The invention discloses a
heat supply unit deep peak regulation and
heat supply optimization operation method based on multi-mode
collaboration, and particularly relates to the technical field of thermal power generation and
heat supply, and the method comprises the steps of S1,
system modeling and parameter identification, S2, thermoelectric load prediction, S3, multi-objective optimization solution, S4, operation decision and feedback, and S5, data agent mapping acceleration. According to the method, the thermoelectric load is accurately predicted through mechanism and data dual-drive modeling, and based on the target of maximizing the
economic benefits of the whole
plant, the optimal cooperation scheme of multiple operation
modes such as heat supply, power supply and deep peak regulation is dynamically solved by utilizing the multi-target optimization
algorithm on the premise of ensuring the safety of the unit, so that the power supply efficiency is improved. Finally, production is guided through an online decision-making and closed-loop feedback
system, and safe, economical and flexible operation of the unit under the working condition of deep peak regulation is achieved.