Construction site arrangement optimization method and system, readable storage medium and electronic equipment

The invention provides a construction site arrangement optimization method and system, a readable storage medium and electronic equipment, and the method comprises the steps: obtaining the oblique photogrammetry data of a target construction site, and constructing a live-action three-dimensional model corresponding to the target construction site according to the oblique photogrammetry data; obtaining a construction drawing of the target construction site, and constructing a building information model according to the construction drawing; fusing the live-action three-dimensional model with the building information model to obtain an initial site arrangement scheme corresponding to the target construction site; optimization indexes are defined, an objective function corresponding to the preliminary arrangement scheme is constructed based on the optimization indexes, and the optimization indexes comprise construction transportation cost and safety risks; and solving the objective function, and obtaining a final site layout scheme according to a solving result. The construction site arrangement optimization method provided by the invention has the advantages of high measurement precision, high arrangement efficiency and good arrangement scheme effect.
Owner:STATE GRID BEIJING ELECTRIC POWER CO +2

Linear engineering rapid plotting method and system

The invention discloses a rapid drawing method for linear engineering. The method comprises a data input module, a data processing module, a result generation module and a result export module. The invention relates to the technical field of CAD, in particular to a drawing method of linear engineering. And the line plane is simplified by connecting the linear engineering pile number coordinates in sequence. The stake number contained in each drawing is determined through a layout viewport and a proportional scale, the corresponding rotation angle and geometric center are calculated, and the linear engineering is located at the center position of the drawing. The method is accurate and efficient, and can be applied to linear projects such as railways and urban rail transit.
Owner:CHINA SHIPPING ENVIRONMENT SCI & TECH (SHANGHAI) CO LTD +1

Tunnel outburst prevention rock mass crack extension continuous monitoring method based on micro-seismic infield positioning

The invention discloses a tunnel outburst prevention rock mass fracture extension continuous monitoring method based on micro-seismic infield positioning, which comprises the following steps: S1, according to the distance L between a disaster-causing structure and a tunnel face, drilling an advanced drill hole in the tunnel face, acquiring lithology and water inflow information of surrounding rock, and preliminarily determining an outburst prevention rock mass hydraulic communication area range; s2, micro-seismic sensors are arranged on the arch crown, the left wall foot and the right wall foot within the range of L / 2-2 m to L / 2 + 2 m in front of the tunnel face in the drilled advance drill hole correspondingly; s3, recording seismic source microseismic signal frequency, duration and waveform of explosive blasting, mechanical vibration and vehicle traveling, and screening microseismic signals of crack extension in the rock mass; s4, performing rock mass internal fracture extension seismic source positioning by adopting a simplex method; and S5, drawing a micro-seismic event three-dimensional model, and determining the expansion and evolution characteristics and range of the fractures in the hydraulic communication area. According to the invention, the monitoring continuity of the outburst prevention rock mass fracture evolution process of the tunnel and the positioning precision of the water inrush channel can be improved.
Owner:SOUTHWEST JIAOTONG UNIV +2

Network layout method and system of distributed photovoltaic power station

The invention relates to a network layout method and system for a distributed photovoltaic power station, and the method comprises the steps: firstly screening out alternative places based on sunlight and solar radiation, considering the influence of climate on the performance, and determining places suitable for climate conditions; evaluating the current land utilization situation, and determining a land parcel suitable for photovoltaic construction; then analyzing the landform, and planning equipment installation; determining power station installation data according to the installation demand in combination with land conditions; then, the admission ability is evaluated, the installed capacity is adjusted, and the access point is confirmed; similar power stations are divided into clusters for coordination; and finally planning a power transmission line to complete layout. According to the method, objective environmental conditions are collected and analyzed and combined with actual requirements, the layout mode is finally screened and confirmed, manual intervention is reduced in the process to improve efficiency, meanwhile, the layout mode of the photovoltaic module is optimized through site selection and positioning, factors such as shadow, sunlight, land and installation are fully considered, maximum energy collection is achieved, and the energy utilization rate is increased. And the requirements during layout construction are comprehensively considered.
Owner:ECONOMIC & TECH RES INST OF HUBEI ELECTRIC POWER COMPANY SGCC +3

