155results about How to "Realize a tight connection" patented technology

Full-set dismantling and installing construction method of bridge overpassing existing line

The invention discloses a full-set dismantling and installing construction method of a bridge overpassing an existing line. Full-set dismantling and installing construction is conducted on a plurality of beam segments needing to be dismantled of a used beam to be dismantled from front to back. The full-set dismantling and installing construction method comprises the steps that firstly, a pavement layer of the bridge surface is milled; secondly, roof-propping is conducted on the beam segments; thirdly, preparatory work is conducted before hoisting; fourthly, hoisting and moving-out are conducted; fifthly, one beam segment is installed after replacement; sixthly, full-set dismantling and installing construction of the next beam segment is conducted, specifically, full-set dismantling and installing construction is conducted on the next beam segment needing to be dismantled of the used beam to be dismantled according to the first step to the fifth step of the method; and seventhly, the sixth step is repeated once or more than once till full-set dismantling and installing construction of all the beam segments needing to the dismantled in the used beam to be dismantled is completed. The method is simple in step, reasonable in design, easy and convenient to implement and good in using effect, full-set dismantling and installing construction of the bridge overpassing the existing line can be completed easily, conveniently and rapidly, the construction process is safe and reliable, the construction period is short, and the method is economical and practical.
Owner:中铁二十局集团第三工程有限公司

Vertical type shell-and-tube heat exchanger

The invention relates to a vertical type shell-and-tube heat exchanger. The vertical type shell-and-tube heat exchanger is characterized by comprising a vertically arranged shell; the upper end and the lower end of the shell are each connected with a channel through a tube plate; a shell side inlet tube is arranged on one side of the upper end of the shell; a shell side outlet tube is arranged on one side of the lower end of the shell; a tube side inlet tube is arranged at the top of the channel arranged at the upper end of the shell, and a tube side outlet tube is arranged at the bottom of the channel arranged at the lower end of the shell; a plurality of baffle plates provided with notches are arranged inside the shell at intervals in a staggered mode; every two adjacent baffle plates are fastened to the side walls on different sides of the shell correspondingly; passages allowing fluid to flow are formed between the baffle plates; the free end of each baffle plate is lower than the connecting end of each baffle plate; a heat exchange tube bundle penetrates through the baffle plates; and the two ends of the heat exchange tube bundle are fastened to the two tube plates. The baffle plates located on the same side of the shell are mutually parallel. An included angle between each baffle plate and the horizontal plane is 15-25 degrees. The vertical type shell-and-tube heat exchanger can prevent accumulated liquid from forming on the baffle plates, the heat exchange effect is improved, and the service life of the vertical type shell-and-tube heat exchanger is prolonged.
Owner:CHINA NAT OFFSHORE OIL CORP +1

Bridge warning device convenient to mount and dismount

The present invention discloses a bridge warning device convenient to mount and dismount. The device comprises a mounting base and a warning unit. The right side wall of the mounting base is provided with a groove in matched connection with the warning unit. The right side wall of the mounting base is provided with handle grooves above and below the above groove and at an equal distance from the above groove. The upper end wall and the lower end wall of the warning unit are provided with handles capable of being accommodated inside the handle grooves. On the left side of the groove, the mounting base is internally provided with a first sliding cavity and a second sliding cavity, wherein the first sliding cavity and the second sliding cavity are equivalently arranged up and down. Between the first sliding cavity and the second sliding cavity, the mounting base is internally provided with an unlocking sliding cavity. A run-through connection groove configured to run through the unlocking sliding cavity is arranged between the left bottom of the first sliding cavity and the left top of the second sliding cavity. The right bottom of the first sliding cavity and the right bottom of the second sliding cavity are provided with downwardly-extending locking grooves. The bridge warning device is simple in structure, time-saving and labor-saving in installation and convenient to maintain.
Owner:杜董

