The invention relates to a
wind power generation
tower prestress
anchor bolt cage which comprises an
anchor bolt, an upper
flange and a lower
flange. The
anchor bolt penetrates through an anchoring nut, the lower
flange, a positioning nut, an anchor bolt casing
pipe, an adjusting nut, the upper flange, a T-shaped flange at the bottom of a
wind power generation
tower and a locking nut in sequence. The upper flange is an annular steel plate, an anchor bolt hole is an inverted-cone hole, and the adjusting nut can support the upper flange and adjust the levelness of the upper flange; the lower flange is an annular steel plate, a lower flange support bolt and a support nut bear the weight of the lower flange and can adjust the levelness of the lower flange, the lower flange is fixed through a pressing nut, and the lower flange support bolt is supported on a base plate. According to the
wind power generation
tower prestress anchor bolt cage, the anchor bolt and foundation concrete are separated through the anchor bolt
casting pipe, the anchor bolt applies pretension force, and the concrete is subjected to the stress; the position and levelness of the upper flange are adjusted through the adjusting nut; the inverted-cone hole of the upper flange enables the center area, the inner edge and the outer edge of the T-shaped flange at the bottom to be pressed against the upper flange more tightly, and the inverted-cone hole is filled with sealing materials. The
wind power generation tower prestress anchor bolt cage enables the integrality of the connection of a tower frame and the foundation to be good, is even in rigidity, and improves durability and anti-fatigue performance of connection.