Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

35results about How to "Fast on-site assembly" patented technology

Prefabricated part combined enclosing wall and installing method thereof

The invention provides a prefabricated part combined enclosing wall and an installing method thereof. The prefabricated part combined enclosing wall comprises a foundation, columns, column caps, bottom beams, wall boards and wall caps. Column foot connecting parts of the lower portions of the columns are inserted and connected to prefabricated bolts of foundation prefabricated parts and are fastened. Bottom beam tenons at two ends of each bottom beam are respectively inserted and connected into column holes formed in the lower portions of the left and right columns. Wall board grooves formed in the left and right sides of the wall boards are respectively inserted into column convex ribs of the left and right columns, and the wall board convex ribs at the lower portions of the wall boards are inserted into the bottom beam grooves formed in the bottom beams. Wall cap tenons at two ends of each wall cap are respectively inserted into the column holes formed in the upper portions of the left and right columns, and the wall cap grooves formed in the lower portions of the wall caps are inserted into the wall board convex ribs at the upper portions of the wall boards. The column caps are buckled at the tops of the columns, and the tops of the columns are inserted into the column cap grooves of the lower portion of the column caps. The prefabricated part combined enclosing wall is assembled by adopting a prefabricated part splicing method, is high in construction efficiency, strong in wind-resistant capability, attractive and durable and can be repeatedly used as required.
Owner:CHINA CONSTR FIRST GROUP THE FIFTH CONSTR +1

Construction method and application of fabricated concrete road plate

PendingCN111764216AReduce constraintsThe construction period is easy to guaranteeTemporary pavingsEmergency rescueArchitectural engineering
The invention belongs to the technical field of concrete pavements, and particularly relates to a construction method and an application of a fabricated concrete road plate. According to the method, road construction is completed rapidly and neatly through six steps of prefabricating the concrete road plate, constructing a foundation base layer, laying a waterproof layer and a sand cushion layer,installing the road plate, treating plate seams and soil road shoulders and constructing auxiliary engineering. The road plate disclosed by the invention is prefabricated and produced in factories; the road plate is small in limitation of open-air weather, and a construction period is easy to guarantee; and the road plate is uniform in standard size, simple in mold manufacturing and convenient inconcrete pouring, and the road plate is suitable for various roadbeds with a certain bearing capacity, is suitable for temporary transportation roads and storage fields, and is also very suitable forroad construction of emergency rescue and disaster relief. All procedures are smoothly connected, construction equipment is centralized, waste is little during splicing and can be treated in a centralized mode, and an influence of field installation on the environment is very small.
Owner:中交二公局第六工程有限公司

Composite material space truss joint and method

ActiveCN103397702AFirmly connectedTroubleshoot node connectivity issuesBuilding constructionsPre stressEngineering
The invention discloses composite material space truss joint and method. The composite material space truss joint comprises composite material square tube connectors, composite material circular tube connectors and a bolt-sphere joint. The composite material square tube connectors and the composite material circular tube connectors are connected with the bolt-sphere joint through high-strength bolts. The composite material space truss joint covers reliable connection of two closed sections of most frequently used circular tubes and square tubes in the space truss structure, joint form is complete, and the problem of the joint of the composite material closed sections in the application of the space truss structure is basically solved. Steel slabs and the cementitious composite connecting mode can provide joint strength as required in the structure, and the advantages of high strength of composite materials can be effectively exerted. Winding of aramid fiber cloth helps improve the overall performance of the joint, so that the joint strength is further improved, and anti-corrosion area in joint regions are reduced. Joint production is completed in factories that guarantee production precision, on-site assembly is fast, assembly fee is low, and time limit is short. Prestress application is omitted during the production, and bearing capacity degradation caused by creep of the composite materials is no need to worry about.
Owner:SOUTHEAST UNIV

Special tool and method for demounting and mounting of high-pressure self-sealing manhole

The invention relates to a demounting and mounting method and a demounting and mounting tool, in particular to a special tool and method for demounting and mounting of a high-pressure self-sealing manhole. The special tool comprises a chain block, a cross beam used for fixing the chain block and a stand column used for supporting the cross beam. The special tool is characterized in that a locating pin matched with a bolt hole, for fixing a four-element ring, in the circumference of the manhole is fixed to one end of the cross beam; a sleeve is fixed to the upper end of the stand column used for supporting the cross beam; the chain block is mounted on the cross beam through a pulley set; a thread matched with a threaded hole, for mounting of a lifting screw, in a manhole sealing cover is arranged at one end of a take-out rod; and a lifting ring matched with chain block is fixed to the middle of the take-out rod. The demounting and mounting tool and method have the beneficial effects of being simple in structure, convenient to use, high in demounting and mounting efficiency, good in safety and the like and are especially suitable for demounting and mounting of the inner-sealing high-pressure container manhole.
Owner:宁夏众力升汽车配件制造有限公司

