The application discloses a trailer mounting method for a
deep water test
pool and relates to the technical field of
deep sea engineering, which comprises the following steps: S1, basic frame manufacturing and installation: taking the center line of the on-site
pool as the X-Y trailer installation reference, manufacturing and installing the basic frame; S2, X-Y trailer main body installation (including the wheel set); S3, drive device installation; S4, auxiliary trailer installation; S5,
hydraulic brake system installation; S6, guide device installation; S7, cleaning device installation; S8, speed measuring device installation; S9,
welding and fixing the buffer support according to the on-site actual measurement size, synchronously
welding the front and rear buffer blocks of the X-Y trailer; installing the hydraulic buffer on the buffer support; S10,
electric control cabinet positioning base and
electric control circuit installation; and S11, power supply
system installation: the slide wire is hung on the installation support through the insulator, and the carbon
brush slider of the
current collector on the main trailer is kept in
close contact with the lower surface of the slide wire. The application effectively solves the
installation problem caused by the space sealing of the laboratory through the step-by-step
assembly scheme.