The invention discloses a systematic construction method for advanced prediction of water burst of a karst tunnel. The method comprises the following steps of (1), researching existing data and formulating a prediction scheme; (2), a tunnel face detecting process; (3), a drilling machine measuring process; (4), a water burst position measuring process; and (5), a rock drilling verification process. According to the method, a plurality of devices are linked, systematization is enhanced, compared with a traditional advanced prediction method, the method has the advantages that the devices for the advanced prediction are organically combined, the devices are linked with one another, a set of systematic solution is provided for solving an advanced prediction problem of the karst tunnel water burst, complementation of advantages and disadvantages is achieved, the prediction precision is improved, a karst tunnel water burst advanced prediction mechanism is improved, the popularization prospect is good, a whole set of systematic solution is provided for the karst tunnel water burst, the advanced prediction effect is good through practical engineering application, and the certain popularization value is achieved.