Tower crane optimization method, system and equipment based on BIM (Building Information Modeling) and genetic algorithm and storage medium

The invention discloses a BIM (Building Information Modeling) and genetic algorithm-based tower crane optimization method, system and equipment and a storage medium, and the method comprises the following processes: selecting a tower crane model according to a construction environment and requirements; carrying out BIM modeling on the construction site to obtain a BIM model, and determining the position range of the tower crane; based on the construction site data and the tower crane model in the BIM model, establishing a tower crane mathematical model, and establishing a target function with minimum construction time and cost as a target; and solving the target function by adopting a genetic algorithm to obtain an optimal tower crane arrangement position. The optimization efficiency is improved, the collision risk is avoided, the cost is reduced, and the safety is improved.
Owner:STATE GRID BEIJING ELECTRIC POWER CO +1

Back contact battery string typesetting device and string type switching method

The invention discloses a back contact battery string typesetting device and a string type switching method.In the back contact battery string typesetting device, a lifting piece carrying mechanism is used for carrying battery piece sets to a bearing table, the bearing table is used for bearing N battery piece sets typeset according to a preset interval, and a piece suction mechanism is located above the feeding end of the bearing table, when the back contact battery string arrangement device switches string types and the bearing table is in a no-load state, the lifting piece carrying mechanism carries a battery piece group to the piece sucking mechanism, the piece sucking mechanism grabs a battery piece I or a battery piece II in the battery piece group in the direction opposite to the string arrangement direction, and then the lifting piece carrying mechanism carries the battery piece group to the bearing table. According to the technical scheme, the problems that in the prior art, mechanisms are numerous, the structure is complex, a conveying table conveys a plurality of battery pieces, it is difficult to guarantee that the battery pieces cannot generate relative displacement and abrasion due to the friction force between the conveying table and the battery pieces, and the arrangement efficiency of the battery pieces is reduced when the battery pieces are reset through a restoration mechanism and checked through a visual mechanism are solved.
Owner:NINGXIA XN AUTOMATION EQUIP CO LTD

Elevator antenna laying method, device and equipment and storage medium

The invention provides an elevator antenna laying method and device, equipment and a storage medium. The method comprises the following steps: receiving an elevator antenna layout request triggered by a user, wherein the elevator antenna layout request comprises attribute information of a floor to be covered, a coverage type and information source attribute information; calculating a signal coverage rate of the to-be-covered floor according to the attribute information of the to-be-covered floor, the coverage type and the information source attribute information; according to the signal coverage rate, the attribute information of the to-be-covered floor, the coverage type and the information source attribute information, determining a target position of a to-be-laid elevator antenna meeting a preset coverage condition; and the target position is output, so that antenna arrangement equipment arranges the elevator antenna at the target position. According to the method, the antenna laying efficiency can be improved, and the signal coverage rate of the elevator antenna is guaranteed.
Owner:CHINA UNITED NETWORK COMM GRP CO LTD

Railway bridge hole arrangement optimization method based on expert knowledge base

The invention relates to the field of railway bridge hole span layout, and particularly discloses a railway bridge hole layout optimization method based on an expert knowledge base, which comprises the following steps: constructing the expert knowledge base; determining a layout range through a line longitudinal section, a horizontal sheet and a bridge starting height; determining the clearance demand and the weight of each control point; starting from the control point with the highest weight, selecting and matching a hole span which meets the clearance requirement and has the minimum beam length in the expert knowledge base, and arranging the hole span to the control point; arranging and adjusting the adjacent control points by adopting a standard simply supported beam; the accurate position of the abutment is determined through curve arrangement calculation; when hole span layout exists in the full-bridge range, a hole span scheme is obtained, the weight score and related cost of the scheme are calculated, and the process is repeated to obtain different combination schemes; and selecting the scheme with the highest weight score and the lowest cost from the various schemes, and outputting bridge hole span arrangement. According to the invention, based on the expert knowledge base, different schemes are combined, and the scheme with the lowest reasonable cost of the hole crossing is selected automatically.
Owner:SOUTHWEST JIAOTONG UNIV

