Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

41results about How to "Reduce construction complexity" patented technology

Limited micro-space multifunctional piling machine

The invention discloses a limited micro-space multifunctional piling machine, and belongs to the technical field of piling machines. The limited micro-space multifunctional pile machine comprises a main machine assembly, a drilling rig assembly, a power head assembly, a multi-channel telescopic drill rod and a process drill bit, and the power head assembly comprises a box body, a telescopic driving hydraulic motor, a drill rod driving hydraulic motor, a multi-channel flow divider, a drill rod rotating joint and a screw driving joint, and the telescopic driving hydraulic motor, the drill rod driving hydraulic motor, the multi-channel flow divider, the drill rod rotating joint and the screw driving joint are installed on the box body. The multi-channel telescopic drill rod is controlled to rotate and stretch through the dual-drive power head, so that the overall height of the pile machine can be effectively reduced, low-clearance pile foundation construction can be achieved, multiple fluid channels are constructed in the multi-channel telescopic drill rod, the telescopic drill rod can be matched with drill bits of various technologies, and the construction efficiency is improved. Various pile foundation construction technologies are completed on one pile machine, and the blank of a multifunctional pile machine is filled. In addition, due to the design that the multi-channel shunting power head is matched with the multi-channel telescopic drill rod, rod connecting operation can be reduced or not needed, construction complexity is reduced, and construction efficiency is improved.
Owner:JIANGSU JIANYUAN CONSTR CO LTD +1

Photovoltaic building integrated curtain wall assembly

The invention relates to the technical field of photovoltaic panels, and discloses a photovoltaic building integrated curtain wall assembly which comprises embedded parts, a plurality of embedded parts are arranged on an outer wall body, an L-shaped groove is formed in each embedded part, and a locking assembly is arranged in each embedded part. When the first photovoltaic glass is separated from the L-shaped block, the linkage assembly drives the limiting block to move into the L-shaped block, then the insertion block on the second photovoltaic glass is inserted along the L-shaped groove, and finally after the second photovoltaic glass makes contact with the L-shaped block, the limiting block is driven by the linkage assembly to move out of the L-shaped block and then clamped into the groove. According to the method, replacement can be completed by directly inserting the second photovoltaic glass without dismantling the peripheral first photovoltaic glass to create an operation space or pulling out the L-shaped block, so that the construction steps are greatly simplified, the construction complexity is reduced, and the replacement operation is more convenient.
Owner:CHINA GREEN CONSTR JIANGSU BUILDING ENERGY SAVING CO LTD

Integrated system host for controlling large-screen display

ActiveCN224217227UReduce construction complexityReduce redundant wiringCathode-ray tube indicatorsHardware architectureControl system
The utility model discloses an integrated system host for controlling large-screen display, and relates to the technical field of large-screen display control systems. The backboard comprises a backboard module, the inner wall of the backboard module is provided with a PCIE slot, and an interface of the PCIE slot is plugged with a signal processing module. According to the utility model, through cooperation of the signal processing module and the backboard module which are designed in a modularized manner, a hardware architecture assembled according to needs and a PCIE slot interconnection technology are adopted, a user is allowed to flexibly select HDMI input and output, audio processing and network exchange of functional modules according to actual needs, the construction complexity is greatly reduced, redundant wiring is reduced, and the cost is reduced. And meanwhile, primary and secondary hierarchical design among the modules and an independent communication mechanism ensure that operation can be recovered by quickly replacing a secondary module when any module fails, so that the fault-tolerant capability and the maintenance efficiency of the system are remarkably improved, and a reserved expansion space supports subsequent function upgrading or capacity expansion and is adaptive to large-screen display scene requirements of different scales.
Owner:SHENZHEN LINGKE TECH CO LTD

A self-temperature controlled float oil tank

A self-regulating temperature float-type fuel tank, relating to the field of engine fuel tank technology, includes a tank body with an oil inlet at the top and an oil outlet at the bottom. Inside the tank body are a heater, a temperature sensor, and a cooling core. The heater and cooling core are horizontally positioned above the oil outlet, and the temperature sensor is positioned close to the oil outlet. The cooling core includes several cooling pipes and several clamping plates, which are vertically spaced. The cooling pipes pass horizontally through the clamping plates, and their two ends are connected to the tank body. Water inlets and outlets, communicating with the interior of the cooling pipes, are installed on the side walls of the tank body. The water inlets are connected to a water pump. This application can change the original cooling method, improve cooling efficiency, reduce engine output loss, adjust engine power output in a timely manner, and improve user experience.
Owner:WEICHAI HEAVY MACHINERY CO LTD

