinking speed of the pile shoe to improve the stability of the pile shoe and thus, the invention has huge economic benefit.
Owner:ZHEJIANG BETHEL TECH CO LTD

Construction method for pulling out steel sheet piles close to existing buildings

The invention relates to steel sheet pile pulling out technique, in particular to a construction method for pulling out steel sheet piles close to existing buildings, and solves the technical problem that at present, foundations of the existing buildings are prone to influences so as to influence safety of buildings when the steel sheet piles are pulled out in construction of road pipe networks close to the buildings. The construction method for pulling out the steel sheet piles close to the existing buildings is characterized by including the steps: (1) taking five steel sheet piles as a unit to pull out the steel sheet piles; (2) using a 'pulling out five and piling two' construction method, namely piling two lime gravel piles when every five steel sheet piles are pulled out, for punning and filling pile seams, above underground water level, left after first-time pulling out; (3) pulling out remnant steel sheet piles for the second time, and using the 'pulling out five and piling two' construction method for treatment of the pile seams left after second-time pulling out of the steel sheet piles. The method is safe, reliable, simple in construction operation, quick in construction, effective in reinforcement, low in manufacturing cost, low in environmental constraint and low in influences on the existing buildings and pipelines.
Owner:CHINA RAILWAY SIXTH GROUP +1

CFG core gravel composite pile, composite foundation formed by CFG core gravel composite pile and construction method

The invention discloses a CFG core gravel composite pile, a composite foundation formed by the CFG core gravel composite pile and a construction method. The CFG core gravel composite pile comprises aCFG core and a gravel shell wrapping the CFG core, wherein the gravel shell is formed by sand and macadam according to the volume ratio being (1-2):1. The composite foundation formed by the CFG core gravel composite pile is characterized by comprising a soft soil foundation, the CFG core gravel composite pile driven into the soft soil foundation and a mattress layer filled into the position abovethe CFG core gravel composite pile and the soft soil foundation, and a geogrid is arranged on the mattress layer. The invention further discloses a construction method. The CFG core gravel composite pile, the composite foundation formed by the CFG core gravel composite pile and the construction method have the beneficial effects that the construction is easy and convenient, the pile forming speedis high, super-static pore water pressure in soil between piles in the construction period is quickly scattered, the soil strength is quickly restored, the working period is shortened, the post-construction settlement is small, and the industrial waste is used for reducing the building cost of projects; and the economic benefit and the social benefit are obvious.
Owner:JIANGSU UNIV OF SCI & TECH

Rapid hole-forming construction method of large-diameter deep hole pile foundation under karst geology

InactiveCN111594041AEasy to moveAvoid drilling difficulties, low efficiency and other problemsDrilling drivesFlushingKarstEconomic benefits
The invention discloses a rapid hole-forming construction method for a large-diameter deep hole pile foundation under karst geology. 'Rotary drill and reverse circulation impact drill' combined relaydrilling is performed, a rotary drill rapidly performs drilling construction of a covering layer, and a reverse circulation impact drill is used for relay construction when a karst geological layer isdrilled. The combined construction process gives full play to the advantages of the two kinds of drills under the situations of different geological conditions and hole depths, the advantages are complemented with each other, and the construction efficiency and economic benefits of the large-diameter deep hole pile foundation under the karst geology are improved. Drilling of single drilling equipment is converted into combined drilling of the two different kinds of drilling equipment, the construction progress of the pile foundation is greatly accelerated under the condition of ensuring the hole-forming quality of the pile foundation, meanwhile, environmental friendliness is better achieved, civilized construction is facilitated, input of personnel and mechanical equipment is reduced, andthe good economic benefits are generated.
Owner:THE 5TH ENG MBEC

Stirring device and method for stirring sea mud

The invention mainly discloses a stirring device and method for stirring sea mud. According to the technical scheme, the stirring device comprises a chassis, a first motor, a second motor, a stirring machine head and a conveying device; the stirring machine head comprises an outer drill pipe, an inner drill pipe, first stirring blades and second stirring blades; the inner drill pipe is provided with a drill bit and third stirring blades; the drill bit is located at the bottom end of the inner drill pipe, and the third stirring blades are located between the first stirring blades and the second stirring blades; the inner drill pipe is provided with a first conveying channel and two first discharging sections; and the third stirring blades are provided with a second conveying channel and a second discharging section. The method comprises the steps of primary stone crushing, grout spraying, stirring and sinking, in-situ stirring, detecting, grout spraying, stirring and ascending, secondary detecting and stirring machine head cleaning. According to the stirring device and method, the multiple stirring blades are adopted, stirring is uniform, and the stirring efficiency and the stirring mixing effect are improved; and the multiple discharging sections are arranged, the one-time grout spraying amount is large, the pile forming speed is high, the pile forming quality is good, and the construction cost is saved.
Owner:ZHEJIANG UNIV OF WATER RESOURCES & ELECTRIC POWER

