Arrangement and method for the construction-time use of an
elevator, which arrangement comprises an
elevator car (2), hoisting roping (4), a hoisting
machine fitted to move the
elevator car via the hoisting roping (4), which hoisting
machine is preferably disposed on the
machine room level (22) at the top end of the elevator hoistway, a counterweight (56), and which elevator comprises compensating roping (10), which compensating roping is connected to the
supply storage (16) of the compensating roping. In the arrangement, the compensating roping (10) is connected to the elevator car via a diverting
pulley (28) on the elevator car and to the counterweight (56) via a diverting
pulley (58) on the counterweight (56). In the method one or more jumps of the machine room level are performed, and the additional
rope needed for a jump of the machine room level is taken from the
supply storage of the compensating roping. The construction-time roping of the elevator is arranged such that the compensating roping is connected to the elevator car (2) via the diverting
pulley (28) on the elevator car (2) and to the counterweight (56) via the diverting pulley (58) on the counterweight (56).