Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

42results about How to "Overcome inconsistency" patented technology

Device and method for accurately controlling local temperature of aluminum profile hot extrusion die

The invention provides a device for accurately controlling the local temperature of an aluminum profile hot extrusion die. The device comprises a liquid nitrogen container, a low temperature control valve, a liquid nitrogen pipeline, a die cushion, the die and a temperature controller. The die is installed in the die cushion, the liquid nitrogen pipeline is connected between the liquid nitrogen container and the die cushion and used for delivering liquid nitrogen into the die cushion, and the low temperature control valve is arranged on the liquid nitrogen pipeline and controls the flow of theliquid nitrogen. A contact type thermocouple is arranged in the die, the contact type thermocouple is connected with the temperature controller through a compensating lead, and the temperature controller is electrically connected with the low temperature control valve and transmits a direct current electric control signal to the low temperature control valve. The invention further provides a method for accurately controlling the local temperature of the aluminum profile hot extrusion die. A feedback signal is provided for the low temperature liquid nitrogen control valve by directly measuringthe temperature of the die, so that the temperature of the die is accurately controlled, and the changing hysteresis quality and inconsistency of the high temperature of a profile and the temperatureof the die at an outlet of a pressing machine in the aluminum extrusion process are overcome.
Owner:浙江海亮新材料有限公司 +1

Clustering management method for improving availability of distributed multi-hop network

The invention discloses a clustering management method for improving the availability of a distributed multi-hop network, and mainly solves the problems of disordered networking and high control overhead of large-scale network nodes in the prior art. According to the implementation scheme, the method comprises the steps of cluster generation and cluster maintenance, and the cluster generation comprises the steps that firstly, nodes randomly participate in competition of cluster heads according to the electric quantity percentage of the nodes; secondly, selecting cluster head nodes in the network through a weight optimization principle; then, periodically broadcasting cluster domain information by the cluster head node and the in-cluster node which is already clustered so as to enable the out-cluster node to be clustered; the cluster maintenance steps are as follows: 1) cluster head nodes select standby cluster head nodes according to an optimal similarity principle, and master-slave cluster head node information synchronization is realized through a differential synchronization mode; and 2) detecting the survival condition of the cluster head node by the standby cluster head node,and performing a cluster head node function as required. The method improves the network performance, ensures the stability of the network, and can be used for hierarchical division and maintenance ofa large-scale network organization structure.
Owner:XIDIAN UNIV

Highly anti-clogging buried pressure compensation drip irrigation irrigator

InactiveCN107114215AGood pressure compensation performanceAvoid Suction CloggingClimate change adaptationWatering devicesFilter windowFastener
The invention relates to a highly anti-clogging buried pressure compensation drip irrigation irrigator. The irrigator comprises an inserted pressure compensation dropper adhered to the inner wall of a PE hose through hot melting. A narrow slit water outlet is formed in the PE hose; the inserted pressure compensation dropper comprises an upper cover piece, a lower shell and an elastic film; an upper cover piece cementing surface and an assembled clamping table are arranged on the front of the upper cover piece, and the back of the upper cover piece is a flat plane; a main flow channel and an effluent buffer chamber are formed in the upper cover piece cementing surface; a holed supporting boss is formed in the effluent buffer chamber; a supporting boss and a screening positioning table as well as a recessed area and a compensation chamber water sealing ring are arranged on the back of the upper cover piece; the compensation chamber water sealing ring and the elastic film form a compensation chamber; a compensation chamber water inlet, a limiting boss and an overflow tank are arranged on the compensation chamber; a gridded filter window and a dropper screening tank are arranged on the front of the lower shell, and a filter window water inlet and a lower shell cementing surface are formed in the back of the lower shell; a suck-back prevention water sealing ring and a film mounting tank for mounting the elastic film are arranged on the filter window water inlet; and a mounting positioning table and an assembling fastener are arranged on the back of the lower shell. The irrigator disclosed by the invention is excellent in pressure compensation and anti-clogging effects.
Owner:GANSU DAYU WATER SAVING +1

Vehicle height limit early warning method and system based on Internet of things, and vehicle

The invention provides a vehicle height limit early warning method based on the Internet of things. According to the vehicle driving height limit early warning method, height limit information of a first vehicle provided with a height limit detection device is collected, and a Internet-of-things server sends the height limit information of a corresponding road section to a second vehicle accordingto the vehicle information of the second vehicle, so that the height limit information is provided for the second vehicle passing through the same road section, and the second vehicle performs driving height limit early warning according to the height limit information, therefore, the height limit detection device does not need to be installed on the second vehicle, and the installation number ofthe height limit detection device is reduced. In addition, the height limit detection device is mounted right above the vehicle, so that the detection precision is greatly improved; the height limitinformation is obtained by detection and calculation in a real passing state of a height limit road section, therefore, the problem that the real road condition is not completely consistent with the marked height limit information is solved, the calculation of the height limit information is more real and accurate, the deviation between the measurement result and the actual traffic road conditionis reduced to the maximum extent, and the safety traffic efficiency of vehicles with the vehicle height near the height limit is improved.
Owner:王亚鹏

Third party registration failure processing method and device for IMS (IP Multimedia Subsystem)