A composite material grid connection node and method

ActiveCN103397702BFirmly connectedTroubleshoot node connectivity issuesBuilding constructionsPre stressEngineering
The invention discloses composite material space truss joint and method. The composite material space truss joint comprises composite material square tube connectors, composite material circular tube connectors and a bolt-sphere joint. The composite material square tube connectors and the composite material circular tube connectors are connected with the bolt-sphere joint through high-strength bolts. The composite material space truss joint covers reliable connection of two closed sections of most frequently used circular tubes and square tubes in the space truss structure, joint form is complete, and the problem of the joint of the composite material closed sections in the application of the space truss structure is basically solved. Steel slabs and the cementitious composite connecting mode can provide joint strength as required in the structure, and the advantages of high strength of composite materials can be effectively exerted. Winding of aramid fiber cloth helps improve the overall performance of the joint, so that the joint strength is further improved, and anti-corrosion area in joint regions are reduced. Joint production is completed in factories that guarantee production precision, on-site assembly is fast, assembly fee is low, and time limit is short. Prestress application is omitted during the production, and bearing capacity degradation caused by creep of the composite materials is no need to worry about.
Owner:SOUTHEAST UNIV

Conversion connection structure of fabricated structural column variable cross-section joint steel bar and implementation method

The invention relates to the technical field of building engineering and fabricated concrete structures, and in particular to a conversion connection structure of a fabricated structural column variable cross-section node steel bar and an implementation method. A traditional joint steel bar conversion connection structure needs to bend the steel bar. The conversion connection structure of the fabricated reinforced concrete structural column variable cross-section node steel bar comprises an upper section column and a lower section column, wherein a conversion steel plate is arranged between the upper section column and the lower section column, a first connecting hole, a second connecting hole and a pouring reserved hole are reserved on the surface of the conversion steel plate, a groutingsleeve is arranged in the upper section column, a short bar is arranged between the grouting sleeve and the second connecting hole for connection, a second longitudinal steel bar in the lower sectioncolumn is connected with the first connecting hole, concrete layers are among between the short bar, the conversion steel plate and the second longitudinal steel bar to form a whole, the steel bar does not need to be bent, a reasonable linear stress state of the steel bar is guaranteed, and a good development prospect is achieved in the technical field of building engineering combined structures.
Owner:河南省第二建设集团有限公司 +1

Recoverable side slope temporary protection structure and construction method thereof

InactiveCN108396753AAssembly environmental protectionFast constructionExcavationsSteel platesSurface plate
The invention discloses a recoverable side slope temporary protection structure which comprises a grid panel laid along the surface of a side slope. Concrete pressing tops are poured to the top part and the bottom part of the grid panel; preformed holes are uniformly distributed in a side slope soil body; hollow steel pipes with sharp anchor-shaped head parts are arranged in the preformed holes; cement pastes are fully pressure-injected into inner cavities of the hollow steel pipes; the cement pastes are fully injected into clearances of the preformed holes through through holes formed in hollow steel pipe walls; the tail parts of the hollow steel pipes extend to penetrate through the grid panel and are then connected with a pressure welding steel plate in a sleeving way; the pressure welding steel plate is fixed through screwing nuts; a steel wire rope net covering the grid panel is arranged under the pressure welding steel plate; and steel wire ropes forming the steel wire rope net are connected with the hollow steel pipes in a winding way. The invention discloses a construction method of the recoverable side slope temporary protection structure at the same time. According to therecoverable side slope temporary protection structure and construction method thereof provided by the invention, the construction speed can be effectively improved, the construction quality is improved, and the construction cost is reduced.
Owner:ZHENGZHOU ENG CO LTD CHINA RAILWAY SEVENTH GRP

Reinforcement connection assembly and concrete reinforcement connection system and construction method thereof

