The invention provides a ventilation network pressure
energy diagram drawing method for reducing
branch intersection based on
minimum spanning tree sorting. The ventilation network pressure
energy diagram drawing method comprises the following steps: 1, layering nodes by utilizing node pressure energy values; layering the network graph by utilizing the longest path of the node to obtain a layeredgraph, enabling
branch air flow in the layered graph to flow from bottom to top, and then constructing a pressure energy layer by utilizing node pressure energy to carry out secondary layering on thenode; and 2, sorting the nodes by utilizing
minimum spanning tree sorting; for the hierarchical graph, finding a
minimum spanning tree by taking the reciprocal of the
air volume as a weight, constructing a
tree structure to ensure that no intersection exists among branches, scanning the hierarchical graph from bottom to top, and trying to exchange each layer of nodes to reduce the intersection between the branches and remaining branches; and 3, drawing a pressure
energy diagram of the ventilation network by using an
orbit method; for nodes in a hierarchical graph, performing connection drawingwith right-angle broken lines according to a topological relation, and designing an
orbit method to avoid overlapping between branches. The mine ventilation network diagram and the mine pressure energy diagram can be combined, and the practical application value is achieved.