Crossing existing line bridge girder dismounting method

The invention discloses a crossing existing line bridge girder dismounting method. A dismounted bridge girder is a girder crossing an existing railway line and is formed by splicing a plurality of girder segments to be dismounted from front to back. During complete set dismounting construction of any segment to be dismounted, the process comprises the following steps that firstly, a bridge deck pavement is milled, specifically, the bridge deck pavement of the girder segment constructed currently is milled; secondly, the girder segment is jacked up, specifically, the girder segment constructed currently is horizontally jacked upwards through a vertical jacking device, so that the girder segment constructed currently is separated from two supporting piers; thirdly, preparation operation before hoisting is conducted; and fourthly, the girder segment constructed currently is horizontally hoisted upwards through a bridge girder erection machine and moved to the outer sides of the two supporting piers. The method is simple in step, reasonable in design, easy and convenient to construct and good in application effect, the complete set dismounting construction process of the crossing existing line bridge girder can be completed easily, conveniently and rapidly, and the construction process is safe and reliable, the construction period is short, and the method is economic and practical.
Owner:中铁二十局集团第三工程有限公司

Prefabricated building with good heat insulation performance

The invention discloses a prefabricated building with the good heat insulation performance. The prefabricated building comprises a base plate. A top plate is arranged on the top of the base plate. Theinner ends of heat insulation plates are fixedly connected with decorative plates. The inner ends of side plates are provided with clamping assemblies. Through rotatable connection between the base plate and the side plates, between the side plates and between the side plates and the top plate and arrangement of the heat insulation plates, the prefabricated building with the good heat insulationperformance has the high heat insulation performance. Through clearance fit between clamping rods and transverse grooves and clearance fit between the clamping rods and through holes, the side platescan be vertically tightened, the prefabricated building can be folded and pressed down. Through clearance fit between sliding blocks and sliding grooves and clamping connection between slots and grooves, fulcrum bars can be inserted into the slots by rotating cranked levers and can be tightened by reversely rotating the cranked levers. Through threaded connection of screw rods and cylindrical tubes, cams abut against the cranked levers, and then the top plate below and the base plate above can be in fastened connection. Therefore, the assembly efficiency is greatly improved, and the assembly difficulty is reduced.
Owner:定州市筑业装配式建筑科技有限公司

Nickel-titanium shape memory alloy composite pipe joint forming method

The invention aims at providing a nickel-titanium shape memory alloy composite pipe joint forming method comprising the following steps of: assembling two layers of nickel-titanium shape memory pipes together in a way of clearance fit or interference fit to form a double-layer pipe, wherein the inner diameter d0 of the double-layer pipe is less than the outer diameter d2 of two pipes to be connected; performing expanding deformation on the double-layer pipe to enlarge the inner diameter of the double-layer pipe to d1 so as to compound and form the two layers of nickel-titanium shape memory pipes into a whole, wherein the d1 is more than the outer diameter d2 of the pipes to be connected; sheathing a pipe joint with the expanded diameter outside the two pipes to be connected; and recovering the shape of the pipe joint through low-temperature heating, and connecting the two pipes after the pipe joint is automatically contracted, thereby completing the forming of the pipe joint. The nickel-titanium shape memory alloy composite pipe joint forming method overcomes the defect that the wall of the conventional nickel-titanium shape memory alloy pipe joint is excessively thin or thick, and ensures the nickel-titanium shape memory alloy pipe joint to have enough fastening force and enough strength so as to enable the nickel-titanium shape memory alloy pipe joint to have excellent connection performance.
Owner:HARBIN ENG UNIV

