Pondage usually refers to the comparably small water storage behind the weir of a run-of-the-river hydroelectric power plant. Such a power plant has considerably less storage than the reservoirs of large dams and conventional hydroelectric stations which can store water for long periods such as a dry season or year. With pondage, water is usually stored during periods of low electricity demand and hours when the power plant is inactive, enabling its use as a peaking power plant in dry seasons and a base load power plant during wet seasons. Ample pondage allows a power plant meet hourly load fluctuations for a period of a week or more.

Ecological-power generation dynamic mutual feedback regulation method for cascade reservoir group

The invention discloses an ecological-power generation dynamic mutual feedback regulation method for a cascade reservoir group. The method comprises: a generating capacity and an ecological assurancerate are used as objective functions of an ecological-power generation mutual feedback regulation model of a cascade reservoir group, wherein a constraint set of the ecological-power generation mutualfeedback regulation model of the cascade reservoir group includes a water balance equation, an inflow flow balance equation, an outflow flow balance equation, a water storage limit constraint, a power generation flow constraint, an outbound flow constraint and a power station output constraint and the ecological assurance rate is obtained by meeting a space-time proportion of four ecological standards including a water quality demand, a cutoff water demand, a sand flushing water demand, and an ecological water demand by a water flow condition; and on the basis of an improved non-domination sorting genetic algorithm, optimal outflow floes of all reservoirs at all periods are obtained from the ecological-power generation mutual feedback regulation model of the cascade reservoir group. According to the invention, the generating capacity and the ecological assurance rate are used as objective functions; and the influence on the ecological environment is reduced while the maximum reservoirpower generation amount is ensured.
Owner:HUAZHONG UNIV OF SCI & TECH

Reservoir scheduling early warning method based on meteorological numerical forecasting

ActiveCN110991688AImprove dispatching risk early warning capabilitiesReduce flood riskClimate change adaptationForecastingHydrometryDrainage basin
The invention discloses a reservoir scheduling early warning method based on meteorological numerical forecasting, which comprises the following steps: calculating the interceptable water storage capacity in a basin according to the acquired hydrological information of each hydropower station in the basin of a target reservoir, and correcting the early-stage influence rainfall Pa according to theinterceptable water storage capacity; determining a runoff coefficient rho according to the hydrological information and the meteorological information, calculating the capacity storage purified wateramount and the capacity storage precipitation amount of the reservoir based on the runoff coefficient rho, and carrying out capacity storage precipitation amount early warning; according to the hydrological information, the drainage basin information, the early-stage influence rainfall Pa, the runoff coefficient rho and the meteorological information, short-term period runoff prediction of the reservoir is conducted, and the medium-term and long-term end water level is calculated; and determining a flood prevention early warning level and a drought resistance early warning level according tothe hydrological information, the meteorological information and the end-of-period water level information, and performing reservoir scheduling. The reservoir scheduling early warning method has the advantages that the reservoir scheduling risk early warning capacity is improved, and life and property safety of reservoir dams and downstream people is ensured.
Owner:STATE GRID ZHEJIANG ELECTRIC POWER

Reverse downstream waterpower automatic gate

The invention belongs to the technical field of drainage system equipment, and specifically relates to a reverse downstream waterpower automatic gate. The reverse downstream waterpower automatic gate comprises a buffering pool arranged inside a flow passage, a pondage regulating pool arranged at the downstream of the buffering pool, and a gate arranged between the buffering pool and the pondage regulating pool. The edges on bilateral sides of the gate and the edge at the bottom of the gate are respectively in hermetic fit with flow passage walls on bilateral sides of the flow passage. The gate is fixed on one side of a spindle. Two ends of the spindle are respectively hinged with the flow passage walls on bilateral sides of the flow passage. The reverse downstream waterpower automatic gate further comprises a floating chamber arranged inside the flow passage. The top of a lateral wall of the floating chamber facing to one side of the pondage regulating pool is provided with a water inlet communicated with the pondage regulating pool. The other side of the spindle is fixedly connected with a floating box which is arranged inside the floating chamber. The bottom of a lateral wall of the floating chamber is provided with a water outlet which is communicated with the flow passage. The gate can be opened with the help of the gravity of the floating box, without an external power or a control measure, thereby allowing the water in the buffering pool to be drained when the water level of the underground pondage regulating pool is low, accordingly achieving the flood discharge timely, and closing the gate when the water level is high.
Owner:WUHAN SHENGYU DRAINING SYST

Riverway diversion plugging device for hydraulic engineering and using method thereof

