The invention relates to a
gypsum heat preservation painting
mortar construction process which comprises the steps that firstly, a base-layer wall is processed; secondly, according to the smoothness and perpendicularity of the surface of the base-layer wall, one wall is used as the datum, and a perpendicular square-setting elastic
control line is hoisted; thirdly,
gypsum bases are painted with
mortar and used as angle beads; fourthly, the
gypsum bases are painted with
mortar and used as ash cakes and
punching ribs; fifthly, gypsum heat preservation painting mortar is sprayed; sixthly, the gypsum heat preservation painting mortar is flattened and compacted, wherein the step of hanging nets on the junctions of different materials is further included between the second step and the third step; in the fourth step, after the ash cakes are manufactured and hardened, distribution cakes are manufactured and arranged through flax threads by controlling the ash cakes, so that the horizontal spacing between all the distribution cakes is not larger than 1500 mm; the steps of rib
grinding and rib alignment are further included between the fourth step and the fifth step. Compared with the prior art, the gypsum heat preservation painting mortar construction process has the advantages that construction is convenient, plastering, scraping and repair are easy, the labor intensity is low,
material consumption is lowered, the construction period is shortened, and construction cost is saved.