Disassembly-simple display screen device

ActiveCN106641665AImproves robustness and tightnessEasy to disassemble, replace and maintainStands/trestlesComputer engineering
The invention discloses a disassembly-simple display screen device. The disassembly-simple display screen device comprises a mounting frame and a display screen; a sinking groove matched and connected with a display screen is formed in the right side wall of the mounting frame; a first slip cavity and a second slip cavity are symmetrically formed in the mounting frame on the left side of the sinking groove up and down; an opening slip cavity is formed in the mounting frame between the first slip cavity and the second slip cavity; a communicating groove for penetrating through the opening slip cavity is formed between the bottom of the left side of the first slip cavity and the top of the left side of the second slip cavity; closing grooves downwards elongated are respectively formed in the bottoms of the right sides of the first slip cavity and the second slip cavity, and are provided with mounting grooves for penetrating through the closing grooves and elongated on the left and right sides; slip blocks are slidingly connected into the mounting grooves; guide grooves are symmetrically formed in the elongated sections on the left sides of the mounting grooves up and down; convex parts elongated in the guide grooves are symmetrically arranged on the left sides of the slip blocks up and down; and the elongated sections on the right sides of the mounting grooves penetrate through the mounting frame, and are communicated with the sinking groove. The disassembly-simple display screen device is simple in structure, saves both time and labors during mounting, and is convenient to maintain.
Owner:SHENZHEN WEIMAISI TECH

Sugarcane harvesting machine

The invention provides a sugarcane harvesting machine. An adjustable header is positioned at the foremost end of the whole machine; a front end feeding inlet a charging device is movably connected tothe rear side of the adjustable header; a cutting mechanism is arranged at the junction part of the adjustable header and the charging device; an adjustable cylinder is further arranged between the adjustable header and the charging device; a vertical tip cutting device is erected in the middle of the charging device; a feeding device is arranged at the front end of a leaf peeling device; the feeding device is spliced to the rear end of the charging device; the charging device and the leaf peeling device are connected by virtue of the feeding device; the charging device, the feeding device andthe leaf peeling device are combined to form an integral sugarcane stem feed mechanism; a track frame used for supporting a telescopic aggregation device is fastened on a wheeled travelling mechanismby means of soldering; and the aim of suspending the telescopic aggregation device behind the discharge outlet of the leaf peeling device is achieved by virtue of the track frame. The sugarcane harvesting machine has the characteristics of compact structure, more flexible movement, stable operation, higher operation efficiency and stronger practicality.
Owner:曾华山

Vertical support stress uniform distribution device for building reinforcement engineering

ActiveCN114033212AUniform distribution of support stressGood support and adjustmentBuilding repairsArchitectural engineeringBuilding construction
The invention provides a vertical support stress uniform distribution device for building reinforcement engineering, and relates to the technical field of building construction. The device comprises a lower mounting seat; wherein lower mounting seat is mounted on a base plane through expansion bolts; a supporting body which is connected to the upper end face of the lower mounting base in a fastened mode through an adjustable fastening assembly; a protection assembly which is installed at the top of the supporting body, and the protection assembly is located on the outer side of the stress uniform distribution core block; and an auxiliary supporting assembly which is arranged at the top of the supporting main body. The vertical support stress uniform distribution device can effectively protect a matching surface, guarantees good angle adjusting capacity, can observe and monitor the deflection condition of an upper mounting seat, has good supporting capacity and adjusting capacity, is convenient to use and simple to operate, has higher working stability and practicability, and solves the problems that a traditional supporting device cannot well protect the spherical matching surface, the deflection condition of the support is difficult to effectively observe and monitor, so that the deflection of the support is too large.
Owner:李扬

Method for improving building construction efficiency

The invention belongs to the technical field of engineering construction, and in particular relates to a method for improving the building construction efficiency. A steel connecting sleeve used in the method comprises connecting sleeve bodies, a spring, a locking nut, a locking handle, a clamping module and a screw. Face teeth are arranged in a round area on the stepped surface at one end of eachconnecting sleeve body. The other end of the screw is rotatably connected to one end of the locking handle. A rotating shaft hole in the locking handle is eccentrically disposed with the cylindricalsurface. A first cylindrical hole is formed in the end surface at the other end of the connecting sleeve body. The clamping module is arranged in the first cylindrical hole and used for clamping and locking steel bars inserted into the connecting sleeve bodies. Due to the fact that the face teeth are arranged at one end of each connecting sleeve body, and the rotating shaft hole in the locking handle is eccentrically arranged with the cylindrical surface, the angle between two connecting sleeve bodies can be adjusted. The clamping module is arranged in the first cylindrical hole to clamp and lock the steel bars, and finally fastening connection of the two steel bars can be achieved.
Owner:江西省第十建筑工程有限公司