Light layout scheme generation method and device, computer equipment and readable storage medium

The invention relates to the technical field of three-dimensional models, in particular to a light layout scheme generation method and device, computer equipment and a readable storage medium. Comprising the following steps: adding a light object in a design component of a three-dimensional model according to a light design requirement, and configuring light attribute information for the light object; determining a graphic design unit from the three-dimensional model according to the light attribute information; acquiring a position arrangement instruction of the light object; and generating a three-dimensional light design scheme according to the position arrangement instruction of the light object and the graphic design unit.
Owner:ZHEJIANG HUAWEI INTELLIGENT BUILDING TECH

Warehouse logistics conveying system rapid automatic layout method based on Unity 3D and CAD

The invention discloses a quick and automatic layout method for a warehouse logistics conveying system based on Unity 3D and CAD. The method comprises the following steps: extracting detail data of warehouse logistics conveying equipment; exporting and optimizing warehouse logistics conveying equipment detail data, and adjusting data in exported equipment detail table grids and a list arrangement sequence; the optimized details of the warehouse logistics conveying equipment are imported into Unity; and querying and analyzing data in the equipment details on the basis of a linear traversal algorithm in combination with matrix transformation, and automatically substituting corresponding equipment position information, rotation parameters and scaling into matrix transformation to complete spatial layout and attribute assignment of the warehouse logistics conveying system. Compared with an existing traditional conveying system layout technology, the data conversion step can be reduced, and data interaction of Unity3D and CAD is improved; the modeling cost is reduced, and the project economic benefits are improved; errors of spatial layout and attributes are reduced, and the model precision is improved; compared with the prior art, the layout efficiency of the conveying system can be improved by 70%-85%.
Owner:KUNMING KSEC LOGISTIC INFORMATION IND

Battery cell thermal runaway testing device

The utility model relates to the technical field of lithium battery testing, in particular to a battery cell thermal runaway testing device. The cell thermal runaway testing device comprises a clamping plate, a thermocouple and an attachment net. The number of the clamping plates is two, the two clamping plates are oppositely arranged so as to clamp the battery cell, an attachment net is arranged between the battery cell and the clamping plate on at least one side, the melting point of the attachment net is higher than 1000 DEG C, the thermocouple is arranged on the attachment net in a snakelike penetrating mode through meshes in the attachment net, and the temperature measuring end of the thermocouple extends out of the side, facing the battery cell, of the attachment net. The attachment net can be pressed against the surface of the battery cell, so that the temperature measuring end of the thermocouple is attached to the surface of the battery cell, and the temperature of the battery cell is monitored. Therefore, the thermocouple is stably fixed on the surface of the battery cell by using the attachment net, so that the thermocouple is not easy to shift or fall off, and the temperature measurement result of the thermocouple is accurate; meanwhile, the attachment net provided with the thermocouples in a penetrating mode can be repeatedly used in multiple tests, so that the arrangement efficiency of the thermocouples in the testing process is improved.
Owner:SUNWODA ELECTRONICS CO LTD