Soft rock large deformation control method and rapid supporting system suitable for TBM tunnel construction method characteristics

PendingCN122082802AReduce the displacement around the holeReduce construction complexityUnderground chambersTunnel liningShotcreteSupporting system
The invention discloses a soft rock large deformation control method and a rapid support system suitable for TBM tunnel construction method characteristics, the method is implemented based on an anchoring support system composed of a short anchoring support system and a long anchoring support system, and the method is suitable for an open TBM construction scene: in a TBM tunneling process, before a shield is exposed, the shield is not exposed, and the long anchoring support system is not exposed; a short anchoring support system of a full-length anchoring anchor rod structure is timely arranged in the radial direction of the 180-degree area of the upper half ring of the tunnel section through a cutter head edge cutter hole, and the short anchoring support system and a shield cooperate to form an initial deformation control system; after the shield is exposed, according to the deformation degree of the surrounding rock, full-length anchoring anchor rods or pre-stressed anchor cables are adopted in a graded mode, long anchoring supporting systems are arranged at intervals with the short anchoring supporting systems in a spiral mode, then the long anchoring supporting systems are cooperatively borne with steel arches, reinforcing meshes and sprayed concrete, and the long anchoring supporting systems are matched with 70m system sprayed concrete and 1000m secondary lining construction behind a tunnel face. According to the method, the displacement around the hole is effectively controlled, the TBM is prevented from being stuck, and the construction safety and efficiency of the open-type TBM in the soft rock large-deformation geology are improved.
Owner:SOUTHWEST JIAOTONG UNIV +1

An electric pump well intelligent oil production system, pipe column and use method

This invention discloses an intelligent oil production system for electric pump wells, a tubing string, and a method of use, relating to the field of downhole communication technology. The system includes a surface control cabinet, an AC carrier cable, a wireless transceiver connector (upper and lower), a DC carrier cable, and downhole intelligent equipment. The surface control cabinet supplies power to the downhole intelligent equipment via the AC carrier cable, the wireless transceiver connector (upper and lower), and the DC carrier cable. The surface control cabinet performs bidirectional AC carrier communication with the wireless transceiver connector (upper and lower) via the AC carrier cable. The wireless transceiver connector performs bidirectional DC carrier communication with the downhole intelligent equipment via the DC carrier cable. This invention reduces the number of cables, solving the problem of the difficulty of laying multiple cables on the external tubing string during construction, while also reducing tubing string costs and production costs.
Owner:CHINA PETROLEUM & CHEMICAL CORP +1

Gutter inlet trimming and dismantling device and method

The invention provides a gutter inlet trimming and dismantling device and method. The device comprises a hollow cuboid-shaped cabinet body with an opening in the lower portion; the operation panel is fixed on the upper surface of the cabinet body and is used for performing operation control on the device; the first longitudinal cutting assembly and the second longitudinal cutting assembly are fixed to the inner sides of the two narrow edges of the cabinet body respectively; the third longitudinal cutting assembly is fixed on the inner side of one long edge of the cabinet body; the first longitudinal cutting assembly, the second longitudinal cutting assembly and the third longitudinal cutting assembly can conduct longitudinal cutting. The horizontal cutting assembly is fixed to the inner side of the side, opposite to the third longitudinal cutting assembly, of the cabinet body and can conduct horizontal cutting; and the electric cabinet box is used for accommodating a control module of the cutting assembly. The method has the advantages that multi-device combined construction is not needed, the occupied area of construction is small, and road passing is not affected; by means of the device, the gutter inlet can be broken and dismantled at a time, operation efficiency is high, and the risk of traffic jam is reduced.
Owner:BEIJING DRAINAGE CONSTR CO LTD

