The
basement bottom plate penetrating type deep layer post-grouting reserved pipeline structure comprises a
basement bottom plate, a first grouting
pipe and a second grouting
pipe are arranged on the
basement bottom plate in a penetrating mode, one end of the second grouting
pipe communicates with the first grouting pipe, and the other end of the second grouting pipe communicates with the first grouting pipe. One end of the first grouting pipe is connected with the second grouting pipe, the other end of the second grouting pipe is located at a water collecting well, communicated with the outside and higher than the top face of the basement bottom plate, the first grouting pipe and the second grouting pipe are connected through a connector connecting piece, the second grouting pipe is filled with a gravel layer, and the first grouting pipe is filled with an
asphalt factice layer. Different from a traditional single-section grouting pipe, the grouting pipe adopts the two-section
assembly design, due to the segmented
assembly mode, installation is more convenient, the construction difficulty is reduced, meanwhile, the overall stability is improved, the grouting pipe is firmer and more reliable, the construction efficiency of the grouting pipe is effectively improved, the construction complexity is reduced, and the construction cost is reduced. And the problem of
water seepage of the bottom plate is effectively prevented.