Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

42results about How to "Strong on-site practicability" patented technology

Multilayer-section fracturing technique pipe column and construction method thereof

InactiveCN106337673ARealize temporary blockingIncrease productionFluid removalPulse cycleWellhead
The invention discloses a multilayer-section fracturing technique pipe column comprising an oil pipe, a safe releasing sub, an ejector, a ball seat, an oscillator, a sand-oil blender, an oil pipe, a packer and a blank plug which are sequentially connected from top to bottom. A construction method of the multilayer-section fracturing technique pipe column comprises the following steps: putting the pipe column into a well, aligning the ejector with a target segment, feeding a seal ball through an opening of the well, positioning the seal ball on the ball seat so as to seal a liquid flow passage below the ball seat immediately, and performing abrasive perforating by use of the ejector; after abrasive perforating is finished, repeatedly leaching out the seal ball, lifting up the pipe column to seal the packer, injecting sand-laden fluid with a high sand ratio into the oil pipe in a low-displacement manner, and annularly ejecting pure liquid into an oil sleeve; performing a repeated 'lifting-descending' annular displacement step so as to form pulse cycles so as to control down-hole sand concentration in real time, so that temporary blockage of a proppant in a seam is realized, the static pressure in the seam is instantaneously improved, the crack complexity is further improved, and the purpose of improving the well yield through complicated seam-net fracturing is achieved; and after the construction is finished, lifting the pipe column to a next target segment, and repeating the construction process.
Owner:PETROCHINA CO LTD

Prediction method and exploration method of geological sweet spots of reservoir of inter-salt shale series of strata

InactiveCN108956952AHydrocarbon source condition is goodGood storage conditionsMaterial analysis using wave/particle radiationEarth material testingThroatPorosity
The invention provides a prediction method and exploration method of geological sweet spots of a reservoir of inter-salt shale series of strata and relates to the field of petroleum survey. The prediction method comprises the following steps: sampling different shale series of strata in the inter-salt shale series of strata to determine the rocky lithofacies of the shale series of strata; samplingthe shale series of strata with the rocky lithofacies of dolomite to determine the content of organic carbon, vitrinite reflectance, porosity, permeability, flowable pore throat radius, density, structure, soundwave, flowable oil mass heat releasing hydrocarbon and oil saturability index, wherein the rocky lithofacies, hydrocarbon source condition, storage and gathering condition and oil containing characteristic are met; and obtaining the sweet spots of the reservoir of inter-salt shale series of strata and the positions thereof and comparing the prediction result with the exploration result, wherein the relative error is smaller than 20%. The method has relatively high prediction precision and high field practicality. The method applied to exploring the geological sweet spots of the reservoir of inter-salt shale series of strata has relatively excellent field practicality.
Owner:CHINA PETROLEUM & CHEM CORP +1

Modular power supply scheme automatic-generation method based on AR technology and VR technology

The invention discloses a modular power supply scheme automatic-generation method based on the AR technology and the VR technology, and belongs to the technical field of power distribution. The method comprises the steps of integrating the basic databases of a power grid, acquiring the architecture diagram and the openable capacity of the power grid, and ensuring the availability of a power supply point; subjecting a power supply scheme to modular refinement and typesetting, and setting the parameters of options in each type and calibrating the parameters so as to form system point selection parameters; importing the architecture diagram and the openable capacity data of the power grid into a program, and compiling the power supply scheme and a support drawing in cooperation with the system point selection parameters; and displaying the power supply scheme and the support drawing in the 3D form based on a virtual reality module. The related system of the above method comprises an inputting module, a checking and reminding module, a drawing editing module and a virtual reality module, wherein the above modules are sequentially connected. The method is high in efficiency, formal in manufacture, strong in scheme depth property and good in interactivity. Based on the method, construction problems can be found out more quickly and more conveniently. Therefore, the requirements of users in rapid power transmission can be met.
Owner:STATE GRID CORP OF CHINA +1

Ground pipe network and underground oil reservoir complex system production optimization method