Logistics remote control method and system based on virtual reality

The invention provides a logistics remote control method and system based on virtual reality, and relates to the technical field of intelligent control, and the method comprises the steps: receiving the basic information of to-be-boxed goods from a port logistics monitoring assembly; generating multiple groups of to-be-boxed goods; generating a goods boxing scheme; obtaining a plurality of containers; receiving a plurality of anchoring positions of a plurality of target ships; generating a recommended transportation track and a recommended hoisting position of the tire crane; multiple groups of goods to be boxed are transported according to the recommended hoisting position, and the tire crane logistics equipment is controlled according to the recommended transportation track of the tire crane, so that the technical problem that in the prior art, the port logistics control automation degree and the port logistics transportation control refinement degree are low is solved; the boxing layout analysis of the goods to be boxed and the analysis of the lifting position and the falling position of the tire crane logistics equipment are achieved, and the technical effects that the control precision of the tire crane logistics equipment is improved, and then the port logistics transportation control refinement degree is improved are achieved.
Owner:MEITE INFORMATION TECH (QIDONG) CO LTD

Thermal management system and method for cold start of fuel cell vehicle

ActiveCN119009002AMeeting Thermal Management NeedsImprove fast boot performanceFuel cellsBattery/fuel cell control arrangementElectrical batteryThermal management system
The invention belongs to the technical field of fuel cell automobiles, and discloses a thermal management system and method for cold start of a fuel cell automobile, and the thermal management system comprises a fuel cell stack, a heat accumulator, a heater and a radiator which are connected through a three-way valve to form a circulation loop. A heat accumulator or a heater is used for heating; when the machine is not stopped and the temperature is low, direct heating is performed; when the temperature of the electric pile is between the rated environment temperature and the first set temperature, the cooling liquid is recycled; the temperature continues to rise, and the heat accumulator participates in cooling; if the maximum working temperature is reached, the radiator is selected to independently cool or jointly cool according to the temperatures of the heat accumulator and the radiator, so that the temperature of the electric pile is proper; the system effectively manages the temperature change in cold start and operation of the fuel cell vehicle, improves the heat efficiency, prolongs the service life of the battery, optimizes the overall performance, realizes efficient utilization and distribution of heat energy through intelligent regulation and control, and adapts to different working condition requirements.
Owner:JILIN UNIVERSITY

Automatic layout method for electronic components of circuit board

The invention provides an automatic layout method for electronic components of a circuit board, and the method comprises the steps: exporting functional modules in a schematic circuit diagram into an independent circuit netlist, carrying out the layout modeling of the components through employing a single-layer binary tree structure, and carrying out the layout modeling of the whole circuit based on a multi-layer binary tree structure. Therefore, a multi-layer nested binary tree structure is formed. An optimization algorithm is combined with a heuristic strategy, and circuit performance parameters such as wire length, layout area and signal integrity are used as optimization targets to carry out iterative optimization on the layout model. And automatically generating a detailed layout scheme of the circuit board according to the optimized layout model. Before layout, preprocessing of a schematic circuit diagram is carried out, after layout, verification of a layout scheme is carried out, and it is ensured that all design constraints are met. The circuit board design efficiency and quality can be remarkably improved, the workload of manual adjustment is reduced, the risk of design reworking is reduced, and the automatic design level is improved.
Owner:XPEEDIC CO LTD

Building standard floor electromechanical pipeline modular arrangement sequence optimization method

The invention provides a building standard floor electromechanical pipeline modular arrangement sequence optimization method, and belongs to the technical field of building construction, and the method comprises the steps: firstly building a fine building BIM model, and dividing an electromechanical system into small modules; then analyzing the relationship between the modules, and determining a necessary sequence and a variable sequence; a weighted directed graph network is established for the variable sequence, and a heuristic function is defined. And searching an optimal arrangement path in the network by adopting an improved A * algorithm, and generating a detailed arrangement scheme. And finally, collision detection and simulation installation are carried out in the BIM model, and the feasibility of the scheme is verified. If problems exist, weight adjustment and optimization are returned until a final scheme is obtained. According to the optimization method, the BIM technology, the graph theory and the heuristic search algorithm are combined, electromechanical pipeline arrangement in a complex building can be effectively optimized, and the technical problem that in the prior art, modular arrangement sequence optimization of electromechanical pipelines of a building standard floor is difficult to achieve quickly and efficiently is solved.
Owner:CHINA CONSTRUCTION INDUSTRIAL & ENERGY ENGINEERING GROUP CO LTD