The invention relates to municipal engineering, and particularly relates to a riverway diversion plugging device for hydraulic engineering and a using method thereof. A base is arranged on a riverbed,a plurality of supporting seats are arranged on the base, a liftable dam body is mounted through the supporting seats, the dam body ascends and descends, adjustment is carried out according to the water level requirement, so that the water storage amount is controlled, the dam body is supported through a dam body supporting device after being lifted, a gap is formed between the riverbed and the lower end of the dam body, due to the action of the dam body, the water level rises, and the water flow pressure intensity of the lower portion of the dam body is increased, the water flow speed is increased, the good desilting effect can be achieved, the bottom of the dam body and the riverbed are not fixed, taking-out and maintenance are convenient, the dam comprises a supporting pipe, a fillingcore is arranged in the supporting pipe, the difference value between buoyancy and gravity can be controlled by controlling the weight of the filling core, then the stability of the dam body is controlled, a corrosion-resistant layer and a waterproof layer are arranged, the good waterproof and corrosion-resistant effects are achieved, and the service life is long.
Owner:河南永坤水利建筑工程有限公司

Hydroelectric generation device capable of being adjusted according to precipitation amount

The invention discloses a hydroelectric generation device capable of being adjusted according to precipitation amount. The hydroelectric generation device comprises a box body, wherein an opening mechanism is arranged on the top wall of the box body; a right water falling groove with an upward opening is formed in the top wall of the right end of the box body; a first inclined groove with a leftward opening is fixedly formed in the left end wall of the right water falling groove; the left end wall and the right end wall of the first inclined groove are fixedly connected with inclined pipes which are symmetrically arranged left and right; a flow dividing mechanism is arranged at the first inclined groove; the ends, away from the first inclined groove, of the inclined pipes are fixedly connected with water storage rings; water pouring mechanisms are symmetrically arranged at the front ends of the left water storage ring and the right water storage ring left and right; a left water falling groove with a downward opening is formed in the left end wall of the first inclined groove; the left end wall of the left water storage ring is fixedly connected with the left water falling groove;power generation mechanisms are symmetrically arranged on the lower sides of the left water storage ring and the right water storage ring left and right; and water storage mechanisms are arranged on the bottom walls of the right water falling groove and the left water falling groove. Accumulated water can be started during rainfall, water is discharged for power generation when a certain water storage amount is reached, the flow dividing power generation mechanisms can be started when the precipitation amount is too large, and device damage caused by too large precipitation amount is prevented.
Owner:GUANGXI PINGBAN HYDROPOWER DEV CO LTD

Pumped storage power station and new energy power generation combined optimal scheduling method and device

PendingCN113872253ARealize the collection and transmission of power generationMeet the requirements of peak shaving operationGeneration forecast in ac networkElectrical storage systemWater storagePower station
The invention provides a pumped storage power station and new energy power generation combined optimal scheduling method and device, and belongs to the technical field of power grid and energy storage system scheduling. The method comprises the steps that a pumped storage power station and new energy stations connected with the pumped storage power station serve as a combined system, and a new energy station day-ahead generated power relative prediction error scene set is established; under the scene set, a combined system pre-scheduling model containing pumped storage power stations and new energy power generation is established and solved, and the start-stop state of each pumped storage unit at each moment in the next day and the water storage of upper and lower reservoirs at each moment in the next day in each scene are obtained; and iterative optimization is conducted on the water storage of the upper and lower reservoirs to obtain an optimal scheduling scheme for combined power generation of the pumped storage power station and the new energy stations. According to the invention, an optimal solution method is provided for solving the problem that the water head change generates nonlinear influence on the power and the flow during the scheduling of the pumped storage power station, and a more accurate pumped storage power station and new energy power generation combined optimal scheduling scheme can be obtained.
Owner:STATE GRID XINYUAN +1

Novel electrically controlled water supply system

ActiveCN107386357AAutomaticRegulating water storage capacityWater supply tanksWater conservationWater useWater storage
The invention provides a novel electrically controlled water supply system. The system comprises a water tower, a water inlet pipeline and a water supply pipeline, wherein the water inlet pipeline is communicated with a water pump, and the water supply pipeline is provided with a water discharging valve. The system is characterized by comprising a water level regulating rod and a conductive sleeve cylinder arranged on the water level regulating rod in a sleeving mode, the conductive sleeve cylinder and the water level regulating rod are connected with the water pump in series through wires, a float ball is fixed to the bottom end of the water level regulating rod, and the conductive sleeve cylinder is fixed to the bottom end of a spiral lifting rod through an insulation connecting rod. Compared with the prior art, the novel electrically controlled water supply system has the advantages that a water pumping circuit is automatic, when the water level in the water tower drops, the water pump can automatically pump water to the water tower, and when water in the water tower is stored enough, the water pump automatically stops pumping; an appropriate water storage amount can be set based on the water consumption condition of people in different months, so that the situations that insufficient water storage of the water tower does not satisfy water use demands, and excessive water storage results in too long water storage updating time and influences the water quality are avoided.
Owner:NORTH CHINA UNIV OF WATER RESOURCES & ELECTRIC POWER