Forming construction method of long-spiral pore-forming pile-slab-pile supporting and anti-seepage continuous wall

The invention discloses a forming construction method of a long-spiral pore-forming pile-slab-pile supporting and anti-seepage continuous wall. The continuous wall is formed in a manner that a long-spiral drilling high-pressure jetting cemented soil composite concrete pile slab composite pile is taken as a construction main body and pile-slab-pile crossed construction and combination in different sequences is carried out. The forming construction method comprises the following steps that Step one, construction preparation is carried out; Step two, pile foundation construction and pore-forming are carried out, high-pressure jetting cement paste slab forming hole construction, and press grouting pile slab concrete construction are carried out, concrete is subjected to press grouting to reach the elevation of a pile top, then first plain concrete pile slab construction is accomplished; Step three, a second plain concrete pile slab is coaxially connected and constructed according to a designed pile space, and after second plain concrete pile slab construction is accomplished, the construction of a pile-slab-pile supporting and anti-seepage continuous wall structural unit is accomplished; and Step four, the pile slab construction of the next unit is carried out according to the operational procedures above, then the complete pile-slab-pile supporting and anti-seepage continuous wall is formed. According to the forming construction method of the long-spiral pore-forming pile-slab-pile supporting and anti-seepage continuous wall, stand-alone construction is realized, the equipment investment is low, the energy consumption is low, and the cost is saved.
Owner:李金良

Spiral high-pressure jetting wing-enlarged stirring bottom-expanded stiff composite pile, construction method thereof and drilling machine

The invention discloses a spiral high-pressure jetting wing-enlarged stirring bottom-expanded stiff composite pile, a construction method thereof and a drilling machine. According to the stiff composite pile, the construction method thereof and the drilling machine, the technical problems of relatively low bearing capacity, high cost, certain quality defects and the like of an existing stiff composite pile are solved. The spiral high-pressure jetting wing-enlarged stirring bottom-expanded stiff composite pile comprises an outer pile body, an inner core pile body and a bottom-expanded base, wherein the outer pile body, the inner core pile body and the bottom-expanded base are combined into a whole, the strength composite pile further comprises a prefabricated pile tip installed at the lowerend of the inner core pile body, and the inner core pile body and the prefabricated pile tip are planted into the center of the outer pile body. According to the stiff composite pile, the construction method thereof and the drilling machine, firstly, the outer pile body is subjected to high-pressure grouting injection to carry out first-stage extrusion and compaction on pile periphery soil, whenguncreting is carried out on center concrete through the bottom-expanded base, second-stage extrusion and compaction are carried out on the outer pile body, third-stage extrusion and compaction are carried out on the outer pile body in the process of planting the inner core pile body, and the outer pile body which are formed through the three stages of extrusion and compaction is extruded and compacted with the surrounding soil layer, and the resistance of the side of the pile is greatly improved; and secondly, the three stages of extrusion and compaction are carried out on the bottom-expandedconcrete through high-pressure grouting bottom expanding, concrete guncreting bottom expanding and the prefabricated pile tip, so that the resistance of a pile end is further improved.
Owner:中航旭日(北京)岩土工程技术有限公司 +2

A variable-diameter fully threaded pile and its construction method

The invention discloses a variable diameter all-thread pile and a pile forming method thereof. The variable diameter all-thread pile comprises an upper-part pile core (2), wherein one end of the upper-part pile core is connected to a lower-part pile core; an upper-part thread pile thread (1) is integrally formed on the upper-part pile core, and a lower-part thread pile thread (4) is integrally formed on the lower-part pile core; the upper-part thread pile thread and the upper-part pile core constitute an upper-part pile body; the lower-part pile core and the lower-part thread pile thread constitute a lower-part pile body; the diameter of the lower-part pile body is not less than that of the upper-part pile body. According to the variable diameter all-thread pile and the pile forming method, the pile cores with different diameters are fixed together, outer threads are integrally formed on the pile cores, so that bearing capacity of a cast-in-place pile is improved to the maximum, the pile forming technology simple and quick in pile forming speed; the variable diameter all-thread pile and the pile forming method are less in soil that is pressed out while pressing soil to form the pile, low in cost, energy-saving and environment-friendly, and applicable to popularizing in the field of constructional engineering.
Owner:刘淼