Layout method, system and device of inverter

The invention discloses an inverter layout method, system and device, and the method comprises the steps: carrying out the grouping of photovoltaic module groups based on the position information of each photovoltaic module in a power station, and enabling the distance between any two photovoltaic modules in the same photovoltaic module group to be smaller than a first preset distance, the photovoltaic modules in the same photovoltaic module group are connected in series and / or in parallel and then are connected with the same inverter, each photovoltaic module group comprises a plurality of photovoltaic modules, and the distances between the photovoltaic modules in the same photovoltaic module group are small, so that the plurality of photovoltaic modules can be connected with the same inverter, and the photovoltaic modules in the same photovoltaic module group can be connected with the same inverter. And the same inverter inverts the direct current output by the plurality of photovoltaic modules into alternating current. Therefore, according to the invention, the layout of the inverters can be automatically carried out according to the position of each photovoltaic module, the distance between the photovoltaic modules connected with the same inverter is ensured to be small, reasonable inverter distribution is carried out, the arrangement cost of the inverters is reduced, and the layout efficiency is high.
Owner:ALTENERGY POWER SYST

Webpage layout method and device for browser automatic adaptation

The invention relates to a webpage layout method and device automatically adapted to a browser, and the method comprises the steps: setting an elastic attribute for an initial element through a cascading style sheet, and obtaining an elastic element with the elastic attribute; browser rendering is carried out according to the elastic elements and the elastic attributes, and the target style of each elastic element and the size and position of each elastic element in a browser are determined; and performing webpage layout according to the target style of the elastic element and the size and the position of the elastic element in the browser. The page layout efficiency of the browser is improved.
Owner:DONGTU TECH (YICHANG) CO LTD

Photovoltaic module arrangement method and terminal equipment

The invention provides a photovoltaic module arrangement method and terminal equipment. The photovoltaic module arrangement method comprises the following steps: acquiring a profile diagram of each object element of a roof on which a photovoltaic module is to be installed and building obstacle information; the object elements comprise boundary object elements and non-boundary object elements; partitioning the contour map according to boundary object elements on the roof to form a plurality of roof regions; the boundary object elements comprise roof boundaries, roof boundaries and expansion joints; calculating a first shadow area generated by each non-boundary object element and each obstacle under sunlight all year round; determining an arrangement area according to the first shadow area in each roof area and the total area of each roof area; and arranging the photovoltaic modules in the arrangeable area of each roof area based on the arrangeable area and the parameter information of the photovoltaic modules. According to the invention, the roof is divided into a plurality of roof areas based on the boundary object elements, the method can be suitable for each roof, the universality is improved, and automatic arrangement of the photovoltaic modules is facilitated.
Owner:ARCTECH SOLAR HOLDING CO LTD

Subway tunnel foreign matter invasion identification and positioning system and method

The invention relates to the technical field of subway safe operation monitoring, and discloses a subway tunnel foreign matter invasion identification and positioning system and method, and the system comprises a detection unit, a photoelectric conversion module, a processor, and a transmission optical fiber. The subway tunnel internally comprises at least one running track, two columns of detection units are arranged above each track in the track direction, each column of detection units is provided with a plurality of infrasonic wave sensors, and all the infrasonic wave sensors are located at the same horizontal height. The infrasonic wave sensors in each column of detection units are distributed at equal intervals, and the infrasonic wave sensors in the two columns of detection units are distributed in a staggered manner; the infrasonic wave sensors on each column of detection units are connected in series through transmission optical fibers; the infrasonic wave sensors on each column of detection units are connected to a photoelectric conversion module through a transmission optical fiber; the photoelectric conversion module is connected with the processor. On the basis of ensuring high detection sensitivity and high accuracy, the equipment and the detection method are simplified, and the cost is reduced.
Owner:GUANGZHOU METRO DESIGN & RES INST CO LTD