Secondary water supply optimization method and device for reducing pressure of municipal pipe network

The invention discloses a secondary water supply optimization method for reducing municipal pipe network pressure, which comprises the following steps: S1, collecting historical water supply data, and calculating to obtain a daily water consumption reference curve and a water consumption peak time period; s2, taking the time that the starting time of the water consumption peak period is advanced by a certain advance time amount as the preposed time, and fully storing the water tank in advance from the preposed time; and S3, carrying out peak shifting water inflow stabilizing operation according to the actual water storage amount of the water tank in the water consumption peak period. The invention further discloses a device which comprises a control center, a regulating valve, a flow meter and a liquid level meter. According to the method, a daily water reference curve and daily average water flow are calculated according to historical water supply data, average water replenishing flow is calculated on the basis of the daily average water flow, a water tank is fully filled with the average water replenishing flow in advance before the peak water consumption period, and peak shifting water inflow stabilizing operation is carried out by fully utilizing the adjustable water storage volume of the water tank in the peak water consumption period; therefore, the pressure of a water pipe network during the peak period of water consumption is reduced, water pressure and water flow velocity fluctuation in the pipe network are reduced, and energy consumption is saved.
Owner:沣泰水务科技(杭州)有限公司

Urban water supply dynamic prediction, early warning and analysis method

PendingCN113159422ARealize the two-way linkage of the whole networkForecastingUrban water supplyWater source
An urban water supply dynamic prediction, early warning and analysis method is characterized by comprising the following steps of: S10, constructing supply and demand early warning models between a plurality of reservoirs and a plurality of water supply plants according to the water supply scale, the water supply reservoirs, the water supply rules and the water diversion rule information of each water supply plant; S20: according to the real-time water storage of each reservoir, calculating the water storage of the plurality of reservoirs day by day in a rolling manner by combining the water inflow, the water diversion quantity, the water abandoning quantity, the water supply quantity of the water plant and the ecological water consumption of the reservoirs; S30, outputting the predicted water supply days of the reservoir/water plant according to the supply and demand early warning model, and performing early warning; and S40, outputting the reservoir water storage capacity of the reservoir in the future time according to the supply and demand early warning model. In the application, a traditional reservoir-water plant single-line analysis mode is changed, N-N relation network construction is performed on all water sources (reservoirs and rivers), diversion projects and water supply plants in a certain area, and full-network bidirectional linkage analysis of water resource supply and demand early warning is realized.
Owner:宁波弘泰水利信息科技有限公司

A water storage system using support pipe piles and its construction method

The invention discloses a water storage system using supporting pipe piles and a construction method thereof. The water storage system includes a water storage well, a water pump arranged in the water storage well, and a pipe pile poured on the top of the pipe pile. The crown beam, the pre-embedded pipe and siphon corresponding to each pipe pile, the pipe pile is the support pipe pile used in the enclosure structure, a part of the pre-embedded pipe is buried in the crown beam, the pre-embedded One end of the buried pipe is connected to the rainwater pipe network, and the other end extends from the end of the pipe pile into the hollow cavity of the pipe pile. The siphon pipe includes several water inlet branches and a main pipe connected to each water inlet branch pipe. The water inlet branch pipe Extending into the corresponding hollow cavity, the main pipe has a water outlet extending into the bottom of the water storage well, and the height of the water outlet is lower than the water inlet of each water inlet branch pipe. The invention utilizes the pipe piles to increase the water storage capacity, and can automatically concentrate the water in the pipe piles into the water storage wells, which is energy-saving and environment-friendly.
Owner:CHINA RAILWAY TIMES BUILDING DESIGIN INST CO LTD

Reservoir Operation and Early Warning Method Based on Meteorological Numerical Forecast