PendingCN112539054ARealize production dynamic forecastShort time consumingSurveyMachine learningMathematical modelNetwork agent
The invention relates to a ground pipe network and underground oil reservoir complex system production optimization method. The method includes the steps of selecting an offshore oil field group and an oil field block which need to be subjected to injection-production system adjustment; establishing a multi-stage progressive production gathering and transportation structure model of the offshore oil field group; establishing a ground pipe network and underground oil reservoir complex system production optimization mathematical model; arranging oil field field statistical data or finite oil reservoir numerical simulation results to form time series data, and generating sample points required for training and verifying a deep learning model; establishing an oil reservoir numerical simulationagent model based on a long-term and short-term memory network, and performing training and parameter adjustment; performing optimization solution based on a long-term and short-term memory network agent model and a covariance matrix adaptive evolution strategy; and verifying the injection-production system optimization adjustment effect of the offshore oil field group. According to the ground pipe network and underground oil reservoir complex system production optimization method, an injection-production system of the multiple oil field blocks in the offshore oil field group can be rapidly and comprehensively optimized under a plurality of constraint conditions such as offshore facility liquid volume capacity limitation and the like.
Owner:CHINA UNIV OF PETROLEUM (EAST CHINA)

Rotatable-nozzle-type double-cluster water jet fracturing tubular column and fracturing method

ActiveCN106285606AOriented perforation with uniform azimuthInto the uniformFluid removalHorizontal wellsHelix structure
The invention provides a rotatable-nozzle-type double-cluster water jet fracturing tubular column and a fracturing method. Archimedes double-helix structures are designed in inner cavities of conventional water ejectors structurally, four spherical nozzles are distributed on a double-helix groove of an inner cavity of each ejector body, the flowing state and the flowing direction of fluids with sand are changed to enable the fluids to evenly enter each nozzle, the problem of incapability of adjusting the orientation of nozzles of double-cluster water ejectors of horizontal wells is solved effectively, the problem of unevenness in concentration, flow and pressure of the sand between the upstream nozzles and the downstream nozzles of the bottom-packer-dragging double-cluster water jet fracturing tubular column is also solved, and early failure of some ejector due to uneven washout of the upstream ejectors and the downstream ejectors of the bottom-packer-dragging double-cluster water jet fracturing tubular column is prevented effectively, so that fracturing success rate of directional ejection holes of the double-cluster water jet fracturing tubular column is increased greatly, on-site practicability is high, application effect is remarkable, and the rotatable-nozzle-type double-cluster water jet fracturing tubular column is applicable to bottom-packer-dragging graded double-cluster water jet fracturing process of the horizontal wells.
Owner:BC P INC CHINA NAT PETROLEUM CORP +1

Dismounting method, mounting method and dismounting and mounting device for hydroelectric gate wheel shaft sleeves

The invention discloses a dismounting method, a mounting method and a dismounting and mounting device for hydroelectric gate wheel shaft sleeves. The dismounting and mounting device comprises a supporting base, two supporting rods, a crossbeam, a jack, a pushing cylinder and a plurality of spacer plates. The dismounting method mainly utilizes the dismounting and mounting device, and comprises thesteps that the dismounting and mounting device is first placed at an even position, a wheel, the used shaft sleeve of which needs to be dismounted, is then placed on the supporting base, the pushing cylinder is vertically put upon the used shaft sleeve of the wheel, the plurality of spacer plates are then placed upon the pushing cylinder, the jack is mounted on the spacer plates, and finally, pressure is applied by the jack to press the used shaft sleeve out of the wheel. The mounting method also mainly utilizes the dismounting and mounting device, and comprises the steps that the dismountingand mounting device is first placed at an even position, a wheel into which a new shaft sleeve needs to be mounted is then placed on the supporting base, the new shaft sleeve is placed on a shaft holeof the wheel, the plurality of spacer plates are then placed upon the new shaft sleeve, the jack is mounted on the spacer plates, and finally, pressure is applied by the jack to press the new shaft sleeve into the wheel.
Owner:GUANGXI GUIGUAN ELECTRIC POWER CO LTD

Device and method for quickly calibrating mechanical tensiometer

The invention relates to a device and method for quickly calibrating a mechanical tensiometer. The device comprises a connecting assembly, a sensor, a to-be-measured rope, a grooved rail, a fasteningassembly, a pulley assembly and a weight. The grooved rail is horizontally arranged; the connecting assembly is of an L-shaped structure and comprises a first side plate and a second side plate whichare perpendicular to each other, and the first side plate of the connecting assembly is attached to and fixed to one end of the grooved rail; the pulley assembly is fixed to the other end of the grooved rail; the bottom of the fastening assembly is fixedly located in the middle of the grooved rail; a square groove is formed in the top of the fastening assembly; the second side plate of the connecting assembly is perpendicular to the grooved rail and used for being fixedly connected with one end of the sensor; the other end of the sensor is fixedly connected with a to-be-measured rope; the to-be-measured rope penetrates through the square groove of the fastening assembly and is fastened to the fastening assembly; the to-be-measured rope changes to extend in a vertical direction through thepulley assembly; the weight is fixedly connected to the tail end of the to-be-measured rope; after being installed, the to-be-measured rope is just tangent to the bottom of the square groove of the fastening assembly and the pulley assembly.
Owner:BEIJING SATELLITE MFG FACTORY