Highway toll station sub-node barrier machine

The utility model relates to the technical field of intelligent transportation, concretely relates to high -speed toll station vice node railing machine, including railing machine body, set up on railing machine body and show module of fee of snapshot module and, snapshot module and show module of fee set up in the one side of railing machine body front end facing the lane transaction area, be provided with communication module in the railing machine body, this communication module is used for with ETC lane antenna carries out data interaction, and the transaction data of lane antenna is received through communication module and is shown through show module of fee of railing machine body, the lower extreme of pole machine body is provided with base, and the fixed part of base and setting in the bottom of railing machine body is connected in sliding fit, and the bottom of base is the sliding fit connection of sliding slot and sliding rail, the utility model relates to a kind of high -speed toll station vice node railing machine, solve the problem that multiple stand, construction complex caused by traditional ETC lane snapshot and fee show device independent setting, railing machine is simultaneously realized convenient installation and position adjustment by sliding base.
Owner:GUIZHOU QIANCHENG HUITONG TECH DEV CO LTD

Fabricated decoration dry hanging system

ActiveCN222435746UReduce construction complexityreduce maintenanceCovering/liningsKeelClassical mechanics
The utility model relates to the technical field of constructional engineering installation, and particularly discloses an assembly type decoration dry hanging system which is characterized in that a connecting assembly is arranged between a vertical keel and a transverse keel and comprises a locking block and a plurality of connecting blocks located in the vertical keel and the transverse keel respectively, and the transverse keel is matched with the locking block in a limiting mode. The locking blocks are fixedly connected with the connecting blocks located in the vertical keels and the transverse keels correspondingly, so that the transverse keels and the vertical keels are fixedly connected, cutting machining and related welding processes are not needed in the whole installation process, the construction complexity can be greatly reduced, and the construction efficiency is improved. And the transverse keels and the vertical keels are mutually fixed through the connecting assemblies to form the whole steel frame supporting structure, so that the later maintenance and rectification difficulty can be greatly reduced.
Owner:GUANGZHOU BAINA DIGITAL CONSTR TECH CO LTD

Connecting structure of unitized curtain wall and heavy steel structure

ActiveCN224395855UGuaranteed StrengthReduce the risk of connection failureWallsArchitectural engineeringUltimate tensile strength
The utility model belongs to building curtain wall engineering technical field discloses the connecting structure of unit formula enclosure curtain wall and heavy steel structure, including telescopic crossbeam, the telescopic crossbeam includes main crossbeam and vice crossbeam, the main crossbeam is set up with the movable slot in, be provided with telescopic adjusting mechanism in the movable slot, telescopic adjusting mechanism is connected with vice crossbeam, telescopic adjusting mechanism is used for adjusting the position of vice crossbeam. The main crossbeam and vice crossbeam in telescopic crossbeam rigid connection cooperation adjustable mechanism through telescopic adjusting mechanism, both ensure the strength of overall structure, can also absorb part deformation stress, reduce the connection failure risk caused by temperature change or external force. In addition, through the cooperation of telescopic adjusting mechanism, the position of vice crossbeam can be adjusted according to actual demand, so that the unit formula curtain wall of different size is adapted, and the customization processing is reduced.
Owner:SHENZHEN SHENDIAO CONSTRUCTION ENGINEERING CO LTD

Intelligent integrated equipment based on steel structure installation

The invention relates to the technical field of steel structure installation, in particular to intelligent integrated equipment based on steel structure installation, which comprises a lifting cylinder, an intelligent system and a controller, the inner side wall of the lifting cylinder is in vertical sliding fit with a sliding block, and the top of the sliding block is fixedly connected with a supporting rod. The top of the supporting rod penetrates through the top of the lifting cylinder and is in vertical sliding fit with the top of the lifting cylinder. A tray assembly used for fixing the steel structure is arranged at the top of the supporting rod. The bottom of the lifting cylinder is fixedly connected with a driving vehicle body, and the inner bottom wall of the driving vehicle body is fixedly connected with a first driving part; driving wheels are symmetrically and rotationally connected to the side wall of the first driving vehicle body, and output shafts of the first driving parts are coaxially and fixedly connected with the driving wheels; a steering assembly used for steering the driving vehicle body is arranged on the side wall of the driving vehicle body. The whole equipment is conveyed to the specific position where the steel structure needs to be installed through the driving vehicle body, the design is flexible, the equipment can adapt to various complex terrains and construction environments, and tracks do not need to be laid in advance.
Owner:中交一航局西南工程有限公司