Construction site facility arrangement method, device, equipment and medium

The invention belongs to the technical field of construction site arrangement, and particularly discloses a construction site facility arrangement method, device and equipment and a medium. Comprising the following steps: acquiring construction site data, and establishing a three-dimensional model according to the construction site data; calculating a comprehensive quantized value between any two units in the three-dimensional model by adopting an SLP method according to the three-dimensional model; generating a plane layout diagram according to the three-dimensional model; establishing a target function according to the three-dimensional model, the plane layout diagram and the comprehensive quantized value between any two units; and establishing a fitness function according to the target function, and obtaining an optimal layout by adopting a genetic algorithm. According to the method, the objective function is established from multiple angles, and then the fitness function is established through the objective function, so that the optimal layout is obtained by using the genetic algorithm, the layout efficiency and precision are higher, and the influence of experience is small.
Owner:STATE GRID BEIJING ELECTRIC POWER CO +1

Intelligent layout method and device for PCB components and medium

The invention discloses an intelligent layout method and device for PCB components and a medium, and relates to the technical field of integrated circuits. The intelligent layout method comprises the following steps: acquiring a schematic circuit diagram to be arranged and dividing the schematic circuit diagram into at least one functional module, matching the functional module with a preset functional template to obtain a reusable functional template, and extracting the same components in the functional template and the reusable template to perform reuse of a layout rule. Therefore, checking and modifying work after overall multiplexing is avoided, and the overall layout efficiency is improved.
Owner:BEIJING TIANDI YIGE TECH CO LTD

Chip circuit layout method, computer equipment and storage medium

The invention provides a layout method of a chip circuit, computer equipment and a storage medium. The method comprises the steps that an initial layout result of a to-be-designed circuit is obtained, the to-be-designed circuit comprises a macro module, the initial layout result comprises the initial position of the macro module, a layout guide line is displayed, the layout guide line comprises anchor points, the anchor points are fitted to form the layout guide line, and the layout guide line is arranged at the initial position of the macro module. The circuit to be designed is divided into a first part and a second part by the layout guide line, the position data and the first contour data of the layout guide line are read, and the layout result of the macro module is obtained based on the position data, the first contour data and the initial position of the macro module. By means of the method, an engineer can automatically adjust the position of the macro module through the position data and the contour data determined after the anchor points of the layout guide line are adjusted, and the chip layout efficiency is improved.
Owner:X TIMES DESIGN AUTOMATION CO LTD

Layout device for 3D paving of asphalt mixture

The utility model relates to the technical field of pavement paving, in particular to a 3D asphalt mixture paving device which comprises a material storage structure, a material stirring structure is rotatably mounted on one side in the material storage structure, a plurality of material distribution structures are fixedly mounted on one side of the bottom of the material storage structure, and the material storage structure comprises a material storage hopper. A discharging barrel is fixedly installed at one end of the storage hopper, a discharging opening is formed in the bottom side in the discharging barrel, the stirring structure comprises a rotating shaft, a bidirectional spiral blade is fixedly wound around the side surface of the rotating shaft, and the two ends of the rotating shaft are fixedly connected with the output end of a driving motor. According to the utility model, the rotating shaft is driven by the two groups of driving motors to carry the two-way spiral blade to rotate alternately in the positive and negative directions at the moving frequency, so as to convey a mixture in the two-way spiral blade, convey the mixture in the middle of the discharging barrel to two ends, or convey the mixture at two ends to the middle, and discharge the mixture from the discharging hole; and the relatively uniform material distribution work is continuously carried out.
Owner:深圳市中森建筑工程有限公司

