The CRH5 EMU reconnection 
simulation debugging device involves the technical field of EMU maintenance and test technology. In order to solve the 
complex problems that cannot be solved in time in the existing EMU reconnection test process, it is difficult to guarantee the quality of maintenance and the test is not comprehensive.  And problems such as poor versatility, provide a CRH5 type EMU reconnection 
simulation debugging device, including the thermal axis main engine integrated in the movable cabinet, monitoring computer, terminal IO device, PIS 
simulation test device, 
Ethernet switch, reconnection gateway  and coupler connector tooling; the CRH5 EMU reconnection simulation debugging device described in the present invention is small in size, light in weight, and easy to move, and can effectively avoid high-risk operations such as repeated pulling of EMUs, detachment of reconnection, and 
backtracking.  And it can reduce the labor intensity of workers and improve the 
utilization rate of the 
plant.  The construction and maintenance are convenient, the man-
machine interface is friendly, the operation is simple, the production efficiency is improved, and the maintenance / debugging cycle is shortened.