The invention discloses Rebar connection components and their Connection system and construction method, steel bar connection assembly, the connecting steel bar includes an extension part and an expansion part, the sleeve has an open end and a closed end, the extension part of the connecting steel bar passes through the closed end of the sleeve, so that the expansion part of the connecting steel bar Located in the sleeve, one end of the connecting rod is expanded and deformed to form a thickened end. The peripheral wall of the connecting rod is provided with a plurality of extrusion blocks that are in contact with the peripheral wall of the connecting rod, and the extrusion block is arranged on the side away from the connecting rod There is a metal spring ring, the metal spring ring is coaxial with the connecting rod, and all the extrusion blocks are extruded and bound on the peripheral wall of the connecting rod through the metal spring ring. The outer diameter of the metal spring ring is larger than the inner diameter of the sleeve. The metal spring ring is squeezed on the inner diameter surface of the sleeve in the way of interference fit, and there is a gap A between the expansion section of the connecting steel bar and the inner wall of the sleeve, and the lower sleeve plug is located in the gap A and is consistent with the shape of the gap A .
Owner:SICHUAN INSITITUTE OF BUILDING RES

Intelligentized wellhead flood prevention cylinder and using method thereof

The invention relates to an intelligentized wellhead flood prevention cylinder and a using method thereof. The intelligentized wellhead flood prevention cylinder comprises a fence, tensile cloth, a steel ring, a buoy, support rods, ballast, water level marks and an automatic control component, an inner ring of the fence is fixed by the tensile cloth and the support rods to form a water accumulation area of the flood prevention cylinder, the steel ring and the ballast are arranged at the positions, close to a wellhead, of the flood prevention cylinder, electric stretching devices are arranged on the support rods, and according to a water potential situation at the wellhead preventing flood, a user can input a length value for stretching rods manually through the automatic control component so as to control the electric stretching devices to adjust lengths of the support rods and enable the height of the fence to reach a preset height. The intelligentized wellhead flood prevention cylinder has the advantages that simplicity in structure, reasonable design and convenience in operation and use are realized, flood prevention work can be carried out in the shortest time in case of emergency, work efficiency of field operation is improved effectively, the user can be ensured to be protected from accidents at the same time, one of the highlights is the intellectualized design of the flood prevention cylinder, and the intelligentized wellhead flood prevention cylinder can be popularized and applied widely.
Owner:BEIJING DRAINAGE EQUIP

Detachable load-bearing support frame

The invention discloses a portable load-bearing support frame. The portable load-bearing support frame comprises a square base, support plates, movable transverse rods and movable diagonal rods, wherein each support plate is formed by welding two support rods and fixed transverse rods and fixed diagonal rods distributed between the support rods; connecting plates provided with pin holes are welded on the support rods; brace rod seats provided with mounting grooves and pin holes are welded on the four top corners on one side or both sides of the square base; mounting plates provided with pin holes are welded at the two ends of each support rod respectively; the two support plates are arranged on the four brace rod seats of the square base; the movable transverse rods and the movable diagonal rods are arranged on the connecting plates between two corresponding support rods through pins or bolts. The huge-size load-bearing support frame fixedly into a whole is transported or stored by being disassembled into parts, thereby greatly increasing the transport efficiency and reducing the storage area. The portable load-bearing support frame has the advantages of high field assembly field, flexibility in adjusting the mounting height as required, and the like, and is a load-bearing support frame which is more consistent with the construction requirement.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD +1

Oil and gas field drilling fluid sludge treatment method

The invention discloses a drilling fluid sludge treatment system for an oil-gas field and a method using the system, relating to the drilling fluid sludge treatment technology for the oil-gas field. The system comprises skid-mounted equipment (B), treatment equipment (C) and a sludge tank (A), wherein the sludge tank (A), the skid-mounted equipment (B) and the treatment equipment (C) are connected in sequence; a drilling fluid wastewater outlet (A2) and a flushing water outlet (A3) are respectively connected with a drilling fluid wastewater inlet (B1); a 2# sludge outlet (B3) is connected with a 2# sludge inlet (C1); a wastewater outlet (C3) for sludge dewatering is connected with the drilling fluid wastewater inlet (B1); a filtered water outlet (B2) is connected with a filtered water recycling inlet (A5). According to the system, the soil does not need to be dug on site for building the large sludge tank, and drilling fluid sludge can be timely treated on site and subjected to emission on standard and in-place landfill; the process is simple, the transportation is convenient, and the field assembly is quick; the area occupation is small, the automation level is high, and the system can move along with the transfer of the drilling work.
Owner:中国石油天然气股份有限公司长庆油田分公司第二采气厂