Separated fish egg and larval fish sample collecting device

The invention discloses a separated fish egg and larval fish sample collection device, and belongs to the technical field of fish egg collection, the collection device comprises a main body, the main body can be suspended and lifted on a ship side, the main body is provided with a flow path allowing a water body to vertically pass through, the flow path is internally provided with a support and a collection part, and the collection part is provided with a net body surrounding the side face of the support; the lower part of the main body is provided with a screen through which fish eggs and larvae can pass, the lower end of the screen body is provided with a lower connecting pipe, the lower connecting pipe is fixed with the lower part of the bracket, the upper end of the screen body is provided with an upper connecting pipe, the upper connecting pipe can slide along the bracket, the screen body can transversely expand in the direction far away from the bracket, and the upper connecting pipe is provided with a conical wall expanding upwards. According to the invention, the net body can be quickly lowered to the required water depth, and the catching area of the net body is enlarged during recovery, so that the catching performance of plankton is improved.
Owner:MARINE FISHERIES RES INST OF ZHEJIANG

Pneumatic polishing executing mechanism for multi-sensor fusion measurement and control method of pneumatic polishing executing mechanism

The invention discloses a multi-sensor fusion measurement pneumatic polishing executing mechanism and a control method thereof, relates to the technical field of automatic polishing machining, and solves the problem that due to the existence of polishing liquid or polishing paste for polishing machining, a polishing clamp is installed on force measuring equipment, and the equipment is prone to pollution. The device comprises a bottom plate, the center of the top end of the bottom plate is in threaded connection with a back plate through a corner connector, and a polishing mechanism is arranged at the top end of the front surface of the back plate; a first fixing mechanism, a plurality of workpiece end pressure sensors, a second fixing mechanism and a clamping mechanism are sequentially arranged at the front end of the top of the bottom plate, and the polishing mechanism communicates with the two air outlet ends of the air source. Through work of the mechanisms, multi-sensor fusion measurement is adopted, multi-dimensional accurate real-time polishing force measurement is achieved, a method for measuring the polishing force through a single sensor is changed, and an accurate measurement result is provided.
Owner:SHENYANG LIGONG UNIV

Calculation and optimization method for trunk lid elbow hinge axis arrangement

The present invention relates to the technical field of automobile structural design optimization methods, and specifically refers to a trunk lid bent tube hinge axis arrangement calculation optimization method. According to the rear modeling CAS surface, as well as known design parameters and set constraints, the trunk lid initial opening θ0 and the hinge axis initial coordinate f0 are set; a hinge optimization area is constructed, and within the hinge optimization area, the trunk lid initial opening θ0 and the hinge axis initial coordinate f0 are calculated based on the hinge span design requirements, human-machine goals, the safety gap of the hinge relative to the sealing strip movement, the safety gap requirements of the trunk lid and the rear windshield during the opening process, the assembly space distance between the hinge axis and the rear windshield, and the trunk lid closing force requirements to obtain the optimal solution for the hinge axis. The optimization method of the present invention is reasonably designed, with rich considerations, avoiding the risk of repeated modifications in the later stage, improving the efficiency of the hinge axis design and development, and has great promotion value.
Owner:DONGFENG MOTOR GRP

Efficient spraying soldering paste and preparation method thereof

The invention discloses high-efficiency spraying soldering paste and a preparation method thereof. The high-efficiency spraying soldering paste is composed of the following raw materials in percentage by mass: 75-85% of lead-free soldering powder; the particle size of the lead-free solder powder is 15-25 [mu] m; 15%-25% of soldering flux; the soldering flux is composed of the following raw materials in parts by weight: 15-25 parts of polymerized rosin; 5-15 parts of hydrogenated rosin; 5-10 parts of rosin glyceride; 3 to 5 parts of ethyl palmitate; and 3-5 parts of calcium chloride and the like. The lead-free solder powder with the particle size of 15-25 microns is adopted, the cost is low, and the soldering flux of the formula is used in a matched mode, so that the product can be subjected to injection arrangement through various injection devices, a traditional steel mesh printing mode is replaced, the arrangement efficiency of the solder paste is effectively improved, and the production cost is reduced. In addition, the soldering paste is very good in wettability in the spraying process, spraying is smooth, the welding spot quality is stable, and the reliability and the production efficiency of electronic products can be improved.
Owner:DONGGUAN YONGAN TECH