Quick assembling system for square building and assembling method thereof

The invention discloses a quick assembling system for a square building and an assembling method thereof. The quick assembling system comprises a bottom plate, the top of the bottom plate is providedwith a top plate, the outer sides of the inner ends of the bottom plate and the top plate are rotationally connected with side plates, and the inner ends of the side plates on the same side are rotationally connected. Through cooperation of the bottom plate, the top plate, the side plates and a clamping assembly, when the device is used, the bottom plate and the side plates, the side plates, as well as the side plates and the top plate are rotationally connected. Accordingly, the device can be folded and compressed downwards, convenience of transporting and storing is greatly improved, and moreover, quick setting up can be achieved; slide rods penetrate into the upper side plates and the lower side plates and achieve an effect of connection rods, moreover, the length of the connection rodsis large, the connection rods can bear larger bending force, and breaking of joints between the upper side plates and the lower side plats is avoided; and meanwhile, clamping rods are in clearance fit with transverse grooves and are in clearance fit with through holes, thus, vertical fastening between the side plates can be achieved, the assembling efficiency is greatly improved, the assembling difficulty is reduced, and the assembling effect is better.
Owner:威海市建筑设计院有限公司

Friction disk for grounding device of high-speed train

The invention relates to a friction disk for a grounding device of a high-speed train, and the friction disk comprises a friction disk body which is connected with a friction body. The surface of thefriction body is provided with a conductive wear-resistant coating layer. The friction plate body is provided with an inner cavity which is used for installing the friction body, and the inner cavityforms a stepped structure, wherein the lower part is provided with an internal thread and is a small cavity, and the upper part forms a big cavity. A side surface of the friction body forms a steppedstructure cooperating with the inner cavity, and the lower part of the side surface of the friction body is provided with an external thread and serves as a small shaft, wherein the upper part of theside surface forms a big shaft. The small shaft and the small cavity cooperate with each other to achieve the connection, and the big shaft and the big cavity cooperate with each other to achieve theconnection. Through the cooperation of the big shaft and the big cavity and the cooperation of the small shaft and the small cavity, the fastening connection between the friction disk body and the friction body is achieved, thereby guaranteeing the stability of the friction disk in an operation process. Moreover, the mode enables the friction body to have a small amplitude in the vibration process, thereby reducing the mechanical wear caused by the vibration, and prolonging the service life of the friction plate.
Owner:扬州丰泽轨道交通科技有限公司

Dry-hanging curtain wall connecting piece

ActiveCN106049724ASimplify the replacement repair processRealize a tight connectionWallsMating connectionKeel
The invention provides a dry-hanging curtain wall connecting piece. The dry-hanging curtain wall connecting piece is characterized in that the connecting piece comprises a back bolt and a bolt lock; the back bolt comprises a clamping part, and the bolt lock comprises a protective frame and an openable clamp matching mechanism located in the protective frame; the clamp matching mechanism comprises an upper lip piece, a lower lip piece and two rotary shafts, the upper lip piece is rotatably connected with the protective frame through one rotary shaft and formed by stacking a plurality of strips, and hook heads connected with the clamping part in a matched mode are arranged at the front ends of part of the strips; and the lower lip piece is rotatably connected with the protective frame through the other rotary shaft and formed by stacking a plurality of strips, and hook heads connected with the clamping part in a matched mode are arranged at the front ends of part of the strips. According to the dry-hanging curtain wall connecting piece, the back bolt is embedded in the back side of a dry-hanging plate and connected with the bolt lock in an inserted mode, so that replacing and repairing procedures of a single plate are greatly simplified; and in addition, compared with a traditional back bolt, the back bolt can be connected with a keel or an anchor bolt in a fastened mode.
Owner:中山市博路德幕墙门窗系统有限公司

Key testing device used for radio frequency electromagnetic field radiated susceptibility test of key type equipment