curtain wall midspan support

ActiveCN224412897Uoffset sizeoffset errorArchitectural engineeringCurtain wall
The utility model discloses a curtain wall across middle support relates to building outer dress technical field, and curtain wall across middle support includes board groove formula embedded part, fixed support and fixed hanger, and board groove formula embedded part part sets up in the concrete precast slab, and is outwardly extended with the mounting bolt, and the fixed support is connected in the mounting bolt and is locked through the nut, and the fixed hanger is connected in the side wall of fixed support, and the width direction interval of fixed hanger is equipped with first installation hole and second installation hole, and first installation hole is used to wear fixed bolt and connects fixed support, and second installation hole is used to wear fixed bolt and connects the installation stand, and the distance of fixed hanger relative to the concrete precast slab can be adjustable adjustment to adjust the position of installation stand.
Owner:SHENZHEN HUBEI LEXING REAL ESTATE DEVELOPMENT CO LTD +1

A precast concrete column and steel beam connection node with internal partition

ActiveCN111021553BPower transmission is clearImprove collaboration performanceBuilding constructionsArchitectural engineeringRebar
The invention discloses a connection node between a precast concrete column and a steel beam with an inner partition, comprising an outer steel sleeve fixed to the node area, the outer steel sleeve fixed to the corresponding position of the precast concrete column and the node area, an upper inner partition and a lower inner partition both arranged in the outer steel sleeve, the upper and lower inner partitions are welded to the inner side wall of the outer steel sleeve at the corresponding position of the top and bottom of the steel beam and the node area, longitudinal reinforcement passing structure and concrete pouring holes are arranged on the upper inner partition and the lower inner partition, the outer steel sleeve and the steel cage of the precast concrete column are embedded in the concrete entity of the precast concrete column, the steel cage of the precast concrete column at the corresponding position of the outer steel sleeve is composed of longitudinal reinforcement, the outer side surface of the outer steel sleeve is flush with the outer side surface of the column, and a steel bracket connected to the steel beam is welded on the outer side surface corresponding to the outer steel sleeve and the steel beam. The invention has a simple structure and is easy to assemble; it has good mechanical properties, is safe and reliable; and has good integrity.
Owner:TIANJIN UNIV RES INST OF ARCHITECTRUAL DESIGN & URBAN PLANNING

Smart permission-identified automatic door wireless receiver, automatic door system and method thereof

The application discloses an automatic door wireless receiver of intelligent permission identification, an automatic door system and a method thereof. The automatic door wireless receiver comprises a wireless communication module, a receiver master control module and a host communication module. The automatic door wireless receiver can automatically identify the specific device type and the permission level of each external device, and acquire the current working state of the automatic door, so that the instructions of each external device are processed, and the opening or closing of the automatic door is controlled. The application can solve the communication compatibility problem of all external devices by using only one automatic door wireless receiver, reduces the number of wireless receivers, reduces the connection between the automatic door host and the wireless receiver, can eliminate the property safety hidden danger caused by the wrong port connection of the construction personnel, and greatly reduces the construction difficulty of the later-added external devices.
Owner:GUANGDONG LANSHUIHUA INTELLIGENT ELECTRONICS CO LTD

Portable adjustable wall hole protection device

The invention relates to the technical field of building construction, and particularly discloses a portable adjustable wall opening protection device which is used for sealing and protecting a wall opening and comprises a sealing plate, transverse abutting pieces arranged on the sealing plate and symmetrically arranged in the Y-axis direction, and vertical abutting pieces arranged on the sealing plate. The vertical abutting piece and the transverse abutting piece are in sliding fit with the closing plate. Through cooperative use of the transverse abutting piece and the vertical abutting piece, the whole device can be firmly attached to the edge of a hole, and closed protection of the wall hole is achieved; through sliding fit of the transverse abutting piece, the vertical abutting piece and the closing plate, adjustment can be conducted according to the actual size of a wall hole, operation is easy, and the construction complexity is reduced; the limiting plates are arranged at the ends of the vertical abutting rods, so that the situation that the whole protection device falls into the hole due to external force damage is effectively prevented; compared with the prior art, the wall cannot be damaged, and the later maintenance cost is reduced.
Owner:CHINA MCC5 GROUP CORP LTD

