Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

45results about How to "Normal installation" patented technology

Anti-theft bolt

The invention discloses an anti-theft bolt. The anti-theft bolt comprises a threaded rod, a nut and a locking block. Corresponding locking grooves are formed in the upper end and the lower end of thethreaded rod. Sawteeth which are uniformly distributed are arranged on the periphery of the outer diameter end of an annular boss, and the direction of tooth tops is set to be the counterclockwise direction. A matched circular baffle is arranged in a small circular concave hole, welded and fixed. A compression spring is arranged on the top of a cylinder. The shape of the side face of a locking portion is set to be an inverted right trapezoid. When the nut is rotated in the clockwise direction, the sawteeth on the annular boss enable the compression spring to upwards retract, and the inclined plane of the locking portion smoothly slides on the inclined planes of the sawteeth on the annular boss; and after the nut is screwed down, the vertical surface of the locking portion downwards abuts against the tooth tops of the sawteeth under the action of the elastic force of the compression spring, and the nut is prevented from rotating in the counterclockwise direction. The anti-theft bolt hasan anti-theft function when the anti-theft bolt is used in the installation process of a transformer, the situation that the nut cannot be disassembled from the threaded rod can be guaranteed, the transformer is prevented from being stolen, and the heavy loss of the property is avoided.
Owner:FUJIAN JINZHUAN INTPROP SERVICES CO LTD

Vacuum electronic multi-particle filling equipment

The invention belongs to the technical field of medicine pill filling, and discloses vacuum electronic multi-particle filling equipment. The vacuum electronic multi-particle filling equipment comprises a conveying system, wherein the conveying system comprises a conveying belt; medicine bottle cups used for containing medicine bottles are arranged on the outer surface of the conveying belt at equal intervals; a medicine filling multi-particle system is arranged above the conveying belt; the medicine filling multi-particle system is provided with a turntable medicine supply system; the medicine filling multi-particle system comprises a medicine filling installing seat and a medicine filling head capable of vertically moving on the medicine filling installing seat; a medicine filling exhaust cap used for locating the medicine bottle is arranged on the medicine filling head; a vacuum generator casing is arranged on the medicine filling installing seat. The vacuum electronic multi-particle filling equipment has the advantages that medicine pills can be precisely sucked out and blown into the medicine bottles through a turntable medicine supply system and the medicine filling multi-particle system; the filling quantity of the medicine pills is controlled through the vacuum generator; the extrusion crushing of the medicine pills is avoided; the precise control on the medicine pill counting is improved; meanwhile, the equipment can be applicable to the filling of the medicine pills with different particle numbers and sizes.
Owner:CHENGDU HEDA AUTOMATION EQUIP

Vehicular interceptor and high-pressure blow-molding rapid forming process thereof

The invention relates to a vehicular interceptor and a high-pressure blow-molding rapid forming process thereof. A process slice is additionally arranged in a stripe-type through hole, and a supporting role is played on an interceptor body; a protective jacket is additionally arranged on each bolt to prevent the interceptor body from being collided during transportation to cause the bolts to be damaged or deformed; an inner concave rib is additionally arranged in the reverse side of the interceptor body, and rigidity of the interceptor body is improved; two lugs are arranged on the front side of the interceptor body, and lift force at the tail end of a vehicle can be reduced; drainage holes are formed in positions close to two sides of the interceptor body, and convergence of rainwater can be prevented; the bottom of each of a bolt mounting seat and buckle mounting seat of the interceptor body is relatively thin, pressure to the interceptor body is reduced, convex mark produced on the front side of the interceptor body is avoided, and attractiveness of the interceptor body is achieved; mounting of the interceptor body and the vehicle is facilitated by the aid of the interceptor body, and mounting efficiency of the interceptor body is improved; a lamp installation groove is arranged in the side edge of the interceptor body, other types of vehicles can be well alarmed, and safety in vehicle driving is further improved.
Owner:江阴名旭模塑有限公司

Building glass panel wall mounting structure and construction method thereof

ActiveCN111622393AConstruction Deviation AdjustmentReduced construction accuracy requirementsConstruction materialWallsArchitectural engineeringMechanical engineering
The invention discloses a building glass panel wall mounting structure and a construction method thereof, and relates to the technical field of building construction. The building glass panel wall mounting structure is characterized by comprising mounting keels, mounting pieces, and a panel wall glass plate, wherein penetrating holes are formed in the panel wall glass plate; each mounting piece comprises a main body part and a fixing cover; the main body part is provided with an adjusting part; a penetrating pillar is rotatably arranged in the adjusting part; the adjusting part is provided with a guiding groove and a spacing spring; the adjusting part is provided with an adjusting rod; the penetrating pillar is provided with a fixing piece; the fixing piece comprises a connecting rod and apropping part; each mounting keel is provided with a connecting device; and each connecting device comprises a fixed block, a wedge block I and a wedge block II. The adjusting parts and the penetrating pillars are arranged, so that deviation existing in drilling positions of a glass plate and mounting positions of the mounting pieces on the keels can be rectified; the spacing springs and the adjusting rods are arranged, so that when the panel wall glass plates are mounted, the positions of the adjusting parts are kept stable, and the panel wall glass plates are convenient for staff to mount;and the connecting devices are arranged, so that the planeness of the surface of the panel wall is improved.
Owner:浙江奥腾建设工程有限公司

Anti-sloughing hole device and construction method of anti-sloughing hole

The invention discloses an anti-collapse hole device and a construction method for an anti-collapse hole. The anti-collapse hole device includes a hollow pipe, a drill tooth and a connector, the front end of the hollow pipe is fixedly connected to the drill tooth, and the rear end of the hollow pipe is equipped with a connector A through hole through the hollow pipe is opened at a distance of 150-200mm from the connection head on the hollow pipe; the anti-slump hole construction method includes the following steps: 1. Install the drilling rig bracket and the anchor cable rig; 2. Install a solid drill pipe On the anchor cable drilling rig, start the anchor cable drilling rig for construction drilling; 3. Take out the anchor cable drilling rig and the solid drill pipe, install the anti-slump hole device on the anchor cable drilling rig and perform secondary drilling; 4. Repeat steps 3 and 2 alternately Step 4: Use a solid drill pipe to drill a hole, and then use an anti-slump hole device for secondary drilling until the designed hole depth is drilled; 5. Clean the hole and install the anchor cable, anchor rod and grouting pipe. The anti-collapse hole device of the invention has reasonable design, simple structure, long service life, simple construction steps and good anti-collapse effect.
Owner:宿州市金河矿山设备有限公司

High-precision numerical control lathe

The invention discloses a high-precision numerical control lathe. The high-precision numerical control lathe comprises a lathe body, a lathe head and a base, wherein a groove is formed in the middle of the upper side of the lathe body; the high-precision numerical control lathe also comprises a screw rod end base and a screw rod mother base which are used for fixing a ball screw rod to the lathe body corresponding to the groove; an inversely-concave large support plate is arranged right above the groove; a sliding rail is arranged on each of two sides of the upper surface of the lathe body; sliding plates are arranged on two sliding rails in a spanning manner and are capable of sliding along the two sliding rails in a reciprocating manner; the ball screw rod comprises a nut and screw rods arranged at two ends of the nut. According to the high-precision numerical control lathe, the ball screw rod is arranged in the middle, so that the numerical control lathe is small in oscillation, small in abrasion and high in precision during operation; the processing errors can be greatly reduced; the service life is also prolonged; the safety of the numerical control lathe is ensured; in addition, the screw rod mother base and the screw rod end base are respectively arranged in the lathe body corresponding to the groove, so that the ball screw rod is convenient to maintain, mount and clean; meanwhile, the high-precision numerical control lathe has the symmetrical structure, so that the service life of the numerical control lathe is prolonged.
Owner:张永波

Control system for mobile phone camera module detection

The invention relates to the technical field of camera detection, in particular to a control system for mobile phone camera module detection. The system comprises an acquisition module, a pre-judgingmodule, a compensation module and a judgment module, wherein the acquisition module is used for acquiring a picture of a to-be-detected camera module to obtain an acquired picture; the pre-judging module is used for judging whether the acquired picture meets the requirement or not according to a preset standard; the compensation module is used for carrying out light compensation when the acquiredpicture does not meet the requirement; and the judgment module is used for receiving the acquired picture, searching the edge contour of the camera area on the acquired picture, acquiring the maximumvalue of the shape function gradient of the edge contour, judging that the camera is normally installed if the maximum value of the shape function gradient of the edge exceeds the preset standard gradient maximum value, and otherwise, judging that the camera is abnormally installed. Under the condition that ambient light is detected to be insufficient, collection can be conducted again after lightcompensation, and the technical problem that in the prior art, under the condition that ambient light is detected to be insufficient, accurately judging the installation condition of the camera is difficult is solved.
Owner:SHINE OPTICS TECH CO LTD

Petroleum pipeline installing device used under different geological conditions

The invention discloses a petroleum pipeline installing device used under different geological conditions. The structure of the petroleum pipeline installing device used for the different geological conditions comprises a supporting block, an electric wire winder, a connection supporting rod, a steel wire pulling rope, a wire winding support, a lifting hook, a power source connection wire, a controller, a supporting frame, a fixed supporting rod, a hand rocking rod and a connection base; the hand rocking rod is connected to the upper end surface of the connection base in a nested manner; the fixed supporting rod is welded to one end of the upper end surface of the connection base; the supporting frame is connected with the fixed supporting rod and the connection base; the supporting blockis welded to one end of the fixed supporting rod; the electric wire winder is arranged on the upper end surface of the supporting block, and is connected with the controller through the power source connection wire; and one end of the steel wire pulling rope is connected with the electric wire winder. According to the petroleum pipeline installing device used under the different geological conditions, due to mutual assembling of the above parts, it is achieved that in the installing process of the device, the device can adapt to different geological conditions, the device can still be used forinstalling petroleum pipelines under harsh geological conditions, and practicability is high.
Owner:连琼娥

Door lock base plate

The invention relates to a door lock base plate. The door lock base plate comprises a bottom plate, a lock shaft sleeve hole, base plate fixing screw holes, lock head fixing screw holes and positioning protrusions, wherein the bottom plate is a rectangular metal plate, the lock shaft sleeve hole is formed in the symmetrical center of the bottom plate, the diameter of the lock shaft sleeve hole is larger than that of a lock shaft, the metal plate is provided with the four base plate fixing screw holes which are distributed in a square mode, the center of the square coincides with the symmetrical center of the metal plate, the four lock head fixing screw holes which are distributed in a rectangular mode are parallel to the base plate fixing screw holes, the symmetrical center of the rectangle coincides with the symmetrical center of the bottom plate, and the peripheral edges of the bottom plate are provided with the positioning protrusions which are symmetrically distributed. Due to the fact that a metal piece is additionally arranged between a lock head and a door plank, the thickness of the door plank is indirectly increased, all door locks can be normally installed and used even under the situation that the door plank is thin, the problem that the universality of a traditional door lock and the door plank is solved, and the door lock base plate has high universality and practicality.
Owner:覃玉续

Cable arrangement calculation method and device, equipment and storage medium

The invention discloses a cable arrangement calculation method, and the method comprises: obtaining cable channels, analyzing the connection relation of the cable channels, obtaining a key position, grouping cables according to construction units, obtaining a plurality of cable groups, sorting the plurality of cable groups according to a preset construction unit sequence, and obtaining a cable group sequence; establishing a directed graph corresponding to each cable group according to the cables in each cable group, adding the conditional relation to the directed graph according to a preset sequence, solving the topological sequence of the directed graph to obtain the installation sequence of the cables in each cable group, and calculating the installation priority of the related cables in the cable channel, wherein the two cables with the common path are related cables; and simulating cable installation according to the installation sequence and the installation priority, and determining the final installation positions of the cables. According to the algorithm, the traditional means which can only depend on human experience is changed, so that cross analysis in actual engineering is more efficient, reliable and effective, and the construction quality is greatly improved.
Owner:北京博超时代软件有限公司

Banknote processing device

The invention discloses a banknote processing device, which is used for processing deposit and withdrawal banknotes. The banknote processing device comprises a cash deposit and withdrawal port mechanism, which is used for inputting deposit banknotes and collecting banknotes output due to withdrawal; an identification mechanism, which is used for identifying authenticity and type of the deposit andwithdrawal banknotes; a temporary receiving mechanism, which is configured on a transfer path and is used for temporarily keeping the banknotes identified by the identification mechanism; a pluralityof cash circulation boxes, which are configured on the transfer path and is used for receiving the banknotes; a cycle-type front conveying mechanism; a middle conveying mechanism; an upper conveyingmechanism; and a first gate, wherein the first gate is a circular conveyor belt three-directional mechanism. Under operation of a three-directional switching device, the banknote processing device canobviously improve conveying efficiency, can enable the banknotes to be transmitted in the shortest path and realize that the banknotes can be directly placed into the cash circulation boxes from thecash deposit and withdrawal port mechanism; the banknote processing device can be installed normally under the condition of the minimum area; and the banknote processing device is suitable for variousinstallation site environments.
Owner:KUNSHAN GUAO ELECTRONICS MACHINERY

Vehicle flat wire permanent magnet synchronous motor

The invention discloses a vehicle flat wire permanent magnet synchronous motor. The motor comprises a base, a casing fixedly mounted at the top end of the base, a cooling fin fixedly mounted on the outer wall of the casing, and a plurality of connecting pieces fixedly mounted on two sides of the casing, and is formed by manufacturing stators in batches and then splicing the stators, so working efficiency is greatly improved, and production cost is reduced. integral processing difficulty is reduced, the T-shaped sliding strips, the T-shaped grooves and the first limiting rings are arranged, soinstallation of the flat copper coil and the multiple partition plates is completed, a complete stator structure is formed, operation is easy and convenient, installation efficiency of the flat coppercoil is greatly improved, structures such as the stable sleeve are arranged, and the service life of the flat copper coil is prolonged; the stator iron core can be well clamped in the transverse direction and the longitudinal direction, so that overall fixation is completed, the device can work normally, installation is easy and convenient, and splicing efficiency and stability of the stator structure in the operation process are greatly improved.
Owner:HARBIN UNIV OF SCI & TECH

Anti-broken core mechanical pencil

The invention discloses a mechanical pencil for preventing a pencil lead break, and relates to the field of stationery. The mechanical pencil for preventing the pencil lead break comprises a penholder and a lead pipe through the penholder. The bottom of the lead pipe is in a threaded connection with a thread groove of a pencil point sleeve, and a pencil cap is inserted on the top of the lead pipe. A lead protection pipe is fixed under the bottom of the pencil point sleeve. The mechanical pencil for preventing the pencil lead break is characterized in that the lower part of a locking tooling groove of the pencil point sleeve is slidingly and hermetically fitted with a pressure plate, and the upper part of the locking tooling groove is in a threaded connection with a compaction device, wherein the compaction device is in contact with the pressure plate for cooperation; bulges are symmetrically distributed on the side walls of the pressure plate; vertical grooves A are arranged at the inner side walls of the pencil point sleeve; the bulges are slidingly fitted with the vertical grooves A; the bottom end of the pressure plate and the top end of the lead protection pipe are connected by a sealed hose; and powdery infillings are filled in a hollow cavity between the sealed hose and the pencil point sleeve. The mechanical pencil for preventing the pencil lead break has the advantages that the extra space in the hollow pencil point sleeve can be filled without changing the main structure of the mechanical pencil in the prior art, and the movable range of the pencil lead in the pencil point sleeve can be reduced, so that the occurrence of the pencil lead break can be effectively reduced.
Owner:TAIZHOU LIKE TECH CO LTD

Main tower torsion preventing power transmission tower using lead core rubber

The invention discloses a main tower torsion preventing power transmission tower using lead core rubber, and belongs to the technical field of power transmission towers. The main tower torsion preventing power transmission tower using the lead core rubber comprises a main tower, the main tower is mounted on the ground, a main rotating shaft is arranged on the main tower, a low-hanging-point rotating arm is arranged on the outer side of the main rotating shaft, a low-hanging-point rotating arm sleeve is arranged on the low-hanging-point rotating arm, and the low-hanging-point rotating arm sleeve on the low-hanging-point rotating arm is movably connected with the main rotating shaft on the main tower through a friction piece. According to the main tower torsion preventing power transmissiontower using the lead core rubber, torsion and vibration borne by the main tower are effectively reduced, the main tower is well protected, and the lead core can dissipate kinetic energy and reduce vibration, therefore, beneficial effects of limiting excessive deformation and too fast deformation of the low-hanging-point rotating arm and reducing the vibration are achieved, rotating speed force isreduced, so that slow rotation is performed, and damage to the power transmission tower is reduced, and the influence of overall deformation on subsequent use is prevented, so that the power transmission tower can be maintained and mounted very conveniently.
Owner:马鞍山辰慕芸智能科技发展有限公司

A building glass curtain wall installation structure and its construction method

The invention discloses a building glass curtain wall installation structure and a construction method thereof, and relates to the technical field of building construction. The main points of the technical scheme are: including installation keels, installation parts, curtain wall glass plates, the curtain wall glass plates are provided with piercing holes, and the installation parts It includes a main body and a fixed cover. The main body is provided with an adjustment part. The parts include a connecting rod and an abutting part, and the installation keel is provided with a connecting device, and the connecting device includes a fixing block, a wedge-shaped block one, and a wedge-shaped block two. By setting the adjustment part and the piercing column, the deviation of the punching position of the glass plate and the installation position of the installation part on the keel can be corrected; by setting the limit spring and the adjustment rod, the position of the adjustment part can be adjusted within the curtain wall glass The panel remains stable during installation, which is convenient for personnel to install the glass panel of the curtain wall; the flatness of the surface of the curtain wall is improved by setting the connecting device.
Owner:浙江奥腾建设工程有限公司

A vacuum electronic counting and filling equipment

The invention belongs to the technical field of medicine pill filling, and discloses vacuum electronic multi-particle filling equipment. The vacuum electronic multi-particle filling equipment comprises a conveying system, wherein the conveying system comprises a conveying belt; medicine bottle cups used for containing medicine bottles are arranged on the outer surface of the conveying belt at equal intervals; a medicine filling multi-particle system is arranged above the conveying belt; the medicine filling multi-particle system is provided with a turntable medicine supply system; the medicine filling multi-particle system comprises a medicine filling installing seat and a medicine filling head capable of vertically moving on the medicine filling installing seat; a medicine filling exhaust cap used for locating the medicine bottle is arranged on the medicine filling head; a vacuum generator casing is arranged on the medicine filling installing seat. The vacuum electronic multi-particle filling equipment has the advantages that medicine pills can be precisely sucked out and blown into the medicine bottles through a turntable medicine supply system and the medicine filling multi-particle system; the filling quantity of the medicine pills is controlled through the vacuum generator; the extrusion crushing of the medicine pills is avoided; the precise control on the medicine pill counting is improved; meanwhile, the equipment can be applicable to the filling of the medicine pills with different particle numbers and sizes.
Owner:CHENGDU HEDA AUTOMATION EQUIP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products