According to the LNG ship pump
tower high-precision assembling method, a main pump
pipe supporting cross beam is fixed to the ground through supporting columns, and main pump supports, emergency pump
pipe supporting columns and supporting
pipe supporting beams are sequentially arranged at the two ends of the main pump pipe supporting cross beam from outside to inside; a first arc-shaped plate is fixed to the top of the main pump support, a limiting piece is arranged on the inner side of the main pump support, and the main pump pipe is located on the main pump support. An emergency pump pipe supporting beam is transversely arranged between the upper portions of the two emergency pump pipe supporting columns, an emergency pump
pipe support is fixed to the center of the emergency pump pipe supporting beam, a second arc-shaped plate is fixed to the top of the emergency pump
pipe support, and an emergency pump pipe is located on the emergency pump
pipe support. Supporting positioning,
size adjustment, precision control and material protection of the pump
tower structure can be achieved,
rapid construction and manufacturing of the pump
tower triangular mast structure are achieved, the construction speed of the pump tower is increased on the premise that the pump tower manufacturing requirement is met, and free disassembly and repeated use are achieved.