The invention relates to a key testing device used for a radio frequency electromagnetic field radiated susceptibility test of key type equipment. The key testing device comprises two upright posts, wherein the upright posts are distributed at the two sides of a key of to-be-tested equipment, the lower end of each upright post is connected with the to-be-tested equipment, a clamping slot is formedin the upper end of each upright post, a sliding rod is arranged in each clamping slot, the clamping slots in the two upright posts support the two ends of the sliding rod respectively, a hanging bracket is arranged on the sliding rod, an electromagnetic push rod is arranged on the hanging bracket, the lower end of the electromagnetic push rod is connected with an elastic pressure head, and the elastic pressure head corresponds to a key of the to-be-tested equipment. The key testing device provided by the invention can press the key of the to-be-tested equipment, the key is tested in an anechoic chamber, and whether the key can be normally used under the electromagnetic radiation condition is observed, so that a working environment of the tested equipment is really simulated, and accuracyof a result of the radio frequency electromagnetic field radiated susceptibility test is guaranteed.
Owner:HENAN PROVINCE INST OF METROLOGY

Extending fast-loading rock anchorage device

The invention relates to an extending fast-loading rock anchorage device. The extending fast-loading rock anchorage device is characterized by comprising an anchor rod, a lower nut, an upper wedge-shaped block and a lower wedge-shaped block, central long holes are formed in the center of the upper wedge-shaped block and the center of the lower wedge-shaped block respectively in the longitudinal direction, the upper wedge-shaped block and the lower wedge-shaped block are respectively provided with an inclined face in the longitudinal direction, the inclined face of the upper wedge-shaped block and the inclined face of the lower wedge-shaped block are oppositely arranged and are corresponding sliding planes, the anchor rod penetrates through the central long hole of the upper wedge-shaped block and the central long hole of the lower wedge-shaped block, the anchor rod is of a step shaft structure with a step circular truncated cone, threads are arranged on the lower portion of the step circular truncated cone of the anchor rod, and the anchor rod is sleeved with the upper wedge-shaped block, the lower wedge-shaped block and the lower nut in sequence. The extending fast-loading rock anchorage device has the advantages that due to the fact that a penetrating hole is communicated with the hollow portion of the upper wedge-shaped block and the hollow portion of the lower wedge-shaped block, when the device is pressed by an anchor bolt screw rod end circular truncated cone, the top end of an extending petal is radially expanded, the wedging function on surrounding materials is generated, and when an anchor bolt is completely tightened, the larger the tensile force borne by the anchor rod is, the more tightly anchoring is.
Owner:MILITARY TRANSPORTATION RES INST OF PLA GENERAL LOGISTICS DEPT +1

Blast furnace air inlet pipeline mounting method and hydraulic system

The invention discloses a blast furnace air inlet pipeline mounting method and a hydraulic system. The blast furnace air inlet pipeline mounting method comprises the following steps: carrying out buttjoint on an air hose flange and a descending pipe flange; enabling a piston rod in a stretching state of a hydraulic cylinder to penetrate through the air hose flange and the descending pipe flange,and connecting a locking piece on the piston rod to prevent the piston rod from be removed out of a threaded hole; controlling the piston rod to shrink to enable the air hose flange and the descendingflange to be in tight coupling and keep the tight coupling state under extrusion of the locking piece and a cylinder block; except the threaded hole allowing the piston rod to penetrate through, enabling bolts to penetrate through other threaded holes of the air hose flange and the descending pipe flange, and enabling the bolts to pre-tighten the air hose flange and the descending pipe flange; controlling the piston rod to stretch out to remove extrusion of the hydraulic cylinder to the air hose flange and the descending pipe flange and enabling the air hose flange and the descending pipe flange to keep the tight coupling state under the connection of the bolts. According to the blast furnace air inlet pipeline mounting method, the hydraulic cylinder compresses two butt joint flanges, sothat both labor and time are saved during the mounting process, and the overhauling efficiency is improved.
Owner:PANGANG GRP XICHANG STEEL & VANADIUM CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products