Construction method of science and technology tree structure

InactiveCN119041574ASimple processReduce construction complexityBuilding roofsTowersArchitectural engineeringCantilever
The invention discloses a technical tree structure construction method. The technical tree structure construction method comprises the following steps that S1, all embedded parts of an embedded section are installed; s2, steel beams in all the sections of the facade latticed shell structure and the corresponding sections are installed; s3, a top reticulated shell roof structure is installed, specifically, a roof is divided into a plurality of unit blocks and inlaying sections, and the unit blocks and the inlaying sections are symmetrically installed from the center to the periphery; s4, mounting a cantilever beam, namely mounting the cantilever beam from one side close to the floor, firstly mounting the cantilever beam close to the main structure of the science and technology tree, and finally mounting a boundary beam; and S5, after construction of the roof film structure is completed and water is cut off, construction of fireproof coating, putty and finish paint of the science and technology tree steel structure is conducted through a scaffold. According to the technical tree structure construction method, the technology is simple, construction personnel only need to conduct repeated construction on all the sections, the construction complexity is reduced, the possibility of errors in the construction process is reduced, and the construction efficiency is improved.
Owner:CHINA MCC5 GROUP CORP LTD

Non-bonded prestressed structure for vertical pile board wall

The utility model relates to the technical field of pile -board wall, disclose a kind of pile -board wall vertical unbonded prestressed structure, including soil block, the inner bottom surface of soil block is provided with multiple piles, the inside of pile is provided with multiple prestressed mechanism, and the prestressed mechanism includes tensioning end positioning groove, fixed end positioning groove and unbonded steel bar, the inner wall of tensioning end positioning groove and fixed end positioning groove is all fixedly connected with bottom plate, the outer wall of bottom plate near pile one side is fixedly connected with multiple spiral rib, the inner wall of bottom plate near pile one side is provided with anchoring cross plate. In the utility model, the pre-embedded design of the prestressed steel bar of the pile -board wall simplifies the construction process, reduces the modification to the existing process, reduces the construction complexity, thereby speeds up the construction progress, and the application of unbonded steel bar makes the design and construction more flexible, can adapt to different geology and environmental conditions, and is more suitable for various engineering projects.
Owner:TIANGONG LIDE TECH DEV CO LTD

Keel structure

The invention discloses a keel structure, and belongs to the technical field of building decoration, the key points of the technical scheme are that the keel structure comprises a transverse keel, a vertical keel and a connecting piece, the width of the vertical keel is the same as that of the transverse keel, the vertical keel is in lap joint with the transverse keel, the outer side wall of the transverse keel and the outer side wall of the vertical keel are located on the same plane, and the connecting piece is connected with the transverse keel. The connecting pieces are inserted into the inner sides of the transverse keels and the inner sides of the vertical keels at the same time and fixed to the transverse keels and the vertical keels through screws correspondingly, so that the vertical keels and the transverse keels are fixed, and the effects that time and labor are saved, keel leveling is achieved, and cost is reduced are achieved.
Owner:TIANJIN QIN GONGFU ENTERPRISE MANAGEMENT CO LTD

A new photovoltaic system connecting support suitable for metal roofs

ActiveCN224678995Ushorten the installation cycleFast modular connectionPurlinMechanical engineering
The application discloses a novel photovoltaic system connecting support suitable for a metal roof, which comprises a first sub-support, a second sub-support and a first locking piece. The first sub-support is provided with a clamping edge on one side of the upper end and is formed into a shape matched with one side of a wave crest of a metal roof panel at the lower end; the second sub-support is horizontally extended with a mounting surface at the upper end for fixing a photovoltaic purlin, the mounting surface is provided with a clamping groove for embedding the clamping edge, and is formed into a shape matched with the other side of the wave crest at the lower end. The first locking piece is arranged through the side surfaces of the two sub-supports to connect the two sub-supports into an integrated body for clamping and fixing the wave crest of the metal roof panel, realizes non-perforation clamping and fixing, and completely eliminates the roof leakage risk caused by traditional drilling. Meanwhile, the nesting structure of the clamping edge and the clamping groove provides a pre-positioning function, simplifies the installation process, ensures that the load is directly transmitted to the main body of the metal roof, and thus improves the structural safety and waterproof reliability of the photovoltaic system.
Owner:ZHUHAI HUAFA NEW ENERGY INVESTMENT & DEV HLDG CO LTD

