The utility model discloses a mould hoisting structure for a permanent
magnet jack, which comprises a cross beam and a mould to be transported, and further comprises a hoisting reinforcing mechanism, the hoisting reinforcing mechanism comprises a second electric telescopic rod arranged on the cross beam, the fixed end of the second electric telescopic rod is provided with a connecting rod, and the fixed end of the second electric telescopic rod is provided with a clamping groove; the other end of the connecting rod is connected with a permanent
magnet lifting module, an air bellow is arranged at the end, away from the connecting rod, of the fixed end of the second electric telescopic rod, and the air bellow and the permanent
magnet lifting module act together. And the auxiliary protection mechanisms are arranged on the outer walls of the two sides of the cross beam. The mold hoisting structure for the permanent magnet jack has the technical effects that the
adsorption effect is improved, magnetic force borne by all parts of an object to be transported is uniform, firm adsorption and safe hoisting are ensured, and meanwhile, local deformation or damage of a mold to be transported caused by uneven stress is also avoided.