Water photovoltaic pile driver

The invention discloses a water photovoltaic pile driver. The water photovoltaic pile driver comprises a pile driving barge body, a pile driving frame arranged on a pile driving barge platform, a driving mechanism for controlling a pile driving barge to displace, and a measuring mechanism used for measuring the pile driving point of a pile driving mechanism. The pile driving barge body is composedof two buoyancy tank structures floating on the water side by side and walking steel plates fixedly connected with the buoyancy tank structures, and the walking steel plates are mounted above the twobuoyancy tank structures, and are fixed to the barge top face at equal distances in the length direction of the buoyancy tank structures. The free falling body motion of a diesel hammer is used for beating a pipe pile, equipment is simple, the pile forming speed is high, the work efficiency is high, meanwhile, combination of GPS real-time positioning and an electric anchor tool is adopted, precision of the pile lowering position is ensured, finally, a fixed clamp and a guide rail thereof are in mutual effect to rapidly and accurately achieve positioning and moving in the continuous pile driving process, the work efficiency is greatly improved, and the labor intensity of an operation worker is reduced.
Owner:POWERCHINA HUADONG ENG COPORATION LTD

Pore-forming construction method by mixing high pressure water with air in long screw pile in high clay layer

The invention relates to a pore-forming construction method by mixing high pressure water with air in a long screw pile in a high clay layer, and the pore-forming construction method comprises the following steps: first step, mounting a plurality of paths of central shunts beneath the power head of a long screw pile machine, and mounting a high pressure water conveying pipe with a spray head and an air conveying pipe on the outer side of a long spiral drill pipe; second step, when a drill bit drills to the clay layer, injecting high pressure water into the high pressure water conveying pipe through a high pressure water injection pump, wherein the water flow injected at a high pressure cuts clay between spiral pieces into broken blocks; third step, pressing air into the air conveying pipe through an air compressor; fourth step, forming a water-air-soil mixture at the pile bottom, and the water-air-soil mixture moves upwards to a pile orifice under the rotary thrust of the drill pipe. The construction method provided by the invention is simple and convenient to operate, wide in rock stratum application range, high in pile forming speed and capable of greatly improving the construction speed and efficiency and filling a blank in the pile foundation industry of our country.
Owner:江西中恒地下空间科技有限公司

Pile position alignment device and pile position alignment process applying pile position alignment device

The invention relates to a pile position alignment device and a pile position alignment process applying the pile position alignment device. The pile position alignment device comprises two inclined support rods arranged at the front end of a support frame of a three-axle piling machine, two outward moving positioning rods and two connecting modules; the two outward moving positioning rods are horizontally arranged in parallel; the back ends of the two outward moving positioning rods are fixed at the lower part of the front end surface of the support frame; the center lines of the two outwardmoving positioning rods are perpendicular to the drill rod center line on two sides of a three-axle drill rod; the center lines of the outward moving positioning rod and the drill rod on the same sideare positioned in the same vertical surface; the front ends of the two outward moving positioning rods are fixedly connected with the lower ends of the two inclined support rods; the upper ends of the two inclined support rods are fixed at the upper part of the front end surface of a support frame; the connecting modules comprise connecting ropes, and fixed pieces bound at the lower ends of the connecting ropes; the upper ends of the connecting ropes of the two connecting modules are fixed on the two outward moving positioning rods; and the distances from the two fixed places to the center lines of the drill rods on the same sides are equal. The pile position alignment device is convenient to operate and suitable for large-batch pile formation.
Owner:CSCEC STRAIT CONSTR & DEV

Method for treating open-to-traffic soft soil foundation bridgehead settlement through high-pressure jet grouting piles by means of embankment hole drilling

The invention relates to a method for treating open-to-traffic soft soil foundation bridgehead settlement through high-pressure jet grouting piles by means of embankment hole drilling. The method comprises the following steps that (1) the treatment lengths of settlement highway sections on the two sides of an open-to-traffic highway bridge are determined, the treatment sections are divided into four subsections of the subsection I, the subsection II, the subsection III and the subsection IV, the subsection I and the subsection III are located on the left highway section, and the subsection II and the subsection IV are located on the right highway section; (2) the left highway section is closed, asphalt running pavements or concrete running pavements of the subsection I and the subsection II of the left highway section are cleaned, pavement bed courses and embankment filling which are located under the pavements are exposed, the part, from the shoulder to the slope toe, of the left highway section is kept in the original state, and passage of the right highway section is ensured; (3) running pavement subgrades are treated through the single-tube high-pressure jet grouting pile; and (4) after treatment of the running pavement subgrades is completed, the triple-tube high-pressure jet grouting pile is adopted for treating embankment slopes. The method has the advantages that the method is suitable for treatment of excessive settlement of bridgehead highway sections and also suitable for treatment of excessive settlement of any other highway sections of open-to-traffic highways.
Owner:NINGBO UNIV