Fixture for controlling space between reserved steel bars of floor slab construction joint and thickness of protective layer

The invention discloses a clamp for controlling the space between reserved steel bars of a floor slab construction joint and the thickness of a protective layer. The clamp comprises a sliding assembly, a supporting cross beam and a bottom rod structure. The sliding assemblies are of free sliding structures, balls capable of rotating freely are arranged at the bottoms of the sliding assemblies, the top ends of the sliding assemblies are connected with the overturning rods and the rotating head assemblies, the rotating head assemblies are rotationally connected with the linkage rods, the bottoms of the linkage rods are fixedly connected with the telescopic assemblies, and the upper ends and the lower ends of the multiple telescopic assemblies are fixedly connected with the supporting cross beam. A plurality of protection layer control ends are mounted on the outer side of the supporting cross beam through sliding grooves and sliding heads, and the sliding heads are rotationally connected with the cross arms through connectors; the bottom rod structure is arranged below the sliding assembly, the sliding assembly is in sliding contact with the upper portion of the bottom rod structure through balls, a sliding rod of a T-shaped structure is fixed to the top end of the bottom rod structure, the sliding rod is sleeved with the sliding assembly, and a supporting plate and a contact plate are fixed to the bottom of the bottom rod structure through grooves.
Owner:BCEG CIVIL ENGINEERING CO LTD

A damping and anti-seismic device for a catenary

A vibration damping and seismic resistant device for overhead contact lines includes: a positioning plate, an upper plate, a lower plate, an embedded plate, two shaped pressure plates, and an elastomer. The positioning plate is positioned below the support column. The two shaped pressure plates are arranged face-to-face, forming a rectangular gap on their inner walls for installing the elastomer. The lateral ends of one shaped pressure plate are connected to the upper plate, and the lateral ends of the other shaped pressure plate are connected to the lower plate. The embedded plate is positioned above the foundation. After installation, the upper plate is connected to the support column and the lower plate is connected to the foundation using anchor bolts. This vibration damping and seismic resistant device has strong load-bearing capacity, vibration damping, and seismic resistance. It is safe, reliable, and has no axial tension, eliminating the possibility of busbar breakage or wire breakage, thus avoiding wire breakage caused by flexible pantographs, melting, softening at high temperatures, wire defects, and pantograph malfunctions.
Owner:CHINA RAILWAY FIRST SURVEY & DESIGN INST GRP +1

Modularized multi-direction connection parapet keel system

ActiveCN224134133UAchieve force flow separationMeet styling needsCovering/liningsKeelMechanical engineering
The utility model discloses a modular multidirectional connection parapet keel system, which comprises an original structural body, parapet L corner braces, upright keels and panels, the parapet L corner braces are connected with the original structural body and the upright keels in an anchoring manner, the cross section of each upright keel is of a bow-shaped opening structure, each upright keel comprises an integrally formed middle convex groove and side grooves, and the side grooves are structurally and symmetrically arranged on the two sides of each middle convex groove; keel fixing holes are formed in the middle convex grooves, keel external connection holes are formed in the side grooves, the panels are detachably connected with the keel external connection holes through panel external connection pieces, and the panel external connection pieces comprise external hanging pieces and / or flat insertion assemblies. By adopting the design of the L-shaped corner connectors and the adjusting oblong holes and combining with the configuration of the Z-shaped double corner connectors, the three-dimensional fine adjustment of the position of the keel is realized, the keel is adapted to the uneven surface of a building structure body, the arrangement accuracy of the keel is ensured, the opening direction of the keel is flexibly adapted through the single corner connector or the Z-shaped double corner connectors, and the construction complexity is reduced.
Owner:DECORATION CO LTD OF CHINA CONSTR 3RD ENG BUREAU

A stiff box beam-column connecting structure and a construction method thereof

PendingCN122504257ADoes not reduce cross-sectional areaGuaranteed integrity
This application discloses a stiffened box girder-column connection structure and its construction method, including a vertical box girder, a stiffened box girder, multiple transverse reinforcing bars, and vertical reinforcing bars. The vertical box girder includes a box-shaped steel column and corbels connecting the box-shaped steel column. Lap plates are provided on the box-shaped steel column, located around the perimeter of the corbels. Inserts are placed on the corbels near the lap plates, with the centerline of the inserts perpendicular to the lap plates. The ends of the stiffened box girder are welded to the corbels. Transverse reinforcing bars are arranged around the circumference of the stiffened box girder, with their ends lapped onto the lap plates on the box-shaped steel column. Each vertical reinforcing bar is arranged around the circumference of the box-shaped steel column, with its end inserted into a corresponding insert. The stiffened box girder-column connection structure provided by this application, where the ends of the transverse reinforcing bars lap onto the lap plates and the vertical reinforcing bars are inserted into inserts, eliminates the need for holes to penetrate the box-shaped column and box girder, does not weaken the cross-sectional area of ​​the steel structure, ensures the integrity and stability of the steel structure, and allows the steel structure to fully utilize its load-bearing capacity.
Owner:BEIJING URBAN CONSTR SIXTH GRP

Preparation and application method of a supramolecular fracturing fluid system with both percolation and oil displacement capabilities

PendingCN122563567Aincrease viscosityAddress defects with high injury rates
This invention relates to the field of oil and gas field fracturing technology, and discloses a supramolecular fracturing fluid system and application method with both percolation and oil displacement capabilities. Its components include 0.3%-0.8% by mass of a supramolecular hydrophobic associating polymer, 0.2%-0.5% of a nano-microcapsule oil displacement agent, 0.05%-0.1% of a pH adjuster, and 0.1%-0.3% of a co-solvent, with the balance being a base fluid. The supramolecular hydrophobic associating polymer forms a dynamic three-dimensional network through self-assembly of hydrophobic side chains. The nano-microcapsule oil displacement agent uses a biodegradable polymer as a wall material to embed surfactants, achieving controlled release triggered by the reservoir environment. This system requires no crosslinking agent, has low residue content to reduce reservoir damage, and combines low friction with strong proppant carrying capacity. The controlled release of the nano-microcapsule improves the utilization rate of the oil displacement agent, realizing integrated fracturing and percolation oil displacement, and is suitable for the fracturing needs of various low-permeability to tight reservoirs.
Owner:JIANGSU OCEAN UNIV

An installation device for overturning resistance reinforcement of single-column pier bridges

ActiveCN224431279UGuaranteed reset thrustavoid damageArchitectural engineeringScrew thread
This utility model relates to an installation device for reinforcing single-column pier bridges against overturning, belonging to the field of bridge reinforcement technology. The installation device includes: two semi-circular clamps aligned and fitted together; a reinforcement installation mechanism comprising a regular hexagonal mounting frame fixedly connected to one end of one of the semi-circular clamps; through the cooperation of a guide block, guide post, and the inclined surface of a guide groove, disassembly only requires inserting an internal hexagonal sleeve to automatically release the locking of the positioning strip on the flange nut, achieving rapid release of pre-tightening force without tools; this design avoids damage to the bolt threads; the spring is made of rubber, ensuring the reset thrust of the positioning strip while reducing the risk of metal fatigue; the entire reinforcement installation mechanism significantly reduces the construction complexity of high-altitude operations while ensuring anti-overturning performance.
Owner:QINGDAO FIRST MUNICIPAL ENG CO LTD

Earthwork digging and filling device for building construction

The invention discloses an earthwork digging and filling device for building construction, and relates to the technical field of earthwork digging and filling, the earthwork digging and filling device comprises an auxiliary supporting seat, a slitting assembly and a wrapping assembly, the bottom and the right part of the auxiliary supporting seat penetrate through each other, and the slitting assembly and the wrapping assembly are mounted on the upper right part and the lower left part of the auxiliary supporting seat respectively; a slitting hydraulic cylinder is fixed to the auxiliary supporting seat, a slitting cutter is fixed to the tail end of a piston rod of the slitting hydraulic cylinder, and the wrapping assembly comprises a wrapping hydraulic cylinder, a slotting tool, an automatic winding mechanism and a coiled material. Earthwork can be vertically and transversely cut by controlling the cutting assembly, the cut earthwork can be semi-wrapped by controlling the wrapping assembly, so that moving and transporting are facilitated, then the auxiliary supporting base is controlled to be lifted upwards, complete soil blocks can be formed, the original soil blocks can be backfilled to the original position during backfilling, and the backfilling efficiency is improved. Damage to target earthwork is reduced, it is guaranteed that the whole structure is complete, and therefore the requirement for tamping after backfilling is reduced.
Owner:SHANXIAN HUXI IND TECH RES INST (SHANDONG IND TECH RES INST HUXI BRANCH)

Rapid construction method suitable for upper half middle wall of super-large section tunnel

The invention discloses an upper half middle wall rapid construction method suitable for an extra-large section tunnel, and belongs to the technical field of tunnel construction.The method comprises the steps that firstly, a tunnel face is divided into an upper step, a middle step and a lower step, then the upper step, the middle step and the lower step are each divided into a left working face and a right working face, and the edge positions of the left working face and the right working face of the middle step are marked; the construction position of a wall face supporting pipe is determined; after the left pilot tunnel of the upper step is excavated to the preset length, a left end face groove is excavated in the end position, the shape of the left end face groove is consistent with that of the left working face of the middle step, the permanent support side of the excavated part is supported in time after excavation, and temporary vertical supports are constructed; according to the method, after construction of the left pilot tunnel and the right pilot tunnel of the upper step is finished, the left wall face supporting pipe and the right wall face supporting pipe are constructed correspondingly and can be used for supporting the edge position of the middle step, and when pilot tunnels on the two sides of the middle step are constructed, the stability of the pilot tunnel wall face of the middle step can be improved, and tunnel deformation and other problems caused by collapse can be prevented.
Owner:CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP THIRD ENG CO LTD +2

Penetrating type deep-layer post-grouting reserved pipeline structure of basement bottom plate

The basement bottom plate penetrating type deep layer post-grouting reserved pipeline structure comprises a basement bottom plate, a first grouting pipe and a second grouting pipe are arranged on the basement bottom plate in a penetrating mode, one end of the second grouting pipe communicates with the first grouting pipe, and the other end of the second grouting pipe communicates with the first grouting pipe. One end of the first grouting pipe is connected with the second grouting pipe, the other end of the second grouting pipe is located at a water collecting well, communicated with the outside and higher than the top face of the basement bottom plate, the first grouting pipe and the second grouting pipe are connected through a connector connecting piece, the second grouting pipe is filled with a gravel layer, and the first grouting pipe is filled with an asphalt factice layer. Different from a traditional single-section grouting pipe, the grouting pipe adopts the two-section assembly design, due to the segmented assembly mode, installation is more convenient, the construction difficulty is reduced, meanwhile, the overall stability is improved, the grouting pipe is firmer and more reliable, the construction efficiency of the grouting pipe is effectively improved, the construction complexity is reduced, and the construction cost is reduced. And the problem of water seepage of the bottom plate is effectively prevented.
Owner:SHEN ZHEN SHI JIN ZHONG JI TUAN GU FEN YOU XIAN GONG SI

Rapid pipeline opening aligning device

The utility model relates to the technical field of pipeline aligning equipment, in particular to a rapid pipeline aligning device which comprises a body and an inserting piece. The body comprises a bottom fixing bracket and wing plates fixed to the two sides of the bottom fixing bracket. The flange plate is provided with an inserting opening, the inserting opening is filled with the movable hole filling plate, the movable hole filling plate is installed on the flange plate through a hinge, the movable hole filling plate can be rapidly opened through the hinge, the inserting piece is inserted into the inserting opening, and rapid opening alignment of the pipeline is completed. According to the utility model, the body and the plug-in unit are combined to form a quick plug-in system, the pipeline with the pipe diameter of less than DN100 is sleeved in the body, and the pipeline with the pipe diameter of less than DN100 is quickly fixed and aligned by opening and inserting the plug-in unit through the movable hole filling plates and the hinges at different positions, so that the pipeline aligning work can be realized only through one-time operation, and the success rate is improved. The device is simple in structure, convenient to operate, easy to construct and high in executability, the construction efficiency is improved, and the construction complexity is reduced.
Owner:WANGDA GRP CO LTD