Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

12 results about "Reservoir management" patented technology

AI / ML and blockchained based automated reservoir management platform

A system for managing well site operations comprising a well site operations module, a chain of blocks of a distributed network, and a sensor bank and control module. The operations module generates earth model variables using a physics model, well log variables or seismic variables, or both, and a trained AI / ML algorithmic model. The chain of blocks comprises a plurality of subsequent blocks. Each subsequent block comprises a well site entry and a hash value of a previous well site entry. A well site entry comprises transacted operation control variables. The well site operations module generates production operation control variables or development operation control variables from earth model variables. The well site entry can also include transacted earth model variables and sensor variables. The sensor bank and control module provides well log variables and the operations module couples control variables to the control module to control well site equipment.
Owner:LANDMARK GRAPHICS CORP

A reservoir lifecycle management system based on spatiotemporal matrix and digital twin.

This invention relates to the field of reservoir engineering management technology, specifically a reservoir lifecycle management system based on spatiotemporal matrix and digital twin. The system includes a digital twin model construction module, a spatiotemporal matrix module, a data fusion module, a lifecycle simulation module, a real-time data acquisition and update module, a model dynamic adjustment module, and a management decision support module. The system uses a spatiotemporal matrix to uniformly organize and manage multi-source data throughout the reservoir's lifecycle, utilizes a digital twin model to construct a virtual representation of the reservoir, achieves bidirectional synchronization through data fusion, and dynamically adjusts model parameters based on real-time data, ultimately generating lifecycle management decision outputs. This invention solves the problems of scattered data and static models in existing technologies, improving the accuracy and reliability of reservoir management.
Owner:YUNNAN AGRICULTURAL UNIVERSITY +1

Model construction method and system for thin interlayer and phase control physical property cause sand body configuration

The embodiment of the invention provides a thin interlayer and phase control physical property cause sand body configuration model construction method and system, and belongs to the technical field of reservoir modeling. The method comprises the following steps: identifying fluvial facies reservoir distribution characteristics based on exploration data, and constructing a corresponding cause sand body reservoir configuration model; obtaining a corresponding small-layer sand body deterministic model based on the cause sand body reservoir configuration model; on the basis of the deterministic model of the small-layer sand body, performing representation of an internal configuration interface of the sand body based on a lateral lamination model and an adaptive triangular mesh generation algorithm; and generating a distribution model of each lithofacies unit based on representation of a configuration interface in the sand body, and constructing a physical property model for fine modeling and heterogeneity description of high and low permeability sections in the configuration based on a phase control stochastic simulation method. According to the scheme, the limitations of insufficient precision, unreasonable transition and low calculation efficiency in traditional modeling are effectively overcome, and high-precision geologic model support is provided for reservoir management and oil reservoir development.
Owner:CHINA PETROLEUM & CHEMICAL CORP +1

A multi-stage multi-objective based reservoir water resource optimal allocation method

ActiveCN115630795BWater useLand resources
The application discloses a kind of reservoir water resource optimal allocation method based on multi-stage multi-objective belonging to water resource management technical field, comprising the following steps: A, predict the water resource demand, water resource available quantity, social economy and other basic data in basin;B, with the maximum unit water resource utilization benefit as target, with reservoir water balance, irrigation and power generation water demand, salinity leaching and so on as constraint condition, construct water resource optimal allocation model;C, coupling fixed combination stochastic programming and fractional programming method is solved to model, according to the water resource shortage obtained under different probability level arrangement production to reach maximum unit allocation water benefit.The application fully considers the necessity of joint management of upstream hydropower generation and downstream agricultural irrigation in reservoir management system, reasonably allocates water resources, land resources and energy in the basin, obtains the maximum unit allocation water benefit, so as to relieve water contradiction and improve the utilization efficiency of resources.
Owner:BEIJING NORMAL UNIVERSITY

A reservoir dam safety risk grade evaluation method

ActiveCN120387677BRisk ratingSafety status
This invention discloses a method for assessing the safety risk level of a reservoir dam, specifically relating to the field of reservoir dam risk assessment technology. It involves acquiring real-time stress data of the reservoir dam, spillway discharge capacity data, and reservoir water level change data, extracting and predicting abnormal features from these data, and generating relevant outliers. A fuzzy comprehensive evaluation method is used to perform weighted analysis on multiple risk factors to calculate the dam's comprehensive risk score. The comprehensive risk score is compared with a risk level classification threshold to determine the reservoir dam's safety risk level. Based on the assessment results, corresponding early warning information and emergency response measures are output to ensure the safe operation of the reservoir dam. This method can monitor the safety status of the reservoir dam in real time, provide timely early warning of potential risks, and offer scientific decision support for reservoir management personnel.
Owner:NANJING HYDRAULIC RES INST

Land RIG move optimization through prediction of the release date with artificial intelligence

The present disclosure relates to a computer-implemented method (100) for oil rig move operations, comprising: obtaining reservoir management data (110), obtaining real-time drilling data (120), estimating, using a trained artificial intelligence (Al) release date estimation engine, a release date of the oil rig based on the reservoir management data and the real-time drilling data (130), and allocating at least one resource for the oil rig move operation based on the estimated release data (140). In addition, the present disclosure relates to a corresponding system and computer program.
Owner:MATRIX JVCO LTD

A method, system, medium and equipment for obtaining a social and economic data investigation range in a river-shaped reservoir safety risk area

The present application relates to a kind of river shape reservoir safety risk area social economic data investigation range acquisition method, system, medium and equipment, it includes: according to the multiple period remote sensing image of the area where the water level observation station of reservoir main dam upstream main dam is located and its synchronous water level monitoring data, water level elevation correction value is obtained to correct reservoir check flood level, flood control high water level;According to DEM data, the intersection of river channel line and reservoir management range surface in the direction of reservoir tail is calculated, i.e.the elevation of reservoir tail;According to the elevation of reservoir tail and the corrected reservoir check flood level, flood control high water level, according to the elevation reference value of the extraction of each area investigation range, according to the number of partition, along river channel, the reservoir area is partitioned, and according to the elevation reference value of the extraction of each area investigation range, the investigation range is extracted in each area, to obtain final investigation range.The present application can realize the fast, accurate acquisition of river shape reservoir safety risk area social economic data investigation range.
Owner:水利部信息中心(水利部水文水资源监测预报中心)

Digital twin modeling method for intelligent reservoir scheduling decision support system

This invention discloses a digital twin modeling method for a reservoir intelligent scheduling decision support system, belonging to the field of decision modeling technology. A multi-source data fusion module integrates data from multiple sources such as satellites and UAVs, improving data quality through cleaning and spatiotemporal alignment. A physical mechanism modeling module constructs hydrodynamic and joint scheduling models to ensure simulation accuracy. A data-driven modeling module uses LSTM, graph convolutional networks, and other techniques to predict hydrological and equipment status. A twin mapping and interaction module establishes a bidirectional mapping to achieve virtual-real interaction. A decision support module provides scientific decision-making solutions based on multi-objective optimization algorithms. All modules work together to improve the intelligence level of reservoir scheduling. This invention extends the flood forecast lead time and reduces errors; optimizes multi-objective scheduling to improve the comprehensive benefits of water resources; achieves precise synchronization between the digital twin model and the physical entity, enhancing dam safety monitoring capabilities; provides intelligent decision support, shortens response time, and promotes the transformation of reservoir management towards intelligence and efficiency.
Owner:TIANJIN BAIZE TECH CO LTD

A method for calculating dynamic water balance of river type reservoir

The application discloses a kind of river type reservoir dynamic water balance calculation method, comprising the following steps: step 1, determine the river type reservoir control basin range and divide catchment unit;Step 2, predict the river type reservoir's water inflow based on distributed hydrological model;Step 3, calculate the maximum possible storage of river type reservoir;Step 4, calculate the loss of river type reservoir water quantity;Step 5, calculate the storage of river type reservoir and discharge water quantity;Step 6, based on the ecological flow control requirements, the storage of reservoir and discharge water quantity are corrected.The method can realize dynamic adjustment and correction to the regulation and discharge process of river type reservoir, improve the downstream ecosystem of reservoir, provide important technical support for water resources management, scheduling optimization and planning design of river type reservoir, and promote the overall improvement of river type reservoir management efficiency.
Owner:SHANDONG NUCLEAR POWER CO LTD +1

Reservoir-wellbore coupled numerical simulation methods, apparatus, equipment and media

This invention provides a reservoir-wellbore coupled numerical simulation method, apparatus, equipment, and medium, belonging to the field of reservoir numerical simulation technology. The method includes: acquiring the current wellbore-reservoir contact surface temperature, reservoir fluid pressure, and mole fraction of each phase; and calling a multiphase, multicomponent flow model for an ultra-deep wellbore and an ultra-deep fault-controlled oil and gas reservoir. First, the relevant data are input into the reservoir model for solution to obtain the parameters corresponding to the next time step. Then, some parameters are input into the wellbore model to obtain the pressure within the wellbore. If the pressure difference between the reservoir fluid pressure and the pressure within the wellbore is less than a preset threshold, the pressure within the wellbore at the next time step is output. This invention significantly improves the prediction accuracy of pressure within the wellbore by coupling the wellbore and reservoir models, enabling optimization of reservoir production plans and effective guidance for reservoir management, thereby improving recovery rate and economic benefits.
Owner:CHINA PETROLEUM & CHEMICAL CORP +1

Reservoir capacity calculation method, device, equipment and medium

The application relates to the technical field of reservoir management, and discloses a reservoir storage capacity calculation method, device, equipment and medium. The method comprises the following steps: obtaining digital elevation model data of a target reservoir, three-dimensional point cloud data of a region above a current water surface of the target reservoir, and spatial information below the current water surface; target three-dimensional elevation structure data in a target reservoir region range is calculated; first hydrological water quality parameter information of a section upstream of an inlet of the target reservoir and second hydrological water quality parameter information of an outlet are monitored; target reservoir current calibrated reservoir storage capacity information is calculated according to the target three-dimensional elevation structure data and water level height information of the outlet; a target reservoir bottom newly added silt volume quantity value is calculated according to the first and second hydrological water quality parameter information; and actual reservoir storage capacity information is calculated according to the reservoir storage capacity information and the target reservoir bottom newly added silt volume quantity value. The technical scheme significantly improves the scientificity and safety of reservoir operation management.
Owner:SHENZHEN QINGYAN YINGSHI TECHNOLOGY CO LTD

Reservoir temperature-flow-mass three-dimensional coupling model construction method and device and electronic equipment

The invention relates to the technical field of reservoir management, and discloses a reservoir temperature-flow-mass three-dimensional coupling model construction method and device and electronic equipment, and the method comprises the steps: obtaining the actual measurement basic data of a reservoir; respectively constructing a hydrodynamic model, a water temperature model and a water quality model based on the actually measured basic data of the reservoir and a preset three-dimensional platform; and coupling the hydrodynamic model, the water temperature model and the water quality model to form a temperature-flow-mass three-dimensional coupling model for synchronously simulating hydrodynamic, thermal and biochemical processes. The sub-models are separately established based on the preset three-dimensional platform, deep linkage of hydrodynamic force, water temperature and water quality processes is achieved through sub-model coupling design, and the problems that most of traditional models are single-process or double-process simulation, the coupling relation between a thermal field and the hydrodynamic force and biochemical processes is ignored, and the simulation efficiency is low are solved. The synergistic effect of hydrodynamic force, thermal force and biochemistry in the actual water body cannot be completely reflected.
Owner:BEIJING WATER SCI & TECH INST