ActiveCN110991688BReduce flood riskImprove dispatching risk early warning capabilitiesClimate change adaptationForecastingHydrometryFlood control
The invention discloses a reservoir dispatching and early warning method based on meteorological numerical forecast, which calculates the amount of water that can be stored in the watershed according to the collected hydrological information of each hydropower station in the watershed of the target reservoir, and corrects the pre-influenced rainfall Pa according to the amount of water that can be stored; The runoff coefficient ρ is determined based on the runoff coefficient ρ, and the reservoir can store clean water and precipitation based on the runoff coefficient ρ, and carry out early warning of the stored precipitation; according to hydrological information, river basin information, previous impact rainfall Pa, runoff coefficient The information is used to forecast the short-term runoff of the reservoir and calculate the end-of-term water level in the medium and long term; determine the flood control and drought warning levels according to the hydrological information, meteorological information and end-of-period water level information, and carry out reservoir scheduling. The invention has the following beneficial effects: the risk early warning ability of reservoir dispatching is improved, and the safety of life and property of people in the dam of the reservoir and downstream is ensured.
Owner:STATE GRID ZHEJIANG ELECTRIC POWER

A cascade reservoir group ecology-power generation dynamic mutual feedback control method

The invention discloses an ecological-power generation dynamic mutual feedback regulation method for a cascade reservoir group. The method comprises: a generating capacity and an ecological assurancerate are used as objective functions of an ecological-power generation mutual feedback regulation model of a cascade reservoir group, wherein a constraint set of the ecological-power generation mutualfeedback regulation model of the cascade reservoir group includes a water balance equation, an inflow flow balance equation, an outflow flow balance equation, a water storage limit constraint, a power generation flow constraint, an outbound flow constraint and a power station output constraint and the ecological assurance rate is obtained by meeting a space-time proportion of four ecological standards including a water quality demand, a cutoff water demand, a sand flushing water demand, and an ecological water demand by a water flow condition; and on the basis of an improved non-domination sorting genetic algorithm, optimal outflow floes of all reservoirs at all periods are obtained from the ecological-power generation mutual feedback regulation model of the cascade reservoir group. According to the invention, the generating capacity and the ecological assurance rate are used as objective functions; and the influence on the ecological environment is reduced while the maximum reservoirpower generation amount is ensured.
Owner:HUAZHONG UNIV OF SCI & TECH

Hazardous chemical leakage monitoring and emergency treatment system for sensitive water body bridge section

The invention relates to a hazardous chemical leakage monitoring and emergency treatment system for a sensitive water body bridge section. The system mainly comprises a hazardous chemical leakage emergency monitoring system, a bridge surface runoff collection system, a hazardous chemical emergency storage system and a bridge surface runoff treatment system. When a traffic accident does not happenon the bridge section, bridge surface runoff initial rainwater enters a collection pipeline system, and directly flows into the bridge surface runoff treatment system for purification treatment afterpassing through a runoff electric butterfly valve switch of an emergency regulating pondage, and 30 minutes later, the bridge surface runoff is directly discharged through an overflow port of the emergency regulating pondage. When the traffic accident happens on the bridge section, firstly, the traffic accident is discovered through a bridgehead monitoring camera and an alarm telephone, and whether hazardous material leakage exists is determined; secondly, an emergency control system is started by a monitoring center, and the emergency electric butterfly valve switch in the runoff regulating pondage is turned on; and finally, the leaked hazardous material and a diluent thereof enter the regulating pondage through a collection pipeline and then directly flow into an emergency storage pool.
Owner:CHINA ACAD OF TRANSPORTATION SCI

Automatic optimization power generation control system based on water level change rate

The invention discloses an automatic optimization power generation control system based on a water level change rate. The system reads the real-time data from a monitoring system, carries out calculation and analysis, carries out the condition judgment at regular time, and transmits the control operations, such as starting, stopping, load adjustment, etc., to the monitoring system, and the monitoring system issues the control operations to an in-situ control unit LCU for unit power generation control. The load adjustment control is conducted according to a water balance principle that the difference of the reservoir-in water quantity and the reservoir-out water quantity is equal to change of the water storage quantity of a reservoir, if the water level rises, it shows that the reservoir-out water quantity is smaller than the reservoir-in water quantity, and under the condition that a water head is normal, load can be increased properly; if the water level drops, it shows that the output water volume is larger than the input water volume, and when the water level is smaller than a limit value, the load can be reduced according to the water level dropping rate, and according to the principle, the hour change rate of the water level is calculated under the current load condition. The automatic optimization power generation control system of the invention provides a powerful guarantee for realizing the unattended operation and few-person on-duty operation of a hydropower station.
Owner:湖南江河能源科技股份有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products