The application discloses a kind of
electric power material scheduling method,
system, equipment and medium, belong to
electric power system field, method is: according to fire change tendency and
base station position, the
base station of existence power interruption risk is identified, obtain multiple risk base stations, the density data is obtained by carrying out
density analysis to all risk base stations, combined with density data and the historical outage data of each risk
base station is spatio-temporal
joint analysis, obtain interruption probability distribution;The demand information of each risk base
station is matched with inventory information and is analyzed, and resource coverage is obtained, if resource coverage is lower than preset threshold, then based on fire change tendency, interruption probability distribution and inventory information, from multiple risk base stations, determine that there is supply and demand imbalance in the target base
station in the prediction time interval;
Resource scheduling is carried out to each target base
station, and the scheduling scheme station is obtained, therefore, by implementing the present application, the accuracy of base station interruption risk prediction can be improved, and then
resource utilization and power safety are improved.