A fully sealed electromagnetic shielding impedance box

ActiveCN104502643BEasy to freely configureEliminate the effects of measuring AC high voltage signalsInstrument screening arrangementsCoaxial cableEngineering
The invention relates to a novel full-sealed electromagnetic shielding impedance box. The novel full-sealed electromagnetic shielding impedance box comprises a box body and a foundation, wherein the outer side of the foundation is respectively provided with a grounding end, a foundation outer side measurement end coaxial cable jack and a foundation outer side signal end coaxial cable jack in a circumference direction, the box body comprises an electric field shielding cover and a magnetic field shielding cover which are sleeved with an interval, the electric field shielding cover is arranged at the outer side of the magnetic field shielding cover, intervals are arranged between the top portion and circumference of the magnetic field shielding cover and the electric field shielding cover, and bottom portions of the electric field shielding cover and the magnetic field shielding cover are respectively provided with an opening. The method is more applicable to AC high voltage signal measurement in complex on-site test environments and can realize long-time measurement without influence of external factors such as, an electromagnetic environment, rain, snow, dust storm, on-site wiring and disposing position.
Owner:STATE GRID HENAN ELECTRIC POWER ELECTRIC POWER SCI RES INST +1

Oil extraction transition joint for transformer or reactor

PendingCN108194720AZero pollutionThe work process is neat and orderlyWithdrawing sample devicesScrew threaded jointsTransformerButt joint
The invention discloses an oil extraction transition joint for a transformer or a reactor. The oil extraction transition joint comprises an oil extraction joint body. The oil extraction joint body comprises an oil outlet hole main valve, an oil extraction pipe and an oil outlet head and further comprises a transition joint body. The oil extraction joint body is sleeved with the transition joint body. The transition joint body comprises a hollow cylinder structure joint body, a transition rubber sleeve and a hard thin tube, wherein the transition rubber sleeve and the hard thin tube are arranged in the hollow cylinder structure joint body. According to the oil extraction transition joint, after the transition joint of the transformer or the reactor is unscrewed, the transition joint body isin butt joint with the original position of the oil extraction joint body, the oil extraction pipe is hermetically connected through the coating of a connection cavity, and the oil outlet head is hermetically coated through the transition rubber sleeve, so that oil outlet holes can produce oil in a sealed state, zero pollution of an oil sample can be realized, the working process is neat and orderly, the use is flexible and convenient, and the working efficiency is greatly improved.
Owner:STATE GRID HENAN ELECTRIC POWER ELECTRIC POWER SCI RES INST +2

Mining surrounding rock fracture sliding starting condition and instability process analysis method and system

The invention provides a mining surrounding rock fracture sliding starting condition and instability process analysis method and system, and relates to the technical field of mining engineering dynamic disaster prediction and prevention. The method and system can effectively predict dynamic disasters and greatly reduce the occurrence frequency and hazard degree of deep mining dynamic disasters, and is high in field practicability. According to the method, vertical fracture and horizontal action sliding of an immediate roof and / or an old roof corresponding to a goaf are / is used as judgment bases to analyze the instability state of mining surrounding rocks; the method specifically comprises the steps that a plurality of force sensors, acoustic emission monitoring equipment and micro-seismicsensors which are connected with a monitoring center are arranged in the immediate roof and / or the old roof and are used for collecting the real-time horizontal acting force of the position where thesensors are located and calculating original data needed by real-time vertical fracture energy; and the monitoring center is used for processing the collected data and judging whether early warning iscarried out or not according to a processing result. The technical scheme is suitable for the process of monitoring the collapse and instability of the surrounding rock.
Owner:UNIV OF SCI & TECH BEIJING