Decoration heat-insulating composite wall body and preparation method thereof

InactiveCN108252480AImprove the seismic performance of buildingsSecurity Strength Performance ImprovementCovering/liningsWallsKeelSlurry
The invention relates to the field of buildings, in particular to a decoration heat-insulating composite wall body and a preparation method thereof. The manufacturing method comprises the following steps that a first metal keel and a first inorganic plate opposite to the first metal keel are fixed to a main body structure, a plurality of screws sequentially penetrate through the first metal keel and the first inorganic plate and are fixed to the first metal keel and the first inorganic plate, and screws located on the main body structure sequentially penetrate through the first metal keel andthe main body structure and are fixed to the first metal keel and the main body structure. An outer wall decoration plate is mounted and fixed to the outer side of the first metal keel through dry hanging pieces, and heat-insulating slurry is injected into a space between the outer wall decoration plate and the first inorganic plate. According to the decoration heat-insulating composite wall bodyand the preparation method thereof, safety, reliability and stability are achieved, the building anti-seismic performance is improved, the building weight is reduced, the on-site assembling speed is high, the building mounting period can be shortened, decoration, heat insulation and a wall body are integrated, the wall body does not need to be built again, the cost performance is high, and the decoration effect is good.
Owner:肖群伟

Magnesium oxychloride outer wall heat-preservation heat-insulation fireproof compound decoration plate

InactiveCN108252466AImprove the seismic performance of buildingsSecurity Strength Performance ImprovementCovering/liningsSlurryExternal cladding
The invention relates to the field of buildings, in particular to a magnesium oxychloride outer wall heat-preservation heat-insulation fireproof compound decoration plate and a manufacturing method thereof. The manufacturing method comprises the following steps that a first metal keel and a first inorganic plate opposite to the first metal keel are fixed on a main body structure; a plurality of screw rods sequentially penetrate through and are fixed to the first metal keel and the first inorganic plate, wherein the screw rods at the main body structure sequentially penetrate through and are fixed to the first metal keel and the main body structure; an outer wall decoration plate body is mounted, and the outer wall decoration plate body is fixed to the outer side of the first metal keel through a dry hanging piece; and a heat-preservation slurry material is injected into the space between the outer wall decoration plate body and the first inorganic plate. According to the magnesium oxychloride outer wall heat-preservation heat-insulation fireproof compound decoration plate and the manufacturing method thereof, safe, reliable and stable effects are achieved, the seismic performance of the buildings is improved, the weight of the buildings is decreased, the site assembly speed is high, the building mounting cycle can be shortened, decoration, heat preservation and a wall body areintegrated into one, the wall body is not required to be built again, the cost performance is high, and the decoration effect is good.
Owner:秦春玉

Fabricated decorative plate integrated access hole

The invention discloses a fabricated decorative plate integrated access hole. The fabricated decorative plate integrated access hole comprises an access plate body, a cover plate and two telescopic springback limiting devices, and an access opening is formed in the access plate body; the cover plate is used for covering the access opening; a limiting step is arranged on the lower side of the cover plate; one ends of the telescopic springback limiting devices are fixedly connected to the access plate body, and the other ends of the telescopic springback limiting devices are used for abutting against the inner side face of the cover plate; the two springback limiting devices are correspondingly arranged on the upper side and the lower side, close to the access opening, of the access plate body; a hollow accommodating cavity is formed in the lower side, close to the access opening, of the access plate body and is used for accommodating the cover plate; and a limiting clamping groove matched with the limiting step for limiting is formed in the access plate body. The fabricated decorative plate integrated access hole is simple in structure, easy to manufacture and easy and fast to assemble on site; and in addition, when the access hole is in an open state, the cover plate can be conveniently placed in the accommodating cavity formed in the access plate body, and damage or pollution of the cover plate can be avoided.
Owner:ZHEJIANG YASHA DECORATION

Quick-mounting flood prevention barrel device for urban drain well and utilization method of quick-mounting flood prevention barrel device

The invention relates to a quick-mounting flood prevention barrel device for an urban drain well and a utilization method of the quick-mounting flood prevention barrel device. The device comprises an enclosure, stretching cloth, a steel ring, a buoy, supporting rods, a ballast, water level marks and a seal cover. The inner periphery of the enclosure is fixed by the stretching cloth and the supporting rods to form a flood prevention barrel water accumulation area; the buoy is arranged at the top of the enclosure and used for making the top end of the flood prevention barrel water accumulation area float to intercept water; the steel ring and the ballast are arranged at the position, close to a wellhead, of the flood prevention barrel, the ballast is provided with clamping parts, and the steel ring is provided with fasteners matched with the clamping parts; the seal cover is detachably pivoted to the top of the enclosure. The flood prevention barrel device further comprises a supporting rod length control system. The quick-mounting flood prevention barrel device and the utilization method thereof have advantages that structural simplicity, reasonable design and convenience in operation and use are realized, flood prevention in shortest time in emergency can be realized, onsite operating efficiency is effectively improved, and personnel can be guaranteed against accidents; in addition, owing to intelligent design, extensive popularization and application can be realized.
Owner:BEIJING DRAINAGE EQUIP