A self-loading and unloading emergency generator electric push rod telescopic leg structure

This utility model discloses an electric push rod telescopic support leg structure for a self-loading and unloading emergency generator, including four support leg assemblies set at the four corners of the self-loading and unloading emergency generator, an upper U-shaped seat fixed to the top surface of the transverse support column, an upper limit seat fixed to the side of the top of the electric push rod and corresponding to the upper U-shaped seat, a lower U-shaped seat fixed to the bottom surface of the transverse support column, a lower limit seat fixed to the side of the bottom of the electric push rod and corresponding to the lower U-shaped seat; a cylindrical pin; and a press-type quick-limiting structure set on the lower limit seat and the upper limit seat. This application overcomes the problems of cumbersome operation and low efficiency of the bolt locking method in the prior art by adopting the combination of cylindrical pin and press-type quick-limiting structure. This structure can realize quick and stable limiting when the electric push rod is rotated to a vertical or horizontal state, which greatly improves the layout efficiency of the entire electric push rod telescopic support leg structure.
Owner:广西电网能源科技有限责任公司 +1

Magnetic type mounting bracket structure for explosion-proof monitor

The utility model discloses a magnetic type mounting support structure for an explosion-proof monitor, and relates to the technical field of explosion-proof monitors, the magnetic type mounting support structure comprises a mounting seat and a magnetic component, the center of the interior of the mounting seat is provided with a positioning groove, the left side of the mounting seat is fixedly provided with a side plate, and the front end and the rear end of the top of the mounting seat are fixedly connected with stabilizing plates; the magnetic attraction assembly is arranged on the left side of the side plate and comprises a fixing column, a connecting ball, a positioning plate, a magnet and a rubber ring. According to the magnetic type mounting bracket structure for the explosion-proof monitor, through the arrangement of the magnetic component, when the explosion-proof monitor needs to be mounted on a metal wall surface in a plant, the bracket only needs to be directly attached to the wall surface, at the moment, the magnet can adsorb the metal wall surface to quickly fix the bracket, and meanwhile, the rubber ring can deform, so that the explosion-proof monitor can be mounted on the metal wall surface. Therefore, the friction force between the side plate and the wall surface is increased, the side plate is prevented from sliding on the wall surface, and the stability after installation is improved.
Owner:TONGJI ARTIFICIAL INTELLIGENCE RES INST SUZHOU CO LTD

GIS equipment intelligent transportation and arrangement system and method based on digital twinning

PendingCN121956618AReduce shipping timeReduce layout timeSimulator controlSatellite radio beaconingData acquisitionDigital mockup
The invention provides a GIS equipment intelligent transportation and arrangement system and method based on digital twinning, and relates to the technical field of power equipment installation. The system comprises an equipment cleaning module, an equipment transportation and arrangement module, a digital model module, a data acquisition module, a data transmission module and a remote monitoring module. Wherein the equipment transportation module is composed of a GIS equipment transportation vehicle, a transportation track and a GIS indoor bridge crane, and is used for carrying GIS equipment; the data transmission module establishes data interaction among the functional modules and is responsible for remote distribution; the data acquisition module carries out fusion calculation on sensor, control and position information; and the remote monitoring module is used for visual display and interaction of the digital twinning. The expandability and the flexibility of the system are improved by adopting a modular design; and by combining high-precision RTK positioning, multi-sensor fusion and virtual simulation synchronization technologies, the precision, efficiency and safety of the GIS equipment in the indoor carrying and arrangement process of the transformer substation can be remarkably improved.
Owner:CHINA THREE GORGES UNIV +2