A converter movable smoke hood positioning and fall prevention device

ActiveCN108676959BAct as secondary fall preventionExtended service lifeManufacturing convertersSmoke hoodChain link
The invention discloses a locating and falling preventing device for a moving smoke cover of a rotary furnace. The locating and falling preventing device is composed of multiple connecting units for connecting the moving smoke cover of the rotary furnace with a smoke cover fixing beam. Each connecting unit comprises a fixed part and a moving part. The tops of the fixed parts are installed on the smoke cover fixing beam through a girder fixing base. The bottoms of the moving parts are installed around the moving smoke cover through a smoke cover fixing base. The fixed parts and the moving partsare installed in a guiding manner through sliding pairs. The smoke cover fixing base is provided with chains for hoisting. The chains for hoisting are connected with a hoisting device arranged on thesmoke cover fixing beam. The device further has double falling preventing functions on the basis of guiding, the function of a set square and a guide groove is utilized, guiding is more stable, the falling preventing function can also be achieved, and the chains in a moving casing pipe and a fixed casing pipe can have a secondary falling preventing function. After the device is installed on the moving smoke cover, the fault rate is reduced obviously, and meanwhile the service life of the moving smoke cover is prolonged.
Owner:CHINA FIRST METALLURGICAL GROUP

Circuit breaker body three-phase inconsistency protection test box

The invention discloses a three-phase inconsistency protection test box for a circuit breaker body, which relates to the field of power system relay protection acceptance and regular inspection work. The box includes three liquid crystal display timers, and the display part is embedded in a panel for external display. Each liquid crystal The display timer includes a pair of power contacts, a pair of start-up contacts and a pair of stop-watch contacts. There are three pairs of start-up jacks and three pairs of stop-watch jacks on the panel, and each pair of start-up jacks is connected to a pair of Open meter contact, each pair of stop meter jacks is connected to a pair of stop meter contacts; there are four jacks THG, THA, THB, THC and three buttons STA, STB, STC on the panel, inside the THG jack It is connected to the same end of the three buttons, and the three jacks of THA, THB, and THC are respectively connected to the other end corresponding to the three button switches of STA, STB, and STC; the panel is also equipped with a power switch and a grounding jack for the test box shell. AC 220V power supply is adopted. The invention improves the efficiency of regular inspection of protection, shortens the maintenance time during power outages, and enhances the operation reliability of the power grid.
Owner:国网山西省电力公司阳泉供电公司

Oil extraction and slag removal method and system for vertical tar-ammonia water separating process

The invention provides an oil extraction and slag removal method and system for a vertical tar-ammonia water separating process. The system comprises a mechanical slag scrapping tank, a tar-ammonia water separating tank used for receiving a mixture of tar, ammonia water and small-granule tar slag obtained in primary separation, a tar slag pump used for extracting the small-granule tar slag and the tar at the bottom of the tar-ammonia water separating tank, a secondary slag removal apparatus used for receiving the small-granule tar slag and the tar extracted from the bottom of the tar-ammonia water separating tank through the tar slag pump and carrying out secondary separation on the small-granule tar slag and the tar, a tar slag bucket used for receiving large granule tar slag obtained in primary separation and small-granule tar slag obtained in secondary separation and a tar intermediate tank used for receiving tar discharged from the secondary slag removal apparatus and having undergone secondary separation. The system has the advantages of convenience in extraction of the tar, good tar slag removal effects and capacity of thorough discharge of the small-granule tar slag from the system, so blockage of the system is avoided and production of the system is continuous and stable.
Owner:PANGANG GRP XICHANG STEEL & VANADIUM CO LTD

Automatic generation method of modular power supply scheme based on ar technology and vr technology

The invention discloses a modular power supply scheme automatic-generation method based on the AR technology and the VR technology, and belongs to the technical field of power distribution. The method comprises the steps of integrating the basic databases of a power grid, acquiring the architecture diagram and the openable capacity of the power grid, and ensuring the availability of a power supply point; subjecting a power supply scheme to modular refinement and typesetting, and setting the parameters of options in each type and calibrating the parameters so as to form system point selection parameters; importing the architecture diagram and the openable capacity data of the power grid into a program, and compiling the power supply scheme and a support drawing in cooperation with the system point selection parameters; and displaying the power supply scheme and the support drawing in the 3D form based on a virtual reality module. The related system of the above method comprises an inputting module, a checking and reminding module, a drawing editing module and a virtual reality module, wherein the above modules are sequentially connected. The method is high in efficiency, formal in manufacture, strong in scheme depth property and good in interactivity. Based on the method, construction problems can be found out more quickly and more conveniently. Therefore, the requirements of users in rapid power transmission can be met.
Owner:STATE GRID CORP OF CHINA +1