Construction method for bottom-expanded pile casting by long-spiral drilling and compacted half soil sampling

The invention relates to a construction method for bottom-expanded pile casting by long-spiral drilling and compacted half soil sampling. The construction method comprises the following steps: adopting a long-spiral drilling machine provided with a special in-rock drilling bit for construction to a preset pole-hole depth; backfilling rock soil discharged by the long-spiral drilling machine into a pole hole, and adopting the long-spiral drilling machine provided with a special in-rock drilling bit for extruded drilling to the preset depth; installing a reamer at the bottom part of a drilling rod by replacement, and putting into the bottom part of the pile hole for reaming construction; after reaming, taking out the long-spiral drilling machine, installing a multifunctional slag removing drum at the bottom part of the drilling rod by replacement, and putting into the pile hole for slag removing construction; after the residual slag at the bottom part of the pile hole is removed completely, opening a concrete output valve at the bottom part of the multifunctional slag removing drum, and concreting into the expanded bottom of the pile hole by a concrete pump; and lifting into a steel bar cage, and vibrating for positioning the steel bar cage by utilizing a vibrator and the self weight of the steel bar cage. The cast hole pile has the advantages of large force bearing area at the pile bottom, high load bearing force for single pile and strong vibration resistance at the bottom part of the single pile.
Owner:江西省欣峰地基基础工程有限公司

Prefabricated screw pile construction method

InactiveCN107012868ATo achieve common workTo achieve a compact effectBulkheads/pilesLine tubingHigh pressure
The invention discloses a prefabricated screw pile construction method, relates to a pile construction method, and aims to solve such problems as small adaption range, difficult pile plantation, lower side friction of piles, low strength of pile bodies, lower bearing capacity of the pile bodies, and easiness in necking, pile breakage phenomenon and low construction efficiency in the pile forming process to different extents in a traditional pile forming method by cast-in-place piles and prefabricated piles. The method comprises the following steps: (1) prefabricated screw piles and connecting pipelines are mounted; (2) the prefabricated screw piles are directly screwed into soil by the rotating power of a slewing drilling machine for pile plantation, or the spraying hole expansion pile plantation is performed by a high-pressure jet grouting mode; and (3) the post-grouting is performed for pile ends. As the method adopts the high-pressure spraying in through holes in pipe walls, the scene pulp discharge quantity is greatly reduced, no soil is discarded, no water falls, residents are not disturbed, the construction scene is tidy, the single-pile bearing capacity is high, the number and the length of the piles can be reduced, the raw materials are saved, and the effects of low carbon and energy conservation are achieved. The method is suitable for prefabricated screw pile construction.
Owner:王景军

Large-scale prefabricated enclosure structure and construction method for deep foundation pit

The invention discloses a deep foundation pit large-size prefabricated envelop enclosure and a construction method. The deep foundation pit large-size prefabricated envelop enclosure comprises composite piles, and jet grouting piles or stirring piles located between the adjacent composite piles and engaged with the composite piles. Each composite pile comprises a prefabricated pile, and cement soil arranged on the outer circle of the prefabricated pile in a filling manner, wherein a cylindrical composite pile structure is integrally formed by the cement soil and the prefabricated piles. The envelope enclosure has the double functions of soil blocking and water stopping. The soil blocking function is achieved through the composite piles, holes formed in the composite piles are circular, the prefabricated piles are planted in the holes, and gaps are filled with the cement soil. The water stopping function is achieved in the manner that the cement soil is engaged with the jet grouting piles or the stirring piles between the adjacent composite piles. The prefabricated piles in a pile foundation project are introduced into the envelop enclosure in the deep foundation pit project, displacement piles are changed into low displacement piles, and the applicability of the prefabricated piles to a stratum is improved; the pile manufacturing and pile forming quality is guaranteed, the prefabricated piles can smoothly reach the designed depth, and pile intersecting is avoided; and pile enclosing and water stopping are combined.
Owner:JINAN RAILWAY TRANSPORT GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products