Foamed ceramic decorating board and preparation method thereof

InactiveCN108240081AImprove the seismic performance of buildingsSecurity Strength Performance ImprovementCovering/liningsFlooringKeelSlurry
The invention relates to the field of buildings, in particular to a foamed ceramic decorating board and a preparation method thereof. The preparation method includes the following steps that a first metal keel and a first inorganic board opposite to the first metal keel are fixed on a main structure; a plurality of screw rods sequentially penetrate through and are fixed to the first metal keel andthe first inorganic board, wherein the screw rods located at the main structure sequentially penetrate through and are fixed to the first metal keel and the main structure; an outer wall decorating board is mounted and fixed to the outer side of the first metal keel through a dry hanging piece; and heat insulation slurry is injected into the space between the outer wall decorating board and the first inorganic board. According to the foamed ceramic decorating board and the preparation method thereof, the foamed ceramic decorating board is safe, reliable and stable, the anti-seismic performance of a building is improved, the weight of the building is lowered, the on-site assembling speed is high, the building installation period can be shortened, decoration, heat insulation and a wall areintegrated, a wall does not need to be built, and the foamed ceramic decorating board is high in cost performance and good in decorating effect.
Owner:周金妹

Movable dust removal discharging vehicle

InactiveCN111483835AMaximize the effect of dust removalEfficient dust removalLoading/unloadingAdhesive beltVehicle frame
The invention discloses a movable dust removal discharging vehicle, and relates to the field of discharging vehicles. The discharging vehicle comprises a frame, one side of the frame is connected witha conveying frame, a dust remover is fixedly mounted above the frame, conveying adhesive tape is laid on the conveying frame, one end of the conveying frame communicates with a feeding opening, the other end of the conveying frame communicates with a dividing device, the dividing device communicates with the dust remover, the dividing device is vertically mounted and comprises a middle falling channel and two side falling channels on the two sides of the middle falling channel, the middle falling channel is of a dual-layer structure, plug valves are fixed to the falling channels, the dust remover is provided with a first dust removing opening, a second dust removing opening and a third dust removing opening in cooperation with the falling channels, the first dust removing opening communicates with an inlet of the dividing device, the second dust removing opening and the third dust removing opening are each arranged to be close to a falling opening of each side falling channel througha dust suction channel, according to the discharging vehicle, according to use needs, multiple discharging openings are arranged, a matched dust removal channel is mounted, therefore, dust pollution is avoided, and integrated design manufacturing is finished.
Owner:衡水金太阳输送机械工程有限公司

Prefabricated component composite wall and its installation method

The invention provides a prefabricated part combined enclosing wall and an installing method thereof. The prefabricated part combined enclosing wall comprises a foundation, columns, column caps, bottom beams, wall boards and wall caps. Column foot connecting parts of the lower portions of the columns are inserted and connected to prefabricated bolts of foundation prefabricated parts and are fastened. Bottom beam tenons at two ends of each bottom beam are respectively inserted and connected into column holes formed in the lower portions of the left and right columns. Wall board grooves formed in the left and right sides of the wall boards are respectively inserted into column convex ribs of the left and right columns, and the wall board convex ribs at the lower portions of the wall boards are inserted into the bottom beam grooves formed in the bottom beams. Wall cap tenons at two ends of each wall cap are respectively inserted into the column holes formed in the upper portions of the left and right columns, and the wall cap grooves formed in the lower portions of the wall caps are inserted into the wall board convex ribs at the upper portions of the wall boards. The column caps are buckled at the tops of the columns, and the tops of the columns are inserted into the column cap grooves of the lower portion of the column caps. The prefabricated part combined enclosing wall is assembled by adopting a prefabricated part splicing method, is high in construction efficiency, strong in wind-resistant capability, attractive and durable and can be repeatedly used as required.
Owner:CHINA CONSTR FIRST GROUP THE FIFTH CONSTR +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products