The invention discloses a three-phase load balance control method based on a charging
pile group, relates to the technical field of charging
pile group control, solves the problem that the original three-
phase control process is not accurate, and fully manifests the adaptability
advantage by flexibly adjusting the current supply of each phase according to the current requirements at different moments. When the current demand at the next moment is the same as that at the previous moment, the current stable power supply state is maintained, unnecessary operation is reduced, and equipment loss is reduced; when the current demand is increased, a method of gradually increasing the current and synchronously coordinating each phase is ingeniously adopted, three-
phase balance is orderly realized, each charging
pile can obtain stable and sufficient
electric power, the overall charging efficiency is improved, the
waiting time of a vehicle due to insufficient
electric power is shortened, and in the scene that the current demand is reduced, the current is controlled to be gradually reduced by reverse thinking; three-
phase balance is ensured in the whole process, and equipment
impact or
power grid fluctuation caused by sudden reduction of current is avoided.