The invention provides third party registration failure processing method and device for an IMS (IP Multimedia Subsystem). The method comprises the following steps of: receiving a user state subscription request transmitted by a subscribing party and establishing subscription conversation with the subscribing party when the third party registration failure of a user is obtained by inquiring; transmitting a cancellation notice request to the subscribing party; and canceling the user by the subscribing party according to the cancellation notice request. The method and the device ensure that a relevant network element establishes the subscription conversation with the subscribing party according to the normal subscription process when the third party registration of the user fails so as to transmit the cancellation notice request for indicating cancellation to the subscribing party, thereby effectively guaranteeing the consistency of user data among equipment and solving the problem of inconformity existing in the user data among the equipment caused by that the third party registration failure processing method in the relevant technology can not inform the subscribing party of canceling the user due to unavailable establishment of the subscription conversation by the third party registration failure of the user.
Owner:ZTE CORP

A Compensable Equilibrium Winding Hysteresis Tensioner Used in Textile Machinery

InactiveCN105151904BRealize automatic group control with external electromagnetic compensationKeep enclosed spaceFilament handlingHysteresisEngineering
The invention discloses a compensable balanced winding hysteresis tensioner for textile machinery, which is a compensable balanced winding magnetic hysteresis tensioner suitable for a variety of textile machinery when flexible materials are passively drawn and wound. Hysteresis tensioner. In the present invention, the length-to-diameter ratio of the helical permanent magnet steel and the hysteresis tube is ≥3, and the hysteresis torque is homogenized within the adjustment range with the large pitch of the multi-head screw, so that the non-linearity is improved and the tension adjustment range is expanded at the same time; the design of the helical permanent magnet The steel has an even number of turns, and the circumferential angles of N poles and S poles alternating between the two turns are offset by half a bit, which balances the gap between the hysteresis force of N poles and S poles and improves the fluctuation of tension pulse vibration; the design has a built-in automatic The excitation induction coil, compensation coil and automatic compensation closed-loop group control system can not only compensate for time aging, but also eliminate consistency differences; single control and group control can be used for dual purposes to avoid scrapping. Because the textile machine tensioner has a wide range of applications and a large number, the present invention is easy to popularize and has good benefits.
Owner:TAIYUAN UNIV OF TECH

Third party registration failure processing method and device for IMS (IP Multimedia Subsystem)

The invention provides third party registration failure processing method and device for an IMS (IP Multimedia Subsystem). The method comprises the following steps of: receiving a user state subscription request transmitted by a subscribing party and establishing subscription conversation with the subscribing party when the third party registration failure of a user is obtained by inquiring; transmitting a cancellation notice request to the subscribing party; and canceling the user by the subscribing party according to the cancellation notice request. The method and the device ensure that a relevant network element establishes the subscription conversation with the subscribing party according to the normal subscription process when the third party registration of the user fails so as to transmit the cancellation notice request for indicating cancellation to the subscribing party, thereby effectively guaranteeing the consistency of user data among equipment and solving the problem of inconformity existing in the user data among the equipment caused by that the third party registration failure processing method in the relevant technology can not inform the subscribing party of canceling the user due to unavailable establishment of the subscription conversation by the third party registration failure of the user.
Owner:ZTE CORP

Single-seismic source directional lighting seismic signal synthesizing method

The invention relates to a geophysical surveying method, in particular to a directional lighting seismic signal synthetic method which is based on a single seismic source in the seismic prospecting. Equidistant shotpoints with the odd number of more than one to n are designed on a surveying line; at the same time, equidistant track space demodulator probes with the number of more than one to N are arranged on the surveying line; the single shot seismic data of the shotpoint 1 are obtained through a controlled seismic source, the single shot seismic data of the shotpoint 2 are obtained by moving the shotpoints, the single shot seismic data of the shotpoint 3 are obtained by moving the shotpoints, and then the single shot seismic data of the shotpoints with the number of n are obtained by analogy; the single shot seismic data are made linear superposition after being delayed, and are synthesized into the directional lighting seismic signals with directivity, which correspond to a positioning seismic wave field. By comparing the directional lighting seismic signal synthetic method which is based on a single epicenter with the phase control seismic signals, the noise-signal ratio of the signals is improved, the needed number of seismic sources is few, the working cost is low, the operation is simple, and the problem of the inconsistency of a plurality of shock devices is overcome.
Owner:JILIN UNIV

Plating method of aluminum matrix composite electronic packaging shell

The invention discloses a plating method of an aluminum matrix composite electronic packaging shell. The method comprises the following steps: activating for the first time, chemical plating of nickeland phosphorus, activating for the second time, chemical plating of nickel and boron, electroplating of nickel and electroplating of gold. By means of the plating method, a composite plating layer structure of a first palladium atom activation layer, a nickel-phosphorus chemical nickel plating layer, a second palladium atom activation layer, a nickel-boron chemical nickel plating layer, a nickelelectroplating layer and a gold electroplating layer can be sequentially formed on the outer side of the aluminum matrix composite electronic packaging shell, wherein the two palladium atom activationlayers and the multiple composite nickel plating layers form compact middle transition plating layers for effective filling and covering effects on a microporous aluminum matrix composite, the plating layers are compact, and the outermost layer is plated with the high-purity gold electroplating layer, so that the salt spray resistance is fully improved, the composite plating layer can effectivelyovercome the defect of inconsistency of the surface of the aluminum matrix composite, and the 48-hour salt spray resistance requirement is completely met.
Owner:NO 43 INST OF CHINA ELECTRONICS TECH GRP CETC
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products