A rotatable nozzle type double-cluster hydraulic jet fracturing string and fracturing method

ActiveCN106285606BInto the uniformSolve the problem of not being able to adjust the orientationFluid removalHorizontal wellsSpray nozzle
The invention provides a rotatable-nozzle-type double-cluster water jet fracturing tubular column and a fracturing method. Archimedes double-helix structures are designed in inner cavities of conventional water ejectors structurally, four spherical nozzles are distributed on a double-helix groove of an inner cavity of each ejector body, the flowing state and the flowing direction of fluids with sand are changed to enable the fluids to evenly enter each nozzle, the problem of incapability of adjusting the orientation of nozzles of double-cluster water ejectors of horizontal wells is solved effectively, the problem of unevenness in concentration, flow and pressure of the sand between the upstream nozzles and the downstream nozzles of the bottom-packer-dragging double-cluster water jet fracturing tubular column is also solved, and early failure of some ejector due to uneven washout of the upstream ejectors and the downstream ejectors of the bottom-packer-dragging double-cluster water jet fracturing tubular column is prevented effectively, so that fracturing success rate of directional ejection holes of the double-cluster water jet fracturing tubular column is increased greatly, on-site practicability is high, application effect is remarkable, and the rotatable-nozzle-type double-cluster water jet fracturing tubular column is applicable to bottom-packer-dragging graded double-cluster water jet fracturing process of the horizontal wells.
Owner:BC P INC CHINA NAT PETROLEUM CORP +1

Versatile cable trench cover plate lifting vehicle of transformer substation

InactiveCN103130140BAvoid smashing accidentsAvoid damagePortable liftingSmall animalTransformer
The invention discloses a versatile cable trench cover plate lifting vehicle of a transformer substation. The versatile cable trench cover plate lifting vehicle comprises a load-bearing base plate (3), a directional wheel (1), a universal wheel (2), a brake unit (4), a lifting vehicle cross beam (10), a lifting vehicle body (20), a material hanging hook (11) and a handrail (8), wherein the lifting vehicle cross beam (10) is connected with a hydraulic jack (12), the lower end of the hydraulic jack (12) is provided with a hydraulic jack operating opening (7), the lifting vehicle body (20) is provided with an operating rod inserting ring (21), and a jack operating rod (6) is inserted inside the operating rod inserting ring (21). By the aid of the versatile cable trench cover plate lifting vehicle, hurting of persons due to crashing can be effectively avoided when workers move a cable trench cover plate manually, the hidden danger of safety production can be eliminated, and the versatile cable trench cover plate lifting vehicle is high in site practicability; and simultaneously, the usage of the device can effectively eliminate damage of the cable trench cover plate during frequent opening and closing, so that the tripping of high-tension lines of the transformer substation, which is caused by the fact that various small animals enter a cable tunnel through the damaged cover plate, can be prevented, and the safety and the reliability of power supply can be effectively guaranteed.
Owner:YANTAI POWER SUPPLY COMPANY OF STATE GRID SHANDONG ELECTRIC POWER +1

Coiled tubing dragging sand blasting perforation and annulus sand filling staged fracturing method

The invention relates to the technical field of multistage fracturing of oil fields, in particular to a sectioned fracturing method adopting coiled tubing dragging sand-blasting perforation and annulus sand-filling. The sectioned fracturing method comprises the steps of first, well dredging and second, tool connecting. According to the sectioned fracturing method adopting coiled tubing dragging sand-blasting perforation and annulus sand-filling, perforation and fracturing integration is achieved through a one-trip pipe column; and interlayer packing is carried out through a sand-filling mode of induction-type sand plugging, and accordingly, a sand-blasting perforation dragging sectioned fracturing technique in a small casing is achieved, namely, coiled tubing dragging for sectioned fracturing of the pipe column and annulus sand-filling for achieving the sectioned fracturing technique can be conducted in a phi 101.6 mm small-size tail tube in a 5.5-inch casing sidetrack drilling horizontal well through the coiled tubing dragging sand-blasting perforation and annulus sand-filling sectioned fracturing method. According to the method, packing operation can be completed without a packer, therefore, by adopting the method, the cost of the packer is saved, and accordingly the construction cost is reduced.
Owner:BC P INC CHINA NAT